Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1812-0471 FOLDER # 2
1180659 Summary
15620-611-30-45-99-2020-05-12
1725901C15.0.3-C15.0.3
2-Hour FIre Wall Product Approval
County Change of Contractor
Daily Report Inspection_026_030321
Energy Codes-Energy Conservation 1 of 3
Energy Codes-Energy Gauge Summit 2 of 3
Energy Codes-Project Info 3 of 3
Engineering
E-one Start Up Sheet 10-28-2020 1-50-53 PM
FPR MRO Hangar and Office Comments Response Letter.pdf
FPR MRO Hangar_Construction Documents.pdf
FPR MRO Hanger T&B Report
FW_ MRO Termite
Hollow Metal Door Frame Product Appr 09.03.20
Hydraulic Calcs - Remote Area - A
Hydraulic Calcs - Remote Area - B
Hydraulic Calcs - Remote Area - C
jeremy rf
Mechanical Sub Agreement
MRO C9.02 Floor Trench Drain REVISION plan_SIGNED 7.30.20, response to comments
MRO HANGAR - As Builts - Complete Set
MRO HANGAR Floor Trench Drain REVISION plan
P101 - RFI 33R1
Product Review Affidavit
REVISION FORM, 24.2_MLM_2020-12-07,draft curtain required at each main frame rafter
REVISION FORM, MRO Hangar Floor Trench drain_, UPDATED 7.28.20
REVISION, BXUV.U411 _ UL Product iQ 9.2.2020
REVISION, FL. Product Approval for YHC300 9.2.2020
REVISION, MRO frame-draft curtain_A-1 signed, 12.08.20
REVISION, MRO HANGAR Floor Trench Drain REVISION plan, 7.24.20
REVISION, MRO Hangar Metal Bldg_Rev_Windload_application
REVISION, MRO Hangar Metal Bldg_Rev_Windload_application 7.24.20
REVISION,Hollow Metal Door Frame Product Approval 2017, 9.2.2020
Revisions; Building Plans
Revisions; Curtain Wall System - Storefront
S.I. Threshold Completion Progress Letter_MRO_020821
Storefront Product Approval
Sub Permit - 3191 Jet Terrace
Summary
Termite Treatment
Termite Treatment (2)
Threshold Report Summary No 1 revised - Copy
UL Detail 3A-A606
UL Detail 3A-A606 (2)
UL Sheet A604
UL Sheet A604 (2)
UL Sheet A606
UL Sheet A606 (2)
UL U425 Wall Assembly
UL U425 Wall Assembly (2)
Weekly Report No. 10 March 23-March 27 FPR MRO Hangar_package
Weekly Report No. 11 April 13-April 17 FPR MRO Hangar_package
Weekly Report No. 12 April 20-April 24 FPR MRO Hangar_package
Weekly Report No. 13 April 27-May 1 FPR MRO Hangar_package
Weekly Report No. 14 May 4 - May 8 FPR MRO Hangar_package_July 2020
Weekly Report No. 15 July 27 - July 31 FPR MRO Hangar_package
Weekly Report No. 16 September 8 - September 11 FPR MRO Hangar_package
Weekly Report No. 17 February 1 - February 5 FPR MRO Hangar_package
Weekly Report No. 18 February 15 - February 19 FPR MRO Hangar_package
Weekly Report No. 18v2 February 15 - February 19 FPR MRO Hangar_package
Weekly Report No. 2 Sept 16-20 FPR MRO Hangar_July 2020
Weekly Report No. 3 Sept 30-Oct 4 FPR MRO Hangar_July 2020
Weekly Report No. 4 Oct 28-Nov 1 FPR MRO Hangar_July 2020
Weekly Report No. 5 Nov 4-Nov 8 FPR MRO Hangar
Weekly Report No. 6 Nov 11-Nov 15 FPR MRO Hangar
Weekly Report No. 7 Nov 18-Nov 22 FPR MRO Hangarv2
Weekly Report No. 8 Dec 2-Dec 6 FPR MRO Hangar_v3
Weekly Report No. 9 Feb 24-Feb 28 FPR MRO Hangar_package