Loading...
HomeSearchMy WebLinkAbout1712-0596 # 230 DAY TEMPORARY POWER RELEASEALUMINUM DOORAPPLICATION FOR DEFERRAL 3-8-19APPLICATION FOR PERMIT DEFERRAL 9-6-18Blower Door TestBOARD OF ADJUSTMENT RESOLUTIONBUILDING PERMIT APPLICATIONCERTIFICATE OF INSTALLATIONCERTIFICATION FOR DESIGN LOAD COMPLIANCECONSTRUCTION PLANSELEVATION CERTIFICATE 8-11-18ELEVATION CERTIFICATE 9-25-18ELEVATION SITEElevation, final certENERGY EFFICIENCY CODEENERGY EFFICIENCY CODE 11-29-17ENGINEERING EVALUATION REPORTENVIRONMENTAL PROTECTIONFILLED LAND AFFIDAVIT 12-26-17FPL LETTER OF SERVICE AVAILIABILITYHVAC LOADSInsulationINSULATION INSTALLATION CERTIFICATEKSMKSM NUCLEAR DENSITY TEST 3-8-19KSM NUCLEAR DENSITY TEST RESULTS 5-28-19KSM PILE INSTALLATION INSPECTION 7-10-18KSM PILE INSTALLATION INSPECTION 7-12-18KSM PILE INSTALLATION INSPECTION 9-6-18KSM REPORT 9-28-18KSM REPORT COMPRESSIVE STRENGTH OF CONCRETE SPECIMENSKSM REPORT COMPRESSIVE STRENGTH OF CONCRETE SPECIMENS 1-2-19LETTER - NUCLEAR DENSITY TEST 9-6-18LETTER- FINISHED FLOORWAIVERLETTER PERMIT 1712-0596MEMORANDUMNOA'SNOCNOTICE OF PREVENTATIVE TREATMENTS FOR TERMITES 8-17-17PILE BATCH TICKETS 7-13-18PLANSPLAT OF SURVEY APPROVE 5-1-20PLAT OF SURVEY APPROVED 2-11-20PRODUCT REVIEW AFFIDAVIT 12-26-17REVIEW COMMENTS LETTERREVISIONREVISION 4-22-19REVISION 5-16-19REVISION 7-16-19REVISION STAIR PLAN 3-12-20SUB-CONTRACTOR AGREEMENT 12-26-17TEMPORARY DRIVEWAY PLAN & DETAILSTERMITE PREVENTIION TREATMENTTRUSSTRUSS PLACEMENT PLANUTILITYWELFER QUALIFICATION TEST REPORT