Loading...
HomeSearchMy WebLinkAbout1908-0215 # 210 Concrete Placement - South Building (12-15-21)11 Concrete Placement - South Bldg (1-31-22)12 General - South Bldg (2-3-22)13 General - South Bldg (2-4-22)14 Concrete Placement - South Bldg (2-10-22)15 Reinforcing Steel - South Building (3-3-22)16 Concrete Placement - South Bldg (3-7-22)17 Reinforcing Steel - South Bldg (3-10-22)18 Concrete Placement (3-16-22)19 Concrete Placement (3-19-22)1908-0125_2017-09 - rv2 A1.30 (200601)1908-0215_2017-09 - rv2 A1.43 (200601)1908-0215_rv2 2017-09 - A1.02 (200601)1908-0215_rv2 2017-09 - A1.10 (200601)1908-0215_rv2 2017-09 - A1.23 (200601)1908-0215_rv2 2017-09 - A1.24 (200601)1908-0215_rv2 2017-09 - A1.25 (200601)1908-0215_rv2 2017-09 - A1.38 (200601)1908-0215_rv2 2017-09 - A1.39 (200601)1908-0215_rv2 2017-09 - A1.40 (200601)1908-0215_rv2 2017-09 - A1.40 (200602)1908-0215_rv2 2017-09 - A1.41 (200601)1908-0215_rv2 2017-09 - A1.42 (200601)1908-0215_rv3 2017-09 - A1.20 (200622)1908-0215_rv3 2017-09 - A1.21 (200622)1908-0215_rv3 2017-09 - A1.32 (200622)1908-0215_rv3 2017-09 - A1.33 (200622)1908-0215_rv3 2017-09 - A1.36 (200622)1908-0215_rv3 2017-09 - A1.37 (200622)1908-2015_rv2 2017-09 - A2.11 (200601)1908-2015_rv2 2017-09 - A3.11 (200601)1908-2015_rv2 2017-09 - A4.11 (200601)1908-2015_rv2 2017-09 - A4.22 (200601)1908-2015_rv2 2017-09 - A4.23 (200601)1908-2015_rv2 2017-09 - A4.24 (200601)1908-2015_rv2 2017-09 - A6.10 (200601)1908-2015_rv2 2017-09 - A6.11 (200601)3 Reinforcing Steel - South Building (11-8-21)4 Reinforcing Steel - South Bldg (11-10-21)THRESHOLD INSPECTION REPORT5 Concrete Placement - South Building (11-11-21)6 Reinforcing Steel - South Building (11-15-21)7 Reinforcing Steel - South Building (11-16-21)8 Concrete Placement - South Building (11-18-21)/INSPECTION REPORT #88 Concrete Placement -South Building (11-18-21)9 Reinforcing Steel - South Building (12-14-21)Approved Site PlanAtlas Piles LetterBuilding Permit ApplicationBuilding PlansChristelle Cay 4804 ASA.pdfChristelle Cay Private ProviderConstruction Sign Off SheetConversion Rate EnlargedCristelle Cay S. Bldg. Code 103 120621.pdfCristelle Cay S. Building 2nd Floor Decking Conduit.pdfCristelle Cay South Bldg. 420 UG Plumbing.pdfCristelle Cay South Bldg. Code 103 120321.pdfdoc02426220210524113255engineeringEOR signed sealedFDEP PERMITImpact fees letterLetter; 12 new Addresses for ParcelLetter; Site Dev. Permit Modificationletter_2017-09 Saint Lucie County Let 200527Mahi Mahi Garage requirements 28May21Notice to Proceed & Permit for ConstructionPDS Order 18-047permit_SL-356 FO_issued (exp 2023)Pile Cap Documentation - signed and sealedPILES INTEGRITY- Low Strain Dynamic Impact Integrity Report - Piles 31 46 55 63 71 88 and 128 - Cristelle Cay Condominium WKC SSProperty Combination ApplProperty IdentificationRESP TO COM, POOL AREA , PS1.1RESP TO COMMENTS 6.13.20 12.S1.5-ModelRESP TO COMMENTS 6.13.20 12.S2.1-ModelRESP TO COMMENTS 6.13.20 12.S3.1-ModelRESP TO COMMENTS , 6.13.20 12.S4.1-Rev1RESP TO COMMENTS , 6.13.20 12.S4.2-ModelRESP TO COMMENTS , 6.13.20 12.S1.1-Rev2RESP TO COMMENTS ,6.13.20 12.S1.3-ModelRESP TO COMMENTS 6.13.20 12.S3.2-Rev1RESP TO COMMENTS, 6.13.20 12.S1.2-ModelRESP TO COMMENTS, 6.13.20 12.S3.3-ModelRESP TO COMMENTS, 6.13.20 S1.1RESP TO COMMENTS, 6.13.20 12.S1.4-ModelReview CommentsREVISED DRAWING,_rv4 2017-09 - A1.21 (200624)6.27.20REVISED DRAWING_rv4 2017-09 - A1.20 (200624)6.27.20REVISED DRAWINGS,_rv4 2017-09 - A1.32 (200624)6.27.20REVISED DRAWINGS,rv4 2017-09 - A1.33 (200624)6.27.20REVISED DRAWINGS_rv4 2017-09 - A1.36 (200624)6.27.20REVISED DRAWINGS_rv4 2017-09 - A1.37 (200624),6.27.20revision fire departmentrevision plansRevisionsSite PlansSoil Subsurface InvestigationSP INSP Permit # 1908-0215ssSpecial Warranty DeedSUBS AGREEMENTS SLCOUNTYSURVEYThom-Katt CT 4660 USTransmittal Letter; Cristelle Cay Project