Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
30 day power release
56-SF-2204952 FINAL FINAL
APPROVED - EPL - Revised
APPROVED , Electrical plan sht 9
APPROVED Architectural plans sht 1
APPROVED Architectural plans sht 2
APPROVED Architectural plans sht 3
APPROVED Architectural plans sht 4
APPROVED- Energy - Revised
APPROVED Health dept drawings
APPROVED Health dept drawings (2)
APPROVED Health permit docs
APPROVED sht 5
APPROVED sht 6
APPROVED sht 7
APPROVED sht 8
Approved Truu Eng, 2
APPROVED, Digitally sealed truss cut sheets
APPROVED, HVAC plan sht 10
APPROVED, Manual J - Revised
APPROVED, Survey
APPROVED-Grading Plan
APPROVEDTruss layout
blower door
Building Permit Application
Cert of Capacity Exemption
Compaction - signed
Digitally sealed truss cut sheets
filled land affidavit
Final survey
final survey (2)
Health dept approved drawings
Health dept permit
Insulation cert
INSULATION CERT Pace 2000 - 4953 Bald Cypress Trail[1].pdf
Request for 30 day temp power release form
REVIEWED, Air barrier, checklist revised
REVIEWED, Air barrier, insulation Checklist - Revsed (1)
Scan 2022-2-14 08.31.59.pdf.pdf
site plan
Subcontractors
Termite Cert
Veg permit
Vegetation removal application
well permit