Loading...
HomeMy WebLinkAboutGM-05-026 - Indian River National Bank @ Business Park Drive · .~y t'. ç, mD mffl FlY) Fíl¿ EDWIN M. FRY, Jr., CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE # 272414510/07/2005 at 11 :39 AM OR BOOK 2385 PAGE 814 - 818 Doc Type: ORD RECORDING: $44.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 GM-05-026 File No.: MNSP-05-044 AN ORDER GRANTING MINOR SITE PLAN APPROVAL FOR THE PROJECT TO BE KNOWN AS INDIAN RIVER NATIONAL BANK @ BUSINESS PARK DRIVE WHEREAS, the S1. Lucie County Growth Management Director has reviewed the application for site plan approval submitted by Friscia Engineering, reviewed the comments of the S1. Lucie County Development Review Committee on this application, and made the following determinations: 1. Indian River National Bank. presented a petition for a Minor Site Plan approval to construct a 4,000 square foot bank building to be known as Indian River National Bank @ Business Park Drive in the CG (Commercial, General) Zoning District for the property described in Part B and generally located on northwest corner of U.S. Highway No. 1 and Business Park Drive, S1. Lucie County. 2. The site plan for the proposed project has been reviewed and found to meet the minimum technical requirements of the Land Development Code and to be consistent with the S1. Lucie County Comprehensive Plan. 3. The proposed project is consistent with the general purpose, goals, objectives, and standards of the S1. Lucie County Comprehensive Plan and the S1. Lucie County Land Development Code. 4. The proposed project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety, and general welfare. 5. All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping, and screening. 6. The proposed project will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. 7. The proposed project is to be served by adequate public facilities and services. 8. The applicant has applied for and received a Certificate of Capacity, a copy of which is attached to this order as Exhibit A, as required under Chapter V, S1. Lucie County Land Development Code. NOW, THEREFORE, BE IT ORDERED: A. Pursuant to Section 11.02.03 of the S1. Lucie County Land Development Code, the , , , 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 B. 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 site plan for the project to be known as Indian River National Bank @ Business Park Drive, is hereby approved as shown on the site plan drawings for the project prepared by Friscia Engineering on March 2, 2005 and last revised on September 28, 2005 and date stamped received by the St. Lucie County Growth Management Director on September 30, 2005, for the property described in Part B below is hereby approved subject to the following conditions: 1. A Condition of Approval shall be that the 114 inches of required mitigation shall be met by planting 78 inches on site (in addition to the minimum required landscaping) and the payment of $7,200 (36" X$200) to SLC ERD. Payment must be received prior to the issuance of a SLC Vegetation Removal Permit. 2. Within 30 days of minor Site plan approval, the applicant shall apply to FOOT for the installation of a traffic signal at US 1 & Business Park Drive. If FOOT determines that the signal is warranted at this location, the applicant shall design and install the traffic signal. If the installation is not complete prior to the request for a Certificate of Occupancy, the applicant shall provide surety acceptable to the County for all costs associated with the design and installation of the traffic signal. This improvement shall be creditable against roadway impact fees to the extent allowed by the County's Roadway impact Fee Ordinance. Should the applicant with to be reimbursed for any expenses in excess of Roadway Impact Fees, the applicant shall enter into a Roadway Impact Fee Credit Agreement. The Applicant shall be able to enter into this agreement while the project is under construction, but must indicate to the County within 45 days to the Building Permit Issuance the request for the Roadway Impact Fee Credit Agreement. The property on which this development will take place is described as follows: PARCEL 1 A PORTION OF LOTS 10 AND 11, BLOCK 2, SECTION 26, TOWNSHIP 36 SOUTH, RANGE 40 EAST, AS SHOWN ON MAP OF ST. LUCIE GARDENS SUBDIVISION RECORDED IN PLAT BOOK 1, PAGE 35, PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT BEING 1510 FEET SOUTHEASTERLY OF THE INTERSECTION OF THE WESTERLY LINE OF LOT 8, AND THE WESTERLY RIGHT-OF-WAY LINE OF U.S. HIGHWAY NO.1, THENCE ALONG SAID WESTERLY RIGHT-OF-WAY LINE A DISTANCE OF 259.94 FEET TO THE POINT AND PLACE OF BEGINNING OF THE FOLLOWING DESCRIBED PARCEL; THENCE DEPARTING SAID RIGHT-OF-WAY LINE N 89°42'05" W A DISTANCE OF 219.39 FEET; THENCE S 00°17'55" W A DISTANCE OF 203.00 FEET TO A POINT ON THE NORTH RIGHT-OF- WAY LINE OF BUSINESS PARK DRIVE AS SHOWN ON THE PLAT OF, ST. LUCIE BUSINESS PARK, AS RECORDED IN PLAT BOOK 28, PAGE 9A, PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA; THENCE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 C. 16 17 18 19 20 21 22 D. 23 24 25 26 27 28 29 30 31 32 E. 33 34 35 36 37 38 39 40 41 F. 42 43 44 45 46 G. 47 48 49 50 H. 51 52 ALONG SAID NORTHERLY RIGHT-OF-WAY S 89°42'05" E A DISTANCE OF 326.54 FEET TO THE INTERSECTION WITH THE WEST RIGHT-OF- WAY U.S. HIGHWAY NO. 1, THENCE N 27°31'37"W ALONG SAID WEST RIGHT-OF-WAY A DISTANCE OF 229.54 FEET TO THE POINT AND PLACE OF BEGINNING. CONTAINING 55,412 S.F., 1.272 ACRES PARCEL ID NUMBER: Part of ID NO. 3414-501-1811-000-3 Location: Northwest corner of U.S. Highway 1 and Business Park Drive, Fort Pierce Florida. This site plan shall expire on October 3, 2007, unless a building permit or a site plan approval extension is granted in accordance with Section 11.02.06, St. Lucie County Land Development Code. All requests for site plan extension shall be accompanied by a request for a new Certificate of Capacity for the property and project described in this Order. The site plan approval granted under this Order is specifically conditioned to the requirement that the petitioner, Indian River National Bank, including any successors in interest, shall obtain all necessary development permits and construction authorizations from the appropriate State and Federal regulatory authorities, including but not limited to; the Florida Department of Environmental Protection, and the South Florida Water Management District, prior to the issuance of any local building permits or authorizations to commence development activities on the property described in Part B. This Order shall become effective upon the date of approval indicated below. Should the property owner, developer or authorized agent wish to appeal any condition described in Section A above, all such appeals must be filed in writing with the County Administrator within 30 days of the rendering of this Order, as described in Section 11.02.03(B), St. Lucie County Land Development Code. Should an appeal to this Order be filed, no permitting reviews or further administrative action shall take place on the processing of this development project until the appeal is resolved. The Certificate of Capacity, attached as Exhibit A, shall be valid for the same period as this order. If this order expires or otherwise terminates, the Certificate of Capacity shall automatically terminate. A copy of this Order shall be mailed, return receipt requested, to the developer and agent of record as identified on the site plan applications. A copy of this Order shall be attached to the site plan drawings described in Section A, which plan shall be placed on file in the office of the St. Lucie County Growth Management Director. I. This Order shall be recorded in the Public Records of S1. Lucie County. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 ORDER effective the 3th day of October 2005. GROWTH MANAGEMENT DEPARTMENT, DIRECTOR ST. LUCIE COUNTY, FLORIDA ~ Faye Outlaw ---... ) .-/ dw APPROVED AS TO FORM AND CORRECTNESS: ù/#¡ County Attorney St Lucie County Certificate of Capacity Date 10/2/2005 Certificate No. 2210 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan for: 1. Type of development Minor Site Plan Number of units 0 Number of square feet 4000 2. Property legal description & Tax ID no. 3414-501-1811-0003 NW comer of US 1 and Business Park Drive Indian River National Bank @ Business Park D 3. Approval: Building Resolution No. GM-05-26 Letter 4. Subject to the following conditions for concurrency: Owner's name Indian River National Bank Address 958 20th Place Vero Beach FL 32960 6. Certificate Expiration Date 10/3/2007 This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying development orderissued with this certificate, or for subsequent development order(s) issued for the same property, use and size as described herein. Sig~1 ----=--- --- ___:J --~ ...____r ~ ~ate: 10/2/2005 Growth Management Director St Lucie County, Florida Sunday, October 02, 2005 Page 1 of2