Loading...
HomeMy WebLinkAbout06-006 ~)lö; bf\¡\ , ' S/?D Oµ~ Flt-J Flit EDWIN M. FRY, Jr., CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE # 278796301127/2006 at 03:28 PM T . RESO OR BOOK 2472 PAGE 2842 - 2848 Doc ype. RECORDING: $61.00 1 2 3 RESOLUTION NO. 06-006 FILE NO.: MJSP-05-003 4 A RESOLUTION GRANTING APPROVAL TO A MAJOR SITE PLAN PROJECT TO BE KNOWN AS INDRIO CROSSINGS - PHASE II 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the testimony and evidence, including but not limited to the staff report, has made the following determinations: 1. Jeffrev Freeman, presented a application for a Major Site Plan Project, to be known as Indrio Crossings - Phase II, to provide for the construction of 84 multiple family units and 45,924 square feet of retail and office space, on 14.23 acres located at the southeast corner of Turnpike Feeder Road and Miramar Avenue, for the property described in Section B. 2. The Development Review Committee has reviewed the site plan for the proposed project and found it to meet all technical requirements and to be consistent with the future land use maps of the St. Lucie County Comprehensive Plan, subject to the conditions set forth in Part A of this Resolution. 3. The proposed project is consistent with the general purpose, goals, objectives and standards of the St. Lucie County Land Development Code, the St. Lucie County Comprehensive Plan and the Code of Ordinances of St. Lucie County. 4. The proposed project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety and general welfare. 5. All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping and screening. 6. The proposed project will be constructed, arranged and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. 7. The proposed project will be served water and sewer services by the St. Lucie County Utilities. 8. The applicant has applied for and received a certificate of capacity exemption, a File No.: MJSP-05-003 January 17, 2006 Resolution No. 06-006 Page 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 copy of which is attached to this order as Exhibit A, as required under Chapter V, St. Lucie County Land Development Code. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida: A. Pursuant to Section 11.02.05 of the St. Lucie County Land Development Code, the Major Site Plan to be known as Indrio Crossings - Phase II, is hereby approved as depicted on the site plan drawings for the project prepared by Thomas Lucido & Associates, PA., dated 3/16/05, last revised on 1/9/06, and date stamped received by the St. Lucie County Growth Management Director on 1/10/06, for the property described in Section B, subject to the following conditions: 1. No construction authorization shall be issued until the effectiveness date set forth in Resolution No. 06-005 and Ordinance No. 06-007 that amend the Future Land Use Designation to RM and the Zoning District to RM-9. 2. Prior to the issuance of building permits within Phase I or Phase II, or permits for the construction of infrastructure within Phase II, a revised site plan modifying the commercial portion of this project (Phase II) shall be submitted to the Growth Management Department for review and approval. The modifications for Phase II shall include a 10 foot dedication for right-of-way needs along this project's Turnpike Feeder Road frontage and a 6 foot sidewalk and easement, dedicated to the County, inside the project property line along Turnpike Feeder Road. The applicant shall also demonstrate compliance with the Community Architectural standards at that time. The required modification shall be approved administratively and no application fee shall be charged for the required site plan revision. 3. Prior to the issuance of building permits within the Commercial portion of this project, plans indicating structures meeting the requirements of Section 7.10.24. Community Architectural Standards must be received and approved by the Growth Management Department. 4. Prior to the issuance of any building permits for the residential units, the developer shall enter into an agreement for Contributions toward public school land acquisition and facility construction for amelioration of the increased residential density or provide property owner association documents that include binding age restrictions for the residential community that have been reviewed and approved by the Growth Management Department and the St. Lucie County School Board staff. 5. No Certificate of Occupancy shall be issued until the Developer has constructed Deleon Avenue in accordance with the approved construction plans. Construction plan approval shall require: File No.: MJSP-05-003 January 17, 2006 Resolution No. 06-006 Page 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 B. 42 43 44 45 46 47 · A geotechnical report describing the recommendations for construction of Deleon Avenue as well as the seasonal high groundwater table, existing soil conditions, and existing & proposed elevations. · Drainage calculations and plans for the Deleon Avenue construction as well as the on-site drainage analysis. Additional stormwater storage and the outfall point for the construction of Deleon Avenue shall be accommodated on the project site. · A drainage easement shall be dedicated to St. Lucie County for access. 6. No Certificate of Occupancy shall be issued until the County Engineer conditionally accepts the constructed roadway and the Developer posts any required construction and maintenance bonds. Prior to conditional acceptance by St. Lucie County, all testing and inspection reports verifying that construction was completed in accordance with St. Lucie County and FDOT standards, must be submitted to the Engineering Department (Attention County Engineer). As-built drawings shall also be submitted and must be signed and sealed by a Registered Professional Engineer and a Registered Professional Surveyor currently licensed in the State of Florida. 7. No building permit shall be issued until the developer has conveyed the six (6') foot pedestrian easement along Deleon Avenue to St. Lucie County. Easements shall be located contiguous to Deleon Avenue and in a form of conveyance acceptable to the County Attorney. 8. The irrigation system within this project shall be designed to accept reuse water as the preferred method of irrigation. 9. The proposed community clubhouse shall be built with: · hurricane resistant glass; and · hurricane resistant doors; and · an emergency generator. 10. Prior to issuance of a construction permit for this project the developer, successors or assigns, shall pay road impact fees for the entire project. Said impact fees shall be based on the following fees: · Multiple-family 1 & 2 Story($1 ,902 per unit) · Office space & Financial ($1 ,596 per 1000 FT2) · Retail ($3,389 per 1000 FT2) · Medical ($7,142 per 1000 FT2) The property on which this Major Site Plan approval is being granted is described as follows: That part of the Southwest V. of the Northwest V. of Section 13, Township 34 South, Range 39 East, St. Lucie County, Florida, lying East of Sunshine State Parkway Feeder Road (S.R. 713) and North of Indrio Road, LESS and excepting there from the East 818 feet of the South 228.71 feet. File No.: MJSP-05-003 January 17, 2006 Resolution No. 06-006 Page 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 C. 28 29 30 31 D. 32 33 34 35 36 37 38 39 40 E. 41 42 43 44 45 46 F. 47 48 Less and except road rights-of-way as described in those certain deeds recorded in O.R. Book 585, Page 1449 through 1451, and O.R. Book 649, Page 027 and 028, ofthe Public Records of St. Lucie County. LESS AND EXCEPT: That part of the Southwest Y4 of the Northwest Y4 of Section 13, Township 34 South, Range 39 East, St. Lucie County, Florida, lying East of SUNSHINE STATE PARKWAY FEEDER ROAD (S.R. 713) and lying South of the following described line: COMMENCING at a point (P.O.C.) being the Southeast corner of the Southwest Y4 of the Northwest Y4 of said Section 13, run thence North 00 degrees 02'3" West along the East line of the Southwest Y4 of the Northwest Y4 of said Section 13,708.55 feet to the POINT OF BEGINNING (P.O.B.); thence run South 89 degrees 59'58" West, parallel with the Y4 section line, 760.46 feet; thence run South 44 degrees 59'58" West, 51.71 feet; thence run North 45 degrees 00'02" West, 202.22 feet to the East right-of-way line of SUNSHINE STATE PARKWAY FEEDER ROAD (S.R. 713) and the end of this described line. LESS AND EXCEPTING The East 20 feet for road right-of-way (now Deleon Avenue, formerly Royal Palm Avenue). PARCEL CONTAINS 619,978 SQUARE FEET, 14.23 ACRE +/- This Major Site Plan shall expire on January 17, 2008, unless a building permit is issued or an extension is granted in accordance with Section 11.02.06(B) (3), St. Lucie County Development Code. The Major Site Plan approval granted under this Resolution is specifically conditioned to the requirement that the petitioner, Jeffrey Freedman, including any successors in interest, shall obtain all necessary development permits and construction authorizations from the appropriate State and Federal regulatory authorities, including but not limited to: the United States Army Corps of Engineers, the Florida Department of Environmental Protection, and the South Florida Water Management District, prior to the issuance of any local building permits of authorizations to commence development activities on the property described in Part B. A Certificate of Capacity Exception, a copy of which is attached to this resolution, was granted by the Growth Management Director on January 10, 2006, which certificate shall remain valid for the period of Site Plan approval. Should the Site Plan approval granted by this resolution expire or an extension be sought pursuant to Section 11.07.05(F) of the St. Lucie County Land Development Code, a new certificate of capacity shall be required. A copy of this resolution shall be attached to the site plan drawings described in Section A, which plan shall be placed on file with the St. Lucie County Growth Management Director. File No.: MJSP-05-003 January 17, 2006 Resolution No. 06-006 Page 4 After motion and second, the vote on this resolution was as follows: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3 31 32 33 34 35 36 37 38 39 40 Chairman Doug Coward AYE Vice-Chairman Chris Craft NAY Commissioner Frannie Hutchinson AYE Commissioner Paula A. Lewis AYE Commissioner Joe E. Smith NAY BY: PASSED AND DULY ADOPTED this 17th Day of January 2006. ATTEST: dw H :/doc/drc/projects/approved/ind riocrossings 41 42 43 File No.: MJSP-05-003 January 17, 2006 BOARD OF COUNTY COMMIS ST. LUCIE COUNTY, FLOR::~ i (... APPROVED AS TO FORM AND CORRECTNESS: '\ /f I 'Î..II "" . ../....... ,//(/ic . ¡, ¡/ /' ,/j~. " iCé¡>,(j / . COUNTY ATTO Resolution No. 06-006 Page 5 · . 1 Exhibit A 2 3 4 5 Certificate of Capacity Exemption 6 File No.: MJSP-05-003 January 17, 2006 Resolution No. 06-006 Page 6 · . 4 , . St Lucie County Certificate of Capacity Exemption Date 1/10/2006 Certificate No. 4389 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan for: 1. Type of development Major Site Plan, Futrure Land Use Change and Change in Zoning Number of units 84 Number of square feet 45924 2. Property legal description & Tax ID no. 1313-231-0000-0004 SE corner of Miramar Ave and Turnpike Feeder Indrio Crossings - Phase II 3. Approval: Building Resolution No. Res 06-006, Letter 4. As part of the development: 5. On property owned by Jeffrey Freedman 2701 Rave II a Way Palm Beach FL 33410 is hereby granted a Certificate of Capacity Exemption according to Chapter 5.02.02 AD Bo C~ DO EO FOG 0 H 0 10 J 0 of the St Lucie County land Development Code. 6. Certificate Expiration Date 1/17/2008 This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying development orderissued with this certificate, or for subsequent development order(s) issued for the same property, use and size as described herein. Signed (!¡u. ~£ D Date, 1/18/201H; Growth Management Director St Lucie County, Florida