Loading...
HomeMy WebLinkAboutGM-06-007 - Kings Highway Industrial Park Lots 17 & 18 · ,.. riop~ To', G "" " 3\D'O(o~ EDWIN M. FRY, Jr., CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE # 280956403/07/2006 at 01 :14 PM OR BOOK 2502 PAGE 1902 - 1905 Doc Type: ORD RECORDING: $35.50 /( 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 GM-06-007 File No.: MNSP-05-014 AN ORDER GRANTING MINOR SITE PLAN APPROVAL FOR THE PROJECT TO BE KNOWN AS KINGS HIGHWAY INDUSTRIAL PARK LOTS 17 & 18 WHEREAS, the St. Lucie County Growth Management Director has reviewed the application for site plan approval submitted by Richard Cullifer, reviewed the comments of the St. Lucie County Development Review Committee on this application, and made the following determinations: 1. A 21,744 square foot general industrial building proposed for a project to be known as Kings Highway Industrial Park Lots 17 & 18, in the IL (Industrial, Light) Zoning District for the property described in Part A and generally located northwest of the Kings Highway and Angle Road intersection. 2. The Development Review Committee has reviewed the site plan for the proposed project and found it to meet technical requirements of the Land Development Code and to be consistent with the St. Lucie County Comprehensive Plan. 3. The proposed project is consistent with the general purpose, goals, objectives, and standards of the St. Lucie County Comprehensive Plan and the St. Lucie County Land Development Code. 4. The proposed project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety, and general welfare. 5. All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping, and screening. 6. The proposed project will be constructed, arranged, and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. 7. The proposed project is to be served by the Fort Pierce Utility Authority water and sewer system. 8. The applicant has applied for and received a certificate of capacity, a copy of which is attached to this order as Exhibit A, as required under Chapter V, St. Lucie County Land Development Code. February 9, 2006 Page 1 GM Order 06-007 .. . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 NOW, THEREFORE, BE IT ORDERED: A. Pursuant to Section 11.02.03(A)(5) of the St. Lucie County Land Development Code, the Site Plan for the project to be known as Kings Highway Industrial Park Lots 17 & 18 be, and the same is hereby, approved as shown on the site plan drawings forthe project prepared by Gentile Holloway O'Mahoney & Associates, Inc., on May 6, 2005 and last revised on December 15, 2005 and received by the St. Lucie County Growth Management Director on February 8, 2006, for the property described in Part B below is hereby approved. B. The property on which this development will take place is described as follows: Lots 17 and 18, Block A of Kings Highway Industrial Park Unit Two, according to the Plat thereof as recorded in Plat Book 32, Pagers) 5 and 5A of the Public Records of St. Lucie County (2.27 acres). (Tax 10#: 1335-802-0002-0008) (Location: Kings Highway Industrial Park, the northwest intersection of Kings Highway and Angle Road.) B. This site plan shall expire on February 9,2008, unless a building permit or a site plan approval extension is granted in accordance with Section 11.02.06, St. Lucie County Land Development Code. All requests for site plan extension shall be accompanied by a request for a new certificate of capacity for the property and project described in this Order. The Site Plan approval granted under this resolution is specifically conditioned to the requirement that the petitioner, Richard Cullifer, including any successors in interest, shall obtain all necessary development permits and construction authorizations from the appropriate State and Federal regulatory authorities including, but not limited to; the United States Army Corps of Engineers, the Florida Department of Environmental Protection, and the South Florida Water Management District, prior to the issuance of any local building permits of authorizations to commence development activities on the property described in Part A. This Order shall become effective upon the date of approval indicated below. Should the property owner, developer or authorized agent wish to appeal any condition described in Section A above, all such appeals must be filed in writing with the County Administrator within 30 days of the rendering of this Order, as described in Section 11.02.03(B), St. Lucie County Land Development Code. Should an appeal to this Order be filed, no permitting reviews or further administrative action shall take place on the processing of this development project until the appeal is resolved. E. A copy of this Order shall be attached to the site plan drawings described in Part A, which plan shall be placed on file with the St. Lucie County Growth Management Director and mailed, return receipt requested to the developer and agent of record as identified on the site plan applications. February 9,2006 Page 2 GM Order 06-007 · , 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 F. The certificate of capacity, attached as Exhibit A, shall be valid for the same period as this order. If this order expires or otherwise terminates, the certificate of capacity shall automatically terminate. APPROVED AS TO FORM AN]ÃCTNESS County Attorney This order shall be recorded in the Public Records of S1. Lucie County. ORDER effective the 9th Day of February 2006. GROWTH MANAGEMENT DIRECTOR ST. LUCIE COUNTY, FLORIDA BY 1~~ Robert Nix dw H:\DRC\projects\KHIP _17 February 9, 2006 Page 3 GM Order 06-007 , . St Lucie County Certificate of Capacity Date 2/8/2006 Certificate No. 2345 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan for: 1. Type of development Minor Site Plan Number of units 0 Number of square feet 21744 2. Property legal description & Tax ID no. 1335-802-0002-0008 Kings Highway Industrial Park Kings Highway Industrial Park Lots 17 & 18 Kings Highway Industrial Park 3. Approval: Building Resolution No. GM-06-007 Letter 2/9/06 4. Subject to the following conditions for concurrency: Owner's name Richard Cullifer Address 400 US Highway One, Suite 4 Jupiter FL 33477 6. Certificate Expiration Date 2/9/2006 This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying development orderissued with this certificate, or for subsequent development order(s) issued for the same property, use and size as described herein. Signed ¡ r? )/:f Date: 2/8/2006 Growth Management Director St Lucie County, Florida Wednesday, February 08, 2006 Page 1 of2