HomeMy WebLinkAboutGM-06-022 - Vincent Disisto Trust
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
EDWIN M. FRY, Jr., CLERK OF THE CIRCUIT COURT
SAINT LUCIE COUNTY
FILE # 29029530712612006 at 03:46 PM
ORBOOK2621 PAGE 2309-2313 Doc Type" ORD
RECORDING: $44.00 .
GM-06-022
File No.: MNSP-06-001
AN ORDER GRANTING MINOR SITE PLAN
APPROVAL FOR THE PROJECT TO
BE KNOWN AS VINCENT DISISTO TRUST
WHEREAS, the St. Lucie County Growth Management Director has reviewed the
application for site plan approval submitted by Richard Ahrens, reviewed the comments of
the St. Lucie County Development Review Committee on this application, and made the
following determinations:
1. A 15,440 square foot light industrial building has been proposed for the project to
be known as Vincent Disisto Trust, in the IL (Industrial, Light) Zoning District for
the property described in Part A and generally located in the Kings Highway
Industrial Park, on Commercial Circle, St. Lucie County, Florida.
2. The Development Review Committee has reviewed the site plan for the proposed
project and found it to meet technical requirements of the Land Development Code
and to be consistent with the St. Lucie County Comprehensive Plan.
3. The proposed project is consistent with the general purpose, goals, objectives, and
standards of the St. Lucie County Comprehensive Plan and the St. Lucie County
Land Development Code.
4. The proposed project will not have an undue adverse effect on adjacent property,
the character of the neighborhood, traffic conditions, parking, utility facilities, or
other matters affecting the public health, safety, and general welfare.
5. All reasonable steps have been taken to minimize any adverse effect of the
proposed project on the immediate vicinity through building design, site design,
landscaping, and screening.
6. The proposed project will be constructed, arranged, and operated so as not to
interfere with the development and use of neighboring property, in accordance with
applicable district regulations.
7. The proposed project is to be served by Fort Pierce Utilities Authority.
8. The applicant has applied for and received a certificate of capacity, a copy of
which is attached to this order as Exhibit A, as required under Chapter V, St. Lucie
County Land Development Code.
File No.: MNSP-06-001 GM Order 06-022
July 18, 2006 Page 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
..
NOW, THEREFORE, BE IT ORDERED:
A. Pursuant to Section 11.02.03(A)(5) of the St. Lucie County Land Development
Code, the Final Site Plan for the project to be known as Vincent Disisto Trust,
and the same is hereby, approved as shown on the site plan drawings for the
project prepared by Richard Ahrens of Ahrens Companies, on January 5, 2006,
and last revised on April 5, 2006, and received by the St. Lucie County Growth
Management Director on June 15, 2006, is being granted for the property
described below, subject to the fOllowing conditions:
1. No clearing or other site work shall commence until after constructible
engineering plans have been approved by the County Engineer and all
county environmental permits have been issued by Environmental
Resources Department pursuant to Section 11.02.08(A)(7) of the St. Lucie
County Land Development Code. As of this date of issuance of this
Development Order, no constructible site development plans have been
submitted for review. No work shall commence after the issuance of
environmental permits by county, or of any other permits by any other
agency, until the County Engineer has approved the constructible site plans.
2. Pursuant to Section 11.02.08(A)(6) of the St. Lucie County Land
Development Code, no work shall commence on the site until all regulatory
permits required from Federal, State, and regional agencies and special
districts have been issued. The Florida Department of Environmental
ProtectiDn, National POllutant Discharge and Elimination System compliance
notice must be submitted to the County Engineer with the constructible site
plan at the time of building permit application or during permit review or no
paving, grading, and drainage permit and no building permit shall be issued.
All National Pollutant Discharge and Elimination System Best Management
Practices shall be instituted on the site prior to site clearing and maintained
daily. Stormwater ponds shall be roughed in at the same time the site is
cleared of groundcover.
3. This Development Order shall be recorded in the Public Records of SI. Lucie
County, Florida, in order to provide constructive legal notice of development
conditions that run with the land.
4. The Code Compliance Manager shall receive a copy of this Development
Order and the site plan it approves and shall not approve any building
permits that do not implement or are not consistent with this Development
Order and the plans hereby approved.
File No.: MNSP-06-001
July 18, 2006
GM Order 06-022
Page 2
1
2
3
4
5
6 B.
7
8
9
10
11
12
13
14 C.
15
16
17
18 D.
19
20
21
22
23
24
25
26
27
28 E.
29
30
31
32
33
34
35
36
37 F.
38
39
40
41
42 G.
43
44
5. The developer, his successors or assigns shall either construct or, in
accordance with Section 11.04.00 of the St. Lucie County Land
Development Code, provide sufficient security for the construction of a 5-
foot wide sidewalk along the project's frontage on Commercial Circle.
The property on which the minor site plan is being approved is described as
follows:
KINGS HIGHWAY INDUSTRIAL PARK-UNIT TWO- BLK BLOT 22 (1,38 AC) ST. LUCIE
COUNTY, FLORIDA, (Tax ID No.: 1335-802-0044-0004)
(Location: Kings Highway Industrial Park on Commercial Circle)
This site plan shall expire on July 18, 2008, unless a building permit is issued or a
site plan approval extension is granted in accordance with Section 11.02.06, St.
Lucie County Land Development Code.
The Final Site Plan approval granted under this resolution is specifically
conditioned to the requirement that the petitioner, Vincent Disisto Trust, including
any successors in interest, shall obtain all necessary development permits and
construction authorizations from the appropriate State and Federal regulatory
authorities including, but not limited to; the United States Army Corps of
Engineers, the Florida Department of Environmental Protection, and the South
Florida Water Management District, prior to the issuance of any local building
permits of authorizations to commence development activities on the property
described in Part A.
This Order shall become effective upon the date of approval indicated below.
Should the property owner, developer or authorized agent wish to appeal any
condition described in Section A above, all such appeals must be filed in writing
with the County Administrator within 30 days of the rendering of this Order, as
described in Section 11.02.03(B), St. Lucie County Land Development Code.
Should an appeal to this Order be filed, no permitting reviews or further
administrative action shall take place on the processing of this development
project until the appeal is resolved.
A copy of this Order shall be attached to the site plan drawings described in Part
A, which plan shall be placed on file with the St. Lucie County Growth
Management Director and mailed, return receipt requested to the developer and
agent of record as identified on the site plan applications.
This order shall be recorded in the Public Records of St. Lucie County. The
certificate of exemption, attached as Exhibit A, shall be valid for the same period
as this order. If this order expires or otherwise terminates, the certificate of
File No.: MNSP-06-001
July 18. 2006
GM Order 06-022
Page 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
capacity shall automatically terminate.
ORDER effective the 18th Day of July 2006.
We
H:\ GMORDER Vincent Disisto Trust MNSP.doc
File No.: MNSP-06-001
July 18, 2006
GROWTH MANAGEMENT DIRECTOR
ST. LUCIE COUNTY, FLORIDA
BY
ß~ #..:r
Bob Nix, AICP
APPROVED AS TO FORM
AN 7j3¡ESS
County Attorney
GM Order 06-022
Page 4
St Lucie COlin"
Ccrtificatl' ofCapal'ity Exemption
Date 7118/2006
Certificate No. 4584
This documenf certifies that concurrency will be mef and that adequate public facility
capacity exists to maintain the standards for levels of service as adopted in the 5t
Lucie Countv Comprehensive Plan for:
1. Type of development Minor Site Plan
Number of units
Number of square feet 15,440
2. Property legal description & Tax ID no.
1335-802-0044-000/4
Commercial Circle, Kings Highway Ind. Pk.
Vincent DiSisto Trust
3. Approval: Buildinq
Kings Highway
Resolution No. GM-06-022
Letter
4. As part of the development:
5. On property owned by
Vincent DiSisto Trust
6763 Calumet Circle
Lake Worth
FL 33467
is he-reby granted a Cf:rtìficatc of Capacîty Exemption accordínq to Chapter 5.02.0 All B!i ell 0 i
ELI F'~ G í I H IJ 1--= J Li of the St L.ucie County Land Deve¡opment Code,
6. Certificate Expiration Date 7/18/2008
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel, and is suhject to the same terms, conditions and expiration date listed herein.
The expiration date can be extended only under the same terms and conditions as the
underlying development orderissued with this certificate. or for subsequent
developrnent order(s} issued for the same property, use and size as described herein.
Signed
8 dt ¡¡If'
Growth Management Director
St Lucie County, Florida