Loading...
HomeMy WebLinkAboutCD-03-024 - Harbor Federal Savings Bank - Prima Vista Crossings ~ e t 1 CD-03-024 2 SPMn-02-027 3 4 AN ORDER GRANTING APPROVAL FOR A s MINOR SITE PLAN KNOWN AS HARBOR 6 FEDERAL SAVINGS BANK -PRIMA VISTA ~ CROSSINGS e 9 WHEREAS, the St. Lucie County Community Development Director has reviewed the application for to site plan approval submitted by LBFH, Inc., reviewed the comments of the St. Lucie County ii Development Review Committee on this application, and made the following determinations: 12 13 1. Harbor Federal Savings Bank -Prima Vista Crossings, is a proposed 5,340 square foot 14 banking facility for Lot 3 of the Prima Vista Crossings S/D in the CG (Commercial, General)) i5 Zoning District. 16 i~ 2. The Development Review Committee has reviewed the site plan for the proposed project is and found it to meet technical requirements of the Land Development Code and to be i9 consistent with the St. Lucie County Comprehensive Plan. 20 21 3. The project is consistent with the general purpose, goals, objectives, and standards of the 22 St. Lucie County Comprehensive Plan and the St. Lucie County Land Development Code. 23 24 4. The project will not have an undue adverse effect on adjacent property, the character of the 25 neighborhood, traffic conditions, parking, utilityfacilities, orother matters affecting the public 2 6 health, safety, and general welfare. 27 2 s 5. All reasonable steps have been taken to minimize any adverse effect of the proposed project 2 9 on the immediate vicinity through building design, site design, landscaping, and screening. 30 3 i 6. The project will be constructed, arranged, and operated so as not to interfere with the 32 development and use of neighboring property, in accordance with applicable district 33 regulations. 34 35 7. The project is to be served by adequate public facilities and services. 36 3 ~ 8. The applicant has applied for and received an updated certificate of capacity, a copy of 3 s which is attached to this order as Exhibit A, as required under Chapter V, St. Lucie County 3 9 Land Development Code. 40 41 NOW, THEREFORE, BE IT ORDERED: 42 43 A. Pursuant to Section 11.02.03 (D) of the St. Lucie County Land Development Code, the 44 proposed minor site plan known as Harbor Federal Savings Bank -Prima Vista 45 Crossings, is hereby approved as shown on the site plan drawings for the project prepared File No.: SPMn-03-027 JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT CD Order 03-025 Se tember 9, 2003 SAINT LUCIE COUNTY p FILE # 3421947 12116!2009 at 10:08 AM Page 1 OR BOOK 3154 PAGE 943 - 946 Doc Type: ORD RECORDING: $35.50 ~a 1 by LBFH, Inc., dated August 5, 2003, and received by the St. Lucie County Community 2 Development Director on August 27, 2003, on the property described below, subject to the 3 following condition: 4 5 Prior to the issuance of any Certificates of Occupancy, Harbor Federal Savings Bank or its 6 successors and assigns, shall receive approval for the 3rd re-plat of the Prima Vista ~ Crossings S/D to remove the existing ground sign from the subject property. a 9 10 11 B. The property on which this minor site plan is being approved is as follows: 12 13 Prima Vista Crossings S/D, 3rd Re-Plat, Lot 3 (Tax ID#: 3422-855-0007-000/4) 14 15 (Location: Lot 3, Prima Vista Crossings S/D, 3rd Re-Plat.) 16 17 18 19 C. The approval periods described in Administrative Order CD-03-024 shall remain in full force 2 o and effect. The approvals granted by this administrative order shall expire on September 9, 21 2005, unless an extension is granted in accordance with the provisions of Section 11.02.06 22 of the St. Lucie County Land Development Code. 23 24 25 26 D. The Final Site Plan approval granted under this resolution is specifically conditioned to the 2 ~ requirement that the petitioner, Harbor Federal Savings Bank, including any successors in 2 8 interest, shall obtain all necessary development permits and construction authorizations from 29 the appropriate State and Federal regulatory authorities including, but not limited to; the 3 o United States Army Corps of Engineers, the Florida Department of Environmental 31 Protection, and the South Florida Water Management District, prior to the issuance of any 3 z local building permits of authorizations to commence development activities on the property 33 described in Part B. 34 35 36 37 E. A copy of this Order shall be attached to the siteplan drawings described in Part A, which 3 s plan shall be placed on file with the St. Lucie County Community Development Director and 39 mailed, return receipt requested to the developer and agent of record as identified on the 4o site plan applications. 41 42 43 44 F. The certificate of capacity, attached as Exhibit A, shall be valid for the same period as this 45 order. If this order expires or otherwise terminates, the certificate of capacity shall 46 automatically terminate. File No.: SPMn-03-027 CD Order 03-025 September 9, 2003 Page 2 E 1 2 3 G. This order shall be recorded in the Public Records of St. Lucie County. 4 5 6 ORDER effective the 9th day of September 2003. 7 s 9 10 11 12 13 GROWTH MANAGEMENT DIRECTOR 14 ST. LUCIE COUNTY, FLORIDA 15 16 1 a BY ~ 19 M ark Satterlee, AICP 20 21 22 APPROVED AS TO FORM 23 AND COR CTNESS: 24 25 26 27 zs County Att n y 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Hf:jm 46 H:\WORD\RESOLUTIOMFINISHED.2003\harborFed-PVC.SP\HarborFed-PVC-CDO.doc 47 File No.: SPMn-03-027 CD Order 03-025 September 9, 2003 Page 3 m,~, a 1 St Lucie County Certificate of Capacity Date 10/20/2003 Certificate No. 1336 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan far: 1. Type of development Harbor Federal -Minor Site Plan Number of units 1 Number of square feet 5,340 2. Property legal description Tax ID no. 3422-855-0007-000/4 Prima Vista Crossings S/D, Lot 3 Harbor Federal Savings/Prima Vista Crossings 3. Approval: Building Resolution No. CD-03-025 Letter 4. Subject to the following conditions for concurrency: Owner's name Harbor Federal Savings Bank Address 725 South US Hwy No. 1 Fort Pierce FL 34950 6. Certificate Expiration Date 9/9/2005 This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying development orderissued with this certificate, or for subsequent development order(s) issued for the same property, use and size as described herein. Signed ~ ~ K'~~ ~ Date: 7/2/2009 Growth Management Director St Lucie Gounty, Florida Thursday, July 02, 2009 Page 1 of 2