Loading...
HomeMy WebLinkAboutGM-10-001 - McDonald's @ Indrio Crossing JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE # 3435096 01128!2010 at 08:51 AM OR BOOK 3165 PAGE 2577 - 25'82 Doc Type: ORD RECORDING: $52.50 1 GM 10-001 2 MNSP 920094007 3 4 AN ORDER OF THE GROWTH MANAGEMENT DIRECTOR GRANTING 5 APPROVAL FOR A MINOR SITE PLAN KNOWN AS MCDONALD'S @ 6 INDRIO CROSSING CONSISTING OF A 3,466 SQUARE FOOT FAST ~ FOOD (DRIVE THRU) RESTAURANT ON 1.32 ACRES IN THE CG, $ COMMERCIAL GENERAL ZONING DISTRICT ON CERTAIN 9 PROPERTY SITUATED IN ST. LUCIE COUNTY, FLORIDA. to 11 WHEREAS, the St. Lucie County Growth Management Director has reviewed the application for 12 minor site plan approval submitted by Indrio Retail, LLC and reviewed the comments of the St. 13 Lucie County Development Review Committee on this application, and made the following 14 determinations: 15 16 1. Indrio Retail, LLC has proposed a 3,466 square foot fast food (drive thru) restaurant 17 building on 1.32 acres located on the northeast corner of King's Highway and Indrio la Road. 19 20 2. On January 14, 2010 the Development Review Committee reviewed the minor site plan 21 for the proposed project and found it to meet technical requirements of the St. Lucie 22 County Land Development Code and to be consistent with the St. Lucie County 23 Comprehensive Plan. 24 25 3. On January 14, 2010 the Environmental Resources Director reviewed and granted the 26 applicant's request for administrative relief as per Section 7.09.04(0) of the Land 2 ~ Development Code. This relief allows the landscape buffer width requirement of fifteen 2a (15) feet between the right-of-way and vehicular use area adjacent to Indrio Road to be 2 a reduced a maximum of two (2) feet to thirteen (13) feet. 30 31 4. The project is consistent with the general purpose, goals, objectives, and standards of 32 the St. Lucie County Comprehensive Plan and the St. Lucie County Land Development 33 Code. 34 35 5. The project will not have an undue adverse effect on adjacent property, the character of 3 6 the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the 3 ~ public health, safety, and general welfare. 38 39 6. All reasonable steps have been taken to minimize any adverse effect of the proposed 4o project on the immediate vicinity through building design, site design, landscaping, and 41 screening. 42 43 7. The project will be constructed, arranged, and operated so as not to interfere with the 44 development and use of neighboring property, in accordance with applicable district 45 regulations. 46 JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT GM 10-001 File No.: MNSP 920094007 SAINT LUCIE COUNTY January 18, 201 ~ FILE # 3441121 02/11/2010 at 02:11 PM Page 1 OR BOOK 3170 PAGE 2407 - 2412 Doc Type: ORD RECORDING: $52.50 1 8. The project is to be served by adequate public facilities and services. 2 3 9. The applicant has applied for and received a certificate of capacity, a copy of which is 4 attached to this Order as Exhibit A, as required under Chapter V, St. Lucie County Land s Development Code. 6 7 NOW, THEREFORE, BE IT ORDERED: s 9 A. Pursuant to Section 11.02.03 (A) of the St. Lucie County Land Development Code, io the Minor Site Plan for the project to be known as McDonald's @ Indrio Crossing, ii is hereby approved as shown on the site plan (dated December 8, 2009 -prepared 12 by CPH Engineers, Inc.), the landscape plan (dated January 7, 2010 -prepared by 13 CPH Engineers, Inc.) and the exterior elevations (dated December 9, 2009 - 14 prepared by Hartley + Purdy Architecture, Inc .)for the project date stamped received is by the St. Lucie County Growth Management Department on January 13, 2010 is i6 being granted for the property described below, subject to the following conditions: 17 is 1. Prior to issuance of a Vegetation Removal Permit or Exemption, an original i9 signed and sealed copy of the landscape plan dated 01/07/10 shall be provided 20 and approved by Environmental Resources Department. 21 22 2. Prior to issuance of a Vegetation Removal Permit or Exemption, the applicant 23 shall finalize an improvement agreement acceptable to Environmental 24 Resources Department covering the cost of all required landscaping, irrigation, 2 s and related improvements shown in the site plan. A copy of this agreement can 26 be obtained by visiting the SLC Environmental Resources Department website 27 at: http://www.stlucieco.org/Environmental Resources Department/index.htm. 2s 29 3. Prior to issuance of a Vegetation Removal Permit or Exemption, the applicant 3o shall have obtained and provided Environmental Resources Department with 31 copies of any required federal and state permits. If federal or state agency 32 compliance requires modification to the development plans, the applicant will 3 3 promptly modify the plans and submit to St. Lucie County for review and approval 34 as required by the Land Development Code. The applicant will not use the 35 County's development approval to prevent compliance with any federal or state 36 agency requirements. 37 3 s 4. Within ninety (90) days of issuance of a Vegetation Removal or Exemption 39 Permit, all Category I and II Invasive Exotic vegetation, as defined by the most 4o recent list by Florida Exotic and Pest Plan Council, shall be removed from the 4 i site. 42 43 5. No clearing or other site work shall commence until after constructible 44 engineering plans have been approved by the County Engineer and all county 45 environmental permits have been issued by the Environmental Resources 46 Department pursuant to Section 11.02.08(A)(7) of the St. Lucie Land 47 Development Code. As of this date of issuance of this Development Order, no 48 constructible site development plans have been submitted for review. No work File No.: MNSP 920094007 GM 10-001 January 18, 2010 Page 2 1 shall commence after the issuance of environmental permits by the County, or 2 any other permits by any other agency, until the County Engineer has approved 3 the constructible site plans. 4 5 6. Within one hundred eighty (180) days after the petitioner, their successors or 6 assigns receives its certificate of occupancy, the owner of the subject parcel ~ shall convey to the FDOT and or St. Lucie County the required road right of way s for Kings Highway and Indrio Road. Manner and form of conveyance and 9 compensation (to be determined) shall be acceptable to the owner, Florida to Department of Transportation and the County Attorney. The sketch and legal 11 description shall be prepared by a Florida licensed surveyor and mapper and 12 approved by the owner. 13 14 7. Within 60 days after receiving final site plan approval, the applicant shall execute 15 an agreement to pay afee-in-lieu of construction for sidewalks ormulti-purpose 16 paths and remit to the County the required funds. The acceptable method of 17 payment shall be a corporate check payable to St. Lucie County. A copy of the is standard "Agreement" can be obtained by visiting the St. Lucie County Public 19 Works Departmentwebsite at: http://www.stlucieco.gov/public works/index.htm. 20 zl 8. Pursuant to Section 11.02.08(A)(6) of the St. Lucie County Land Development 22 Code, no work shall commence on the site until all regulatory permits required 23 from federal, state and regional agencies and special districts have been issued. 24 The Florida Department of Environmental Protection, National Pollutant 25 Discharge and Elimination System compliance notice must be submitted to the 26 County Engineer with the constructible site plan at the time of building permit 27 application or during permit review or no paving, grading, and drainage permit 2 s and no building permit shall be issued. All National Pollutant Discharge and 29 Elimination System Best Management Practices shall be instituted on the site 3 o prior to site clearing and maintained daily. Stormwater ponds shall be roughed in 31 at the same time the site is cleared of groundcover. 32 33 9. Prior to the issuance of a building permit, the petitioner, their successors or 34 assigns shall have entered into an enforceable utility service agreement with the 35 St. Lucie County Utilities Department to ensure the provision of water and sewer 36 services. This agreement shall be in the form consistent with the regulations of 37 St. Lucie County Utilities Department regarding utility service extensions and 3 s service provisions. 39 4 0 10. Prior to any construction or development activity on site, a St. Lucie County 41 Stormwater Permit is required in accordance with Sections 7.07.00 and 42 11.05.07. Contact the Code Compliance Division for an application and fees at 43 (772) 462-1553 or go to www.co.st-lucie.fl.us for on-line permit applications. 44 45 B. The property on which this minor site plan is being granted is described as follows: 46 47 LEGAL DESCRIPTION: 48 File No.: MNSP 920094007 GM 10-001 January 18, 2010 Page 3 1 OUTPARCEL "A" 2 3 BEGINNING AT THE INTERSECTION OF THE NORTH LINE OF THE SOUTH 4 65 FEET OF THE SOUTHWEST'/4 OF THE NORTHWEST'/4 OF SECTION 13, s TOWNSHIP 34 SOUTH, RANGE 39 EAST WITH THE EAST RIGHT-OF-WAY 6 LINE OF THE "SUNSHINE STATE PARKWAY FEEDER ROAD" (S.R. 713); 7 THENCE RUN NORTH 89 DEGREES 59 MINUTES 58 SECONDS EAST s ALONG THE NORTH LINE OF THE SOUTH 65 FEET OF THE SOUTHWEST'/4 9 OF THE NORTHWEST'/4 OF SECTION 13, 320 FEET; THENCE RUN NORTH to AT RIGHT ANGLES TO THE LAST DESCRIBED LINE, 25.22 FEET; THENCE 11 RUN NORTH 45 DEGREES 00 MINUTES 02 SECONDS WEST, 208.44 FEET; 12 THENCE RUN SOUTH 44 DEGREES 59 MINUTES 58 SECNDS WEST, 244.11 13 FEET TO THE POINT OF BEGINNING. 14 is TOGETHER WITH: 16 17 OUTPARCEL "B" le 19 BEGINNING AT THE INTERSECTION OF THE NORTH LINE OF THE SOUTH a o 65 FEET OF THE SOUTHWEST'/4 OF THE NORTHWEST'/4 OF SECTION 13, zl TOWNSHIP 34, SOUTH, RANGE 39 EAST WITH THE EAST RIGHT-OF-WAY as LINE OF THE "SUNSHINE STATE PARKWAY FEEDER ROAD" (S.R. 713); 23 THENCE RUN NORTH 00 DEGREES 03 MINUTES 21 SECONDS EAST 24 ALONG SAID RIGHT-OF-WAY LINE, 285 FEET; THENCE RUN EAST AT as RIGHT ANGLES TO THE LAST DESCRIBED LINE, 60 FEET; THENCE RUN 26 SOUTH 45 DEGREES 00 MINUTES 02 SECONDS EAST, 158.86 FEET; 27 THENCE RUN SOUTH 44 DEGREES 59 MINUTES 58 SECONDS WEST, 2s 244.11 FEET TO THE POINT OF BEGINNING. 29 3o C. The approvals granted by this administrative order shall expire on January 18, 2012 31 unless building permits are issued or an extension is granted in accordance with the 3z provisions of Section 11.02.06 (A) of the St. Lucie County Land Development Code. 33 D. The Final Site Plan approval granted under this order is specifically conditioned to the 34 requirement that the petitioner, Indrio Retail, LLC. including any successors in interest, 3 s shall obtain all necessary development permits and construction authorizations from the 36 appropriate State and Federal regulatory authorities including, but not limited to: the 37 United States Army Corps of Engineers, the Florida Department of Environmental 3 a Protection, and the South Florida Water Management District, prior to the issuance of 39 any local building permits or authorizations to commence development activities on the 4o property described in Part B. 41 42 E. The conditions set forth in Part A are an integral nonseverable part of the site plan 43 approval granted by this Development Order. If any condition set forth in Part A is 44 determined to be invalid or unenforceable for any reason and the developer declines to 45 comply voluntarily with that condition, the site plan approval granted by this 46 administrative order shall become null and void. 47 File No.: MNSP 920094007 GM 10-001 January 18, 2010 Page 4 1 F. A copy of this Development Order shall be attached to the site plan drawings described z in Part A, which plan shall be placed on file with the St. Lucie County Growth 3 Management Director and mailed, return receipt requested to the developer and agent of 4 record as identified on the site plan application. 5 6 G. The Certificate of Capacity, attached as Exhibit A, shall be valid for the same period as 7 this order. If this order expires or otherwise terminates, the Certificate of Capacity shall s automatically terminate. 9 to H. The Code Compliance Manager shall receive a copy of this Development Order and the 11 approved site plan and shall not approve any building permits that do not implementor lz are not consistent with this Development Order and the plans hereby approved. 13 14 I. This order shall be recorded in the Public Records of St. Lucie County. 15 16 ORDER effective the 18th day of January, 2010. 17 is 19 GROWTH MANAGEMENT DIRECTOR 20 ST. LUCIE COUNTY, FLORIDA 21 22 23 2 4 BY z5 Mark Satterlee, AICP 26 Growth Management Director z7 2e APPROVED AS TO FORM 29 AND CORRECTNESS: 30 31 32 3 3 BY _ 34 Count Attorney 35 36 37 38 JNJ 39 4 0 G:\PLANNING\PROJECT FILES\ McDonalds @ Indrio Crossing MNSP 920094007/GM Order 10-001.doc 41 File No.: MNSP 920094007 GM 10-001 January 18, 2010 Page 5 St Lucie County Certificate of Capacity Date 12/28/2009 Certificate No. 2848 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan for: 1. Type of development Minor Development Site Plan Number of units 1 Number of square feet 3466 2. Property legal description & Tax ID no. 131323200010004 NE corner of Kings Highway and Indrio Rd. McDonalds @Indrio Crossing 3. Approval: Building Resolution No. GM 10-001 Letter 1/18/10 4. Subject to the following conditions for concurrency: As per Order. Owner's name Indrio Retail, LLC Address 725 Conshochocken State Road Bala Cynwyd PA 19004 6. Certificate Expiration Date 1/18/2012 This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying development orderissued with this certificate, or for subsequent development order(s) issued for the same property, use and size as described herein. Signed a ~ ~ Date: 1/15/2010 Growth Management Director St Lucie County, Florida Friday, January 15, 2010