HomeMy WebLinkAbout1696~o~K 3 42U
To North St. Lucie River Drainage District Vero Beach, Florida
Fort Pierce, Florida ~ 1961
TEMPORARY EASEMENT AND
AGREEMENT
In consideration of the general and special benefits as a result of
the proposed widening and deepening of Header Canai, and the installation
of a pumping station at the southerly terminus thereof, permission is here-
by granted to NORTH ST. LUCIE RIVER DRAINAGE DISTRICT, its
successors Qr assigns, or to contractors working for the North St. Lucie
River Drainage District, its successors and assigns, to enter upon and
use the lands owned by the undersigned and hereinafter described for the
deposit, storage and removal of dredged or excavated material and the
operation of all necessary equipment and vehicles incident thereto, said
land being situated in the State of Florida, County of St. Lucie and de-
scribed as follows:
From a point on the North right of way line of Central
and Southern Florida Flood Control District Canal C-24
which is 110. 15 feet North and 68 feet West of the South-
east corner of Section 14, Township 36 South, Range 38
East; thence run North, parallel with the East line of
said Section 14 a distance of 312 feet; thence run East,
parallel with the North right of way line of C-24, a dis-
tance of 7. 5 feet; thence run Northerly to a point on the
South right of way line of North St. Lucie River Drain-
age District Canal 79 which point measures 47 feet
South and 73. 5 feet West of the Northeast corner of the
SEi of Section 14; thence run West, along said South
right of way line of Canal ?9 a distance of 31. 5 feet;
thence run Southerly to a point which is 312 feet North
of the North right of way line of C-24 and 105 feet East of the
East line of said Section 14; thence run West, parallel with
the North line of C-Z4 a distance of 16 feet; thence run
South, parallel with the East line of Section 14, a distance
of 312 feet to the North right of way line of C-24; thence
East, along said right of way line, 53 feet to point of
beginning.