Loading...
HomeMy WebLinkAbout1391 " ... ~}l 58 L,~688 ~ " ( S T. LUCIE CUNTT, rLA. ._._______".__.___..'._' ...._. .u,", ...... ..... to the right, having a radius of 1250 fe~tj thence Northeastwardly 382.46 feet along the arc of said curve to the right through a central angle of 17031'5011, having a chord bearinG of N 70050'24" Ej thence N 10.23'41" \{ radial to the last mentioned curve 544.63 feet to a point on a circular curve to the right having a radius of 1050 feetj thence Westwardly 335.05 feet along the arc of said curve to the right thro~gh a cen~al angle of 18016'59", havJng a chord bearing Of'~ 83029' 1611 w, to a point of reverse curvature ~ith ~ curve to the left hav- ing a radius of 950 feet; thence Westwardly 506.62' feet along the arc of said curve to the left through a central angle of 30.33\~7", having a chord bearing of S 77-21-07 w, to the point of tangencYj thence S 62004'29" w 80.13 feet,.to the point of curvature of a circular curve to the left having a radius of 25 feetj thence Southwestwardly 39.27 feet along the arc of said curve to the left through a central angle of 900, to the point of tangencYj thence S 27055'31" E 195 feet to the point of beginning. all in the County of st. Lucie, state of Floridaj and that Fort Pierce General Hospital, Inc., a Florida,corporation, is the owner of the aforedescribed premisesj that by virtue of said contract the said E. B. Caldwell ~as to be paid the total of the cost of construction, plus five (5~) per cent, for said l~bor ann materials necessary in connection with said construction, of which there remains due and unpaid as of the present time the sum of Eight Thousand Nine Hundred Twenty-One and 81/100 . ($8,921.81) Dollars under said contract, all in accordance with the accounting which is attached hereto and by this reference uade a part hereof, for preliminary superJiaion, site prepara- tion and cons~ruction of sign. That the preliminary work on said construction was commenced on August 13, 1962, with the actual construction com- mencing on August 23, 1962, and the last labor and materials were furnished to the site on January 29, 1963. That the attached and aforesaid ~ccounting is a just and true accounting of the cost of construction plus five (5~) . - 2 -