S T. LUCIE CUNTT, rLA.
._._______".__.___..'._' ...._. .u,",
......
.....
to the right, having a radius of 1250 fe~tj thence
Northeastwardly 382.46 feet along the arc of said
curve to the right through a central angle of
17031'5011, having a chord bearinG of N 70050'24" Ej
thence N 10.23'41" \{ radial to the last mentioned
curve 544.63 feet to a point on a circular curve
to the right having a radius of 1050 feetj thence
Westwardly 335.05 feet along the arc of said curve
to the right thro~gh a cen~al angle of 18016'59",
havJng a chord bearing Of'~ 83029' 1611 w, to a point
of reverse curvature ~ith ~ curve to the left hav-
ing a radius of 950 feet; thence Westwardly 506.62'
feet along the arc of said curve to the left through
a central angle of 30.33\~7", having a chord bearing
of S 77-21-07 w, to the point of tangencYj thence
S 62004'29" w 80.13 feet,.to the point of curvature
of a circular curve to the left having a radius of
25 feetj thence Southwestwardly 39.27 feet along
the arc of said curve to the left through a central
angle of 900, to the point of tangencYj thence
S 27055'31" E 195 feet to the point of beginning.
all in the County of st. Lucie, state of Floridaj and that Fort
Pierce General Hospital, Inc., a Florida,corporation, is the
owner of the aforedescribed premisesj that by virtue of said
contract the said E. B. Caldwell ~as to be paid the total of
the cost of construction, plus five (5~) per cent, for said l~bor
ann materials necessary in connection with said construction,
of which there remains due and unpaid as of the present time
the sum of Eight Thousand Nine Hundred Twenty-One and 81/100
.
($8,921.81) Dollars under said contract, all in accordance with
the accounting which is attached hereto and by this reference
uade a part hereof, for preliminary superJiaion, site prepara-
tion and cons~ruction of sign.
That the preliminary work on said construction was
commenced on August 13, 1962, with the actual construction com-
mencing on August 23, 1962, and the last labor and materials were
furnished to the site on January 29, 1963.
That the attached and aforesaid ~ccounting is a just
and true accounting of the cost of construction plus five (5~)
.
- 2 -