HomeMy WebLinkAbout2109 ~ r ATTACHMENTS TO CLAIM OF LIEN: Lienor furnished labor, services o~ materials consisting of: (1) Cleared the lot, dug and poured foundation (2) Built blocks up to floor level (3) Hauled fill dirt {4) Roughed plumbing. (Piping for wiring had to go into ground) s; -e~~--~e+---~ea~-i-t~g-~Ad-ai-F-ear~d-f-~-i-a~~Q - (6) Poured slabs (7) Completed block work on the education building (8) Formed and poured pilasters and beams on the education building (9) Set in trusses, dried in roof, completed outside trim on education building (10) Formed and poured pilasters on the main auditorium ~ (11) Completed brick and block work on the main auditoriun ~ (12) Installed arches and windows in the main auditoriun (13) Installed decking heeting on roof (14) Installed piping for wiring on the roof (15) Dried i~ the roof in auditoriun ; (16) Inserted fa~ial boards and outside trim on main auditorium ~ E e ~ (17) Applied stucco to outside areas of auditorium ~ (18) Framed balcony, stairway, etc., on inside of auditorium : ~ } ~ (19) Installed heating in education building ~ (20) Sheetrocked ceilings in the education building *(21) Changed vinyle asbestos tile for education building floor ~ to terrazzo, at the request of Rev. Kilpatrick. ~ *(22) Changed plaster walls to panel at the request of Rev. Kilpatrick ~ (23) Applied molds and base to floors ~ ~ (24) Instal~ed folding petitions for Sunday School building ~ ~ ~ ~ (25) Installed doors, locks, cabinets in kitchen, and checks ~ on doors ~ ~ (26) Pain~ed outside area, varnished and stained inside areas ~ ~ (27) Completed roof installation ~ * (28~ Changed concrete in breezeway drive to terrazzo at the request of Rev. Kilpatrick. #~i~ ~JO~ _ y ~ . - - - - - _ ~ • :n:~, 3 - ~ - -