(29) Installed garage doors in the bree2eway #
;
!
(30) Plastered walls and ceilings in the breezeway ~
t
*(31) Tore down carport on side of the building which had been ~
framed, dried in and 80 per cent completed, at the'request Z
of Rev. Kilpatrick.
(32) Plastered and furred walls in the mai~ auditorium
(33) Installed metal frames, glass door and glass to the front
of the auditorium
(34) Paneled all watls which were not plastered
~35) Trimmed out stairways
*(36) Power nailed 2 x 4's to original concrete floors and installed
wood floor. This change was based on the pastors decision t
to put wood floors over concrete floors, To complete this,
the trimming had to be taken out and doors cut off because
of di fference i n hei ght of f loors.
*(37) Made changes in the vestibule extra wa11s, clay tile
and paneling at the request of Rev. Kilpatrick
*(38) Added extra brick work to the front of the auditoriun at
the request of Rev. Kilpatrick
(39) Stained and varnished the ceiling in the main auditorium
three times at the request of Rev. Kilpatrick. Although
~ he selected thepaint, at the request of Rev. Kilpatrick,
~ he was not satisfied with the color when the painting was
~i completed.
I
~ (40) Completed framing in the pastor's study, choir room, and
i ceiling over the bapistry.
(41) Cut and installed stairway up to the bapistry. ;
. j
(42) Began laying out of pulpit. This was not completed because
Rev. Kilpatrick did not want it as was designed in the plans.
~ Changes made at request of the pastor.
Eguipment used and maintained on the Job:
(1) One one-ton truck ~
,
>
~ (2) One 1967 station wagon
(3) Two skill saws, 15 shovels, 5 picks, 2 mattocks, 2 axes,
1 transit andl table saw, 1 wheel barrow and several hand
1
tools. ~
(4) One tool shack 8x8 built of plywood ,
(5) 400 feet of e~ectric cord and 2 electric drills ~
1
-2 - 1~ '
~ i
~ k~ - - - - - - ~ - ~ ~ x
~ ~ , "~:s°r~' - - -