Loading...
HomeMy WebLinkAbout2365 ~ ' ~ I Southeasterly of, parallel to, contiquous with and as measured ~t riqht anqlea to southerly right of way of Florida $ast Coast Railroad Cut-of f Braneh . TO AAVS AND TO HOLD said Yiqht-of-way and easement unto said Grantae, its succesaors and assigns forever. 1'he Grantors aqree not to build, construct or create, or permit others to build, construct or create any buildinga or ~ other structures within ten (lOj feet on each side of the actual pipeline or pipelines to be laid or installed within the above- . described property as hereinafter limited. The Gran~ee agrees with the arantora, ~their heirs and assigns, as follows: 1. ~hat the pipeline or pipelines to be laid and main- tained under this grant and easement shall be lowered in depth by ~ the Grantee and at~i.ts expense, forthwith upon the request of the Grantor, in the event that a spu.z rail~ctad track, road or high- way is constructed upon the above-described lands, to a depth sufficient to prevent interference with the construction arid use ~ of such a spua~ railroad track, road or hiqhway. 2. 1'hat the pipeline or pipelines to be laid and main- tained under this grant and easement shall be laid and maintained at least three (3) feet below the surface of the qround in order to permit nonaal cultivation and Grantors shall have the right to fully use and enjoy the full use of the above-described lands sub ject to the right-of-way and easement herein granted. 3. That the Grantee ahall dispose of trees and timber not needed for the laying of the pipeline or pipelines by cutting tree trunks and larqer limbs of not less than eiqht (8j feet and ~ , ~ ~ shall atack the saiae alonq the edge of the riqht-of-way; that a21 ~ brush, trimmings and atumps removed fram the ditch line or line~ us wntp i~ ~ m shall be burned or dfspoaed of in a manner acceptable by the ~ r, ~ow~ ..wr.M.t...* wwaw~t wiw~ ?W[T MpC~. /~iO~IM ~ ~1'~ ??~2351 ` _ . . . _ y~~ ~ - _ ~ _ . - . . s F _ ~