Loading...
HomeMy WebLinkAbout0517 • , ~ . : . IV. (A) No later than thirty days from the date of the entry of this Final Judqment, the Defendants, at their own expense, shall do the following: ~i) Construct a new plug in the canal at a ' lxation so that its centerline is approximately 365 feet west of the west bank of the north-south leq of said canal, and at the location shown in the survey attached hereto, designated as ~ibit A, and with the new plug being de- ~ scribed therein as "proposed dike". . (ii) Construct the new plug so that it completely spans the width of said canal and so that the top of the new plug is at least 15 feet wide in an east-west di.rection; the base not less than 20 feet, nor more than 25 feet wide in an east-west direction and with the height of the plug matching surrounding land grades. (B) The plug preseritly situate in the canal shall not be removed or altered until the cvnstruction of the new glug has been completed, in accordance with the tenus of this Final Judg~ent. .(C) The Defendants and their grantees, successors, or assigns, shall -,aintain the plug described in Paragraph IV(A) in such a manner that there is no intermingling of the saline waters of the Indian River with the waters of the canal west of the plug as finally constructed; so that the waters west of the plug, as finally constructed in said canal, do not ~ i~termingle with the saline waters of the Indian River; so # . ; ~ that there is~no depletion of the fresh water table surrounding ~ _ the canal due to the presence of said canal; so that there is ~ no instursion of saline waters into the fresh water table sur- z . rounding the canal due to the presence of said canal; and so 's 844K PAGf t~~~ _3_ ~ _..s . . ~ ~r