HomeMy WebLinkAbout01-024 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
43
44
45
4~
RESOLUTION 01-024
FILE NO.: RZ-00-015, PUD-00-011 AND MJSP-00-009
A RESOLUTION AMENDING PARAGRAPH 21 OF RESOLUTION 01-012
WHICH GRANTED PRELIMINARY AND PARTIAL FINAL PLANNED NON-
RESIDENTIAL DEVELOPMENT DISTRICT APPROVAL FOR THE
PROJECT TO BE KNOWN AS MIDWAY-COONEY GROVES/MIDWAY
ENERGY CENTER
WHEREAS, the Board of County Commissioners of St. Lucia County, Florida, based on
the testimony and evidence, including, bUt not limited to the staff report, has made the
following determinations:
On April 3, 2001, the Board of County Commissioners approved Resolution
01-012 granting Preliminary and Partial Final Planned Non-Residential
Development District approval for the project to be known as Midway-Cooney
Groves/Midway Energy Center.
Paragraph 21, of Resolution 01-012, incompletely describes the proposed
Midway Enerqy Center project.
The proposed Midway Enerqy Center project consists of three (3) 170
megawatt electrical generation units, for a total of 510 megawatts of
generation capacity. Paragraph 20 incorrectly references only one of these
170 megawatt units.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St.
Lucia County, Florida:
A. Paragraph 21, of Resolution 01-012 is hereby amended to read as follows:
21.)
Coonev-Midway Groves, LC and Midway Development
Company, LLC., has presented a petition for Final Planned
Nonresidential Development approval for Lot 2 of the
Cooney/Midway Groves PNRD for the purpose of
constructing of a three (3), 170 megawatt, electrical generation
units, for a total o~eqwatt, electrical generation facility,
said facility to be referred to as the Midway Enerqy Center, to
be located on the property described in Part G.
Ctr',k~ Tihroug,h is for deJetJon
Double Underline is for addition
All other terms and provisions of Resolution 01-012, except the above referenced
Paragraph 21, shall remain in full force and effect.
File No.: RZ-00-015, PUD-00-011 AND MJSP-00-009
May 22, 2001
Resolution 01-024
Page 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
3O
31
32
33
34
35
36
37
38
39
4O
41
42
43
44
45
46
A corrected Certificate of Capacity as required under Chapter V, St. Lucie County
Land Development Code, a copy of which is attached to this resolution, was granted
by the Community Development Director on May 22, 2001. The terms, conditions,
and effective period of the original Certificate of Capacity shall remain in full force
effect.
A copy of this resolution shall be attached to the site plan drawings described in
Resolution 01-012, which plan are on file with the St. Lucie County Community
Development Director. Further, the St. Lucie County Community Development
Director is hereby authorized and directed to cause the notation of this resolution
to be made on the Official Zoning Map of St. Lucie County, Florida, and to make
notation of reference to the date of adoption of this Resolution.
After motion and second, the vote on this resolution was as follows:
Chairwoman Frannie Hutchinson
AYE
Vice-Chairman Doug Coward
AYE
Commissioner Paula A. Lewis
AYE
Commissioner John D. Bruhn
Commissioner Cliff Barnes
ABSENT
AYE
PASSED AND DULY ADOPTED this 22nd day of May 2001
BOARD OF COUNTY CC
ST. LUCIE COUNTY, FLORI.I
ATTEST:
Deputy
01-024a(h)
APPRO¥~D AS TO FORM
AND COF~RECTNE ~S/~
Cou nty~aYey
File No.: RZ-00-015, PUD-00-011 AND MJSP-00-009 Resolution 01-024
May 22, 2001 Page 2
St Lucie County
Certificate of Capacity
Date 4/3/01 Certificate No. 457
This document certifies that concurrency will be met and that adequate public facility
capacity exists to maintain the standards for levels of service as adopted in the St
Lucie County Comprehensive Plan for:
1. Type of development Final Planned Non-Residential Development
Number of units 1 Number of square feet 132,550
2. Property legal description & Tax ID no.
2334-340-0000-000/7 AND 3303-210-0000-000/4 (part of)
No. side W. Midway Road/1/2 mi w/of 1-95
MIDWAY ENERGY CENTER. COONEY/MIDWAY GROVES PNRD
3. Approval: Building Resolution No. 01-012 Letter
4. Subject to the following conditions for concurrency:
Construction of three (3) 170 megawatt electrical generation units, for a total of 510 megawatts of
generation capacity (see approved site plan for specific site details).
Owner's name
ROBERT L. DE AQUINOS
Address
250 S AUSTRALIAN AVE.
WEST PALM BEA FL 33401
6. Certificate Expiration Date 4/1/03
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel, and is subject to the same terms, conditions and expiration date listed herein.
The expiration date can be extended only under the same terms and conditions as the
underlying development orderissued with this certificate, or for subsequent
development order(s) issued for the same property, use and size as described herein.
Community Development Director
St Lucie County, Florida
Tuesday, May 22, 2001
Date: 5/22/01
Page 1 of 1