Loading...
HomeMy WebLinkAbout0711 { ,s '°y AGREEMENT This Agreement is entered into this ''day of a 1979 by and between Bryn Mawr Camp Resorts, Inc.. here na t~ sometimes referred to as."Bryn Mawr" and Greg i 8i11's Pool Plastering and Remodeling, hereinafter sometimes referred to as"Greg & Bill's". For and In Consideration of the sum of Ten Dollars ($10.00) the mutual covenants herein and other good and valuable con- sideration.the adequacy and receipt of which is hereby acknow- ledged. 1. Bryn Mawr agrees to serve as the General Contractor and supply the materials for the repairing of the swimming pool located at the Bryn Mawr Camp Resort 5100 N. AlA, Fort Pierce, Florida. 2. Greg & Bill's agrees to provide the required labor for the repairing of the swimming pool as noted herewithin the signed agreement. ~ 3. Bryn Mawr agrees to supply all materials but in no event will the sum of alI supplies exceed Two Thousand Six Hundred and Fifty-Eight Dollars and no cents ($2,658.00). 4. In the event. the supplies needed to complete the pro- ~ ject exceeds the sum as noted in paragraph 3, Greg & Bill's agrees to have the amount deducted from the charges being made for any labor. 5. Greg & Bill's shall drain and prepare the pool's interior surface by acid washing. 6. Greg & Bi21's shall repair all visible cracks and leaks in the tank of the pool. 7. Greg & Bill's shall remove and kill all algae in the pool with chemicals and chiseling. 8. Greg ~ Bill's shall repair all broken file in all racing lanes and replace all tiling on scum gutters ircludinq two (2) rows of bulln~se anc; •:ne row of mosaic. Color and style of the to be mutually agreed upon. 9. Greg & Bill's agrees that the surface to which ceramic the is to be applied shall be free from defects, loose materials, film or other conditions which would impair the bond strength of the in- stallation. 10. Greg ~ Bill's agrees to install Chattahoochee stone surface on the top and outside edge of the exterior lip of the scum gutter. Quality and color of stone to be mutually agreed upon. 11. Greg 6 Bill's agrees to remarcite entire surface of pool, refill, chlorinate, clean, and stabilize pool water. Finish coat shall have a smooth finish and PooL.Ce be guaranteed for a period of one year. ~ y 61. 12. Bryn Mawr agrees to make payments in the following 1~11a, manner: A. Upon completion of items 5,6,and 7 payment of $3,500.00 will be made. B. Upon the completion of items 8,9,and 10 a payment of $6,850.00 will be made. C. Upon the completion of the balance of the contract a final payment of $2,771.00 will . be made. t~t ~ ~ -