Loading...
HomeMy WebLinkAbout01-138 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 RESOLUTION 01-138 FILE NO.: MJSP-01-001 A RESOLUTION GRANTING MAJOR SITI~ APPROVAL FOR THE PROJECT TO BE ~ AS MIDWAY INDUSTRIAL PARK, PHASJ THE IH (INDUSTRIAL HEAVY) ZONING DI~ FOR PROPERTY LOCATED IN ST. COUNTY, FLORIDA. WHEREAS, the Board of County Commissioners of St. Lucie County testimony and evidence, including but not limited to the staff report, determinations: Midway Properties of St. Lucie County, LC,, presented a petit Approval to allow an 18-1ot industrial subdivision to be known Park, Phase III Subdivision on 286 acres of land at the n, intersection of South Jenkins Road and West Midway Road Heavy) Zoning District for the property described in Part B below The Development Review Committee has reviewed the site project and found it to meet all technical requirements and to future land use maps of the St. Lucie County Comprehensive'[ conditions set forth in Part A. The proposed project is consistent with the general purpose, standards of the St. Lucie County Land Development Code, Comprehensive Plan and the Code of Ordinances of St. Lucie Cz PLAN NOWN -- III IN STRICT LUCIE Florida, based on the ~as made the following )n for Major Site Plan as Midway Industrial )rtheast corner of the in the IH (Industrial dan for the proposed be consistent with the 'lan, subject to certain goals, objectives and the St. Lucie County }unty. With the conditions imposed pursuant to this Resolution, the pr, have an undue adverse effect on adjacent property, the charact(~r of the neighborhood, traffic conditions, parking, utility facilities, or other matters affe(~ting the public health, safety and general welfare. / / All reasonable steps have been taken to minimize any adverse~ffect on the proposed project on the immediate vicinity through building design, site design including upland and wetland buffers, landscaping and screening. )posed project will not ~posed project will be the development and regulations. rvice to the proposed With the conditions imposed in Part A of this Resolution, the pr constructed, arranged and operated so as not to interfere with use of neighboring property, in accordance with applicable distric The Fort Pierce Utility Authority will provide water and sewer sE project. A Certificate of Capacity, a copy of which is attached to this reso the Community Development Director on September 25, 2001. File No.: MJSP-01-001 September 25, 2001 ution, was granted by Resolution 01-138 Page 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 NOW, THEREFORE, BE IT RESOLVED by the Board of County Cor~ County, Florida: Pursuant to Section 11.02.05 of the St. Lucie County Land De/ plan for the project to be known as Midway Industrial PaJ approved as depicted on the site plan drawings for the project Terpening, Inc., dated 3/26/01, last revised 8/21/01, and date St. Lucie County Community Development Director on 8~ described in Part B, subject to the following conditions: Prior to issuance of any building permits for any lot within ti Park, Phase III Subdivision, the petitioner, their successo convey to St. Lucie County, in manner and form acceptable to Attorney, the south 40 feet of the parcel for the future wider Road. To the extent permitted under the County's Code and such dedication may be considered eligible for Road Impact FE Prior to issuance of any building permits for any lot within ti Park, Phase III Subdivision, the petitioner, their successo~ convey to St. Lucie County, in manner and form acceptable to Attorney, the road right-of-way for South Jenkins road as depi drawings referenced in this Resolution. To the extent County's Code and Compiled Laws, any such dedication eligible for Road Impact Fee Credits. Prior to the issuance of any building permits on any of the referred to as the Midway Industrial Park, Phase Ill site plan, developer, his successors or assign to that property shall be complete site plan for review and approval, regardless of thc Each site plan shall be prepared in accordance with the reqL Section 11.02.00 of the St. Lucie County Land Development C~ site plan submittal shall be required to provide a traffic impact by a professional engineer registered in the State of Florida an familiarity with traffic planning practices, the purpose of whicl cumulative impact review of the developments traffic im[ proposed use of the property requires review and processing ~ all development reviews shall be proCessed consistent with Review process. Should a conditional use permit be requi~ process shall be adhered to. Prior to the issuance of the first building permit, in any porti development project known as Midway Industrial Park, Phas proposals on Lots 5, 7 or 8, provided that the developmenl associated with the development of the Duke Energy site pl~ through Resolution 01-007, the developer shall post a letter of of security acceptable to the St. Lucie County Attorney, in the the cost to provide for the signalization of the intersection of and West Midway Road. The estimated cost of this signalizatio required amount to bonded would be $87,500. If after 10 yei the required security being posted with St. Lucie County warranted, the security shall be refunded or released. File No.: MJSP-01-001 September 25, 2001 missioners of St. Lucie alopment Code, the site · k, Phase III, is hereby ,repared by Culpepper & ;tamped received by the !3/01, for the property le Midway Industrial 's or assigns, shall the St. Lucie County lng of West Midway Compiled Laws, any .e Credits. ~e Midway Industrial 's or assigns, shall the St. Lucie County :ted on the site plan ~ermitted under the may be considered lots within the area excluding lot 5, the 'equired to submit a size of the project. rements set forth in ~de. Each individual statement, prepared with demonstrated is to provide for a ~cts. Unless the :s a conditional use, :he Minor Site Plan ed, the appropriate 3n of the proposed ~ III, excluding any on Lots 7 or 8 is :n project approved credit or other from ~ount of one-half of ;outh Jenkins Road ~ is $175,000. The irs from the date of raffic signal is not Resolution 01-138 Page 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 No building permits for any portion of the Midway Industrial Pt issued until contracts have been let for the construction of de( (north, south, east and west) at the intersection of West Midv Road. No Certificates of Occupancy shall be issued for any [ Industrial Park until the construction of these turn lanes has b condition shall not apply to any proposals on Lots 5, 7 or development on Lots 7 or 8 is associated with the developmer site plan project approved through Resolution 01-007. No building permits for any portion of the Midway Indus1 development lying south of NSLRWCD Canal No. 102 issued until left and right turn lanes are provided along West intersection of South Jenkins Road and West Midway Road. Park, Phase III development lying north of NSLRWCD Canal I~ may be developed until the intersection of Energy Drive and S( signalized. If it is shown that the required signal improvemenl then these improvements may be deferred until warrants are studies at this intersection shall be a part of any traffic in submitted as required condition number 2. rk, Phase III, may be licated left turn lanes ,ay Road and Selvitz ,ortion of the Midway .~en completed. This 8, provided that the of the Duke Energy iai Park, Phase Ill ; south 1~) shall be Midway Road at the 10. 11. 12. No building permits for any portion of the Midway Induslrial Park, Phase III development lying south of NSLRWCD Canal No. 102 (thq~ south 1~) shall be issued until right and left turn lanes are provided along WestIMidway Road at the intersection of Post Office Road and West Midway Road. / / No more than 38 acres (2,400 aadt trips) of any portion of tl~e Midway Industrial Io. 102 (the north Y2) ;Ivitz Road has been s are not warranted, "net. Signal warrant 3act fee statement Prior to the issuance of any Land Clearing Permits for any I( Industrial Park, Phase III Subdivision, the developers shall areas to be preserved and/or protected. Delineation shall be safety fencing or similar type of materials. All land clearing accordance to the specific conditions/standards outlined in Permit. Prior to commencement of any land clearing activities, the d obtained from the appropriate permitting authorities all nec approvals to provide for the relocation of all gopher tortoises site. Prior to the elimination of nay gopher tortoise burrows, ali shall have been fully explored and demonstration of the inabili relocate any on-site gopher tortoises shall be demonstrated to The proposed wetland mitigation/preservation area depicted plan is recognized as conceptual in nature and subject to furth{ agency approval. If any agency approvals are not obtained Or is found to be more appropriate, the project mitigation plan dep submittal shall be amended accordingly. Final plats for this project shall include as part of the re( easements, all required upland buffers for the isolated wetl buffers shall consist of preserved or planted vegetation but si understory, and ground cover of native species only. The edg~ at the upland limit of any wetland or deepwater habitat and a r square feet of buffer shall be provided for each linear foot of w, habitat perimeter. This upland edge habitat is to be located File No.: MJSP-01-001 September 25, 2001 within the Midway :learly delineate all )y either silt fencing, activities shall be in the Land Clearing @veloper shall have 9ssary permits and ound on the project efforts at relocation :y or implacability to ;t. Lucie County, on the project site ~r Federal and State f an alternative plan cted in the site plan luired conservation ands. The upland ~all include canopy, ; habitat shall begin ninimum of ten (10) .~tland or deepwater o that no less than Resolution 01-138 Page 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 fifty (50) percent of the total shoreline is provided with a buffer feet in width. 13. As part of the Platting of this property, the referenced Con,' project site plan shall be recognized as non-buildable parcels. 14. As part of the Platting of this property, all conservati environmental dedications shall include a requirement that St. any release, in part or total, of any portion of any conse dedication. 15. As part of the site plan of the review process for all lots with Park, Phase III development area, all development is SL requirements of Chapter 6, of the County's Land Developmer be clear-cut or otherwise altered until a complete vegetatior plans has been submitted to and approved by St. Lucie Count' The property on which this Major Site Plan approval is being follows: DESCRIPTION Parcel I That part of the south one-half of Section 31, Township 35 Soufl St. Lucie County, Florida, lying south and east of the Florida Eai right-of-way; Less and except the following: (i) That portion of thereof conveyed to the City of Fort Piercl use and benefit of the Fort Pierce Utilities Authority a., special deed dated November 9, 1992, recorded in O. R. 1135 of the Public Records of St. Lucie County, Florida; Also less: The right-of-way for North St. Lucie River Water Control Di and 102; Also less: (iii) The right-of-Way for Selvitz Road. PARCEL II Lot 8 in the northeast one-quarter of MODEL LAND COMPANY'S Section 6, Township 36 South, Range 40 East, as per plat thereof Book 4, Page 34 of the Public Records of St. Lucie County, FI except the right-of-way for North St. Lucie River Water Control Di also less the right-of-way for Favorite Road. File No.: MJSP-01-001 September 25, 2001 strip at least ten (10) ervation Lots on the on easements and Lucie must approve · vation easement or he Midway Industrial ~ject applicable and ~t Code. No lot may removal/ protection · anted is described as Range 40 East, Coast Railroad ;, Florida, for the described in a Book 816, Page strict Canals 101 SUBDIVISION of recorded in Plat orida; Less and strict Canal 102; Resolution 01-138 Page 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 Parcel II1: Being all that part of Lots I through 6, inclusive, and Lots northwest one-quarter of MODEL LAND COMPANY'S SUBDIVISI(: Township 36 South, Range 40 East, as per plat thereof recorde Page 34 of the Public Records of St. Lucie County, Florida, lyin~ boundary of the Plat of MIDWAY INDUSTRIAL PARK, as recorde~ Page 35, Public Records of St. Lucie County, Florida: Less and except the right-of-way for North St. Lucie River WatE Canal 102; also less the right-of-way for Favorite Road, adjacen: also less the right-of-way for Midway Road. Parcel IV: Lot 15 in the northwest one-quarter of MODEL LAND COMPANYq Section 6, Township 36 South, Range 40 East, as per plat therec Book 4, Page 34 of the Public Records of St. Lucie River County, Less and except there from the following: (i) The rights-of-way for Favorite Road and Midway Road. Aisc less; (ii) That portion of thereof conveyed to the United Stated described in Warranty Deed, dated July 22, 1987, recor 550, Page 2472 of the Public Records of St. Lucie County, Aisc less; (iii) A 70-foot wide strip of land dedicated as road right-of-w Lucie County, Florida, by that certain Deed of Dedication, 1988, recorded in O.R. Book 601, Page 370 of the Publi Lucie County, Florida. PARCEL V: All that part of Favorite Road, a former 50-foot right-of-way, lying one-quarter of Section 6, Township 36 South, Range 40 East, a: and described in, Resolution 98-119, dated June 2, 1988, recorC 1156, Page 1096 of the Public Records of St. Lucie County, Florida Containing 286.35 acres, more or less. (Location: Northeast corner of the intersection of South Jenkins Road and W~ This site plan approval shall expire on September 25, 2003, un approval for the required improvements associated with this Maj( approved by St. Lucie County. Unless otherwise addressed th~ plan review/approval process, all required infrastructure and imp with this subdivision shall be completed within 12 month., construction plans by St. Lucie County. In no case shall the a Major Site Plan, for the purpose of constructing the infrastruct~ File No.: MJSP-01-001 September 25, 2001 3 and 14, in the N of Section 6, d in Plat Book 4, east of the east in Plat Book 38, Control District to Lots I and 2; SUBDIVISION of recorded in Plat Iorida; 'ostal Service as led in O.R. Book -'lorida; ty in favor of St. dated August 11, Records of St. n the northwest abandoned by, ed in O.R. Book st Midway Road) less construction plan ,r Site Plan have been ough the construction rovements associated of approval of the )proval period for this re and improvements Resolution 01-138 Page 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 shown on the site plan, be greater than September 25, 2003, sucessors or assigns, has obtained an extension to the develop as provided for under Section 11.02.06(B) of the St. Lucie Cot Code. Upon the completion, certification, approval by St. Luck of the final plats for this subdivision, no further general site development extension shall be required for the Midway Ind, site plan, except as may otherwise be restricted by the oonditi~ above, and expect as may lawfully be restricted by applicable regulations. The Major Site Plan approval granted under this Resolution is to the requirement that the petitioner, Midway Properties of including any successors in interest, shall obtain all necessar and construction authorizations form the appropriate State r~ authorities, including but not limited to: the United States Army Florida Department of Environmental Protection, and the Management District, prior to the issuance of any local authorizations to commence development activities on the pro B. A Certificate of Capacity, a copy of which is attached to this res nless the petitioner, his 'nent approvals periods nty Land Development ; County and recording alan approval or other ,strial Park, Phase III, )ns described in part a 3rate or local statute or specifically conditioned St. Lucie County, LC, t development permits nd Federal regulatory Corp of Engineers, the South Florida Water building permits of )erty described in Part the Community Development Director on September 25, 2003, which certificate shall remain valid for the period of Site Plan approval. Should tl~e Site Plan approval granted by this resolution expire or an extension be sough~t pursuant to Section 11.07.05(F) of the St. Lucie County Land Development Cod~, a new certificate of capacity shall be required. 1 / A copy of this resolution shall be attached to the site plan drawin~gs described in Part A, which plan shall be placed on file with the St. Lucie County Cdmmunity Development Director. After motion and second, the vote on this resolution was as follows: Chairman Frannie Hutchinson Vice-Chairman Doug Coward Commissioner John Bruhn Commissioner Paula Lewis Commissioner Cliff Barnes AYE AYE AYE AYE AYE PASSED AND DULY ADOPTED this 25th day of September 2001. ~lution, was granted by File No.: MJSP-01-001 September 25, 2001 Resolution 01-138 Page 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 BOARD OF COUNTY ST. LUCIE COUNT BY APPROVED AS TqFORM OS H:\projects\Midwy Industrial Park~Agenda\Resolution01138 File No.: MJSP-01-001 September 25, 2001 Resolution 01-138 Page 7 St Lucie County Certificate of Capacity Date 9/26/2001 C This document certifies that concurrency will be met and that ade~ capacity exists to maintain the standards for levels of service as a County Comprehensive Plan for: 1. Type of development MAJOR SITE PLAN/PRELIMINARY PLAT Number of units 0 Number of square feet 0 2. Property legal description & Tax ID no. 3406-501-0034-000/0;3406-501_0014_000/4;2431-411-0001-000/9 NE CORNER INTER S JENKINS RD & W MIDWY RD MIDWAY INDUSTRIAL PARK, PHASE III MIDWAY INDUSTRIAL Pt 3. Approval: Building Resolution No. 01-138 4. Subject to the following conditions for concurrency: THE CREATION OF AN 18-LOT INDUSTRIAL SUBDIVISION Owner's name MIDWAY PROPERTIES OF ST LUCIE COUNTY L.C. Address 161 N CAUSEWAY, SUITE 8 NEW SMYRNA B FL 32169 6. Certificate Expiration Date 9/25/2003 This Certificate of Capacity is transferable only to subsequent own parcel, and is subject to the same terms, conditions and expiration The expiration date can be extended only under the same terms an underlying development orderissued with this certificate, or for sul development or~)~is~ed_fo~ the same property, use and size a., Signed ~,"J .- ~v ,~nnt]Date: 9/26/2001 Community Development Director St Lucie County, Florida Wednesday, September 26, 2001 .=rtificate No. 625 luate public facility dopted in the St Lucie Letter 09/26/01 ers of the same date listed herein. d conditions as the )sequent described herein. Page 1 of 1