Loading...
HomeMy WebLinkAbout1332 + 4'7s4'~8 . Director of Utilities Fort Pierce Utilities Authority ',iunicipal Building ; 206 South 6th Street E Fort Pierce, Florida 33450 Dear Sir: The undersigned does hereby apply to the Fart Pierce Utilities { Authority for an extension of water service outside the City Limits of the City of Fort Pierce, Florida, to the following described property ~~~hich I own, to-wit o 'T i Q u o c,Y / ~/.c/i T r f}iiP~D~E'7" ~~l'~/STi~/~ L f ~A~X ~ The mailing address of the above described property? is: 3o y~ i~r/D~/s T,Q~~4G ,~3~~ sr ~ ~i~~c~9 FL.9. 3.3 Aso I understand that in order to obtain extension of such water service, that I will be required to pay the cost of construction of such water line from the point of eonnection_~vith existing lines of 'the Utilities Authorit;? to my property, that the total of such cost shall be deposited with the Utilities Authority prior to the time of the construction of said line, that I :vill be obligated to pay all meter fees_and connection charges required under the Resolutions of the Utilities Authority for such service prior to the installation of said line, and that I will pay, ~r:~en billed, for all water furnished to my property according to the rates established by the Utilities Authority for t:~e service I receive. 1 In addition to the deposit of said construction cost as set forth in the above paragraph, I understand that upon execution of this application, I am required tQ deposit with the Utilities Authority an amount equal to ten (lOn) percent of the connection fees for water , service for each unit to be served to and including twenty-five (25) units, and five (50) percent of such connection fees for each unit in t excess of twenty-five (25) units. In the event this application is not approved by the Utilities Authority and the City Commission of the City of Fort Pierce, then such deposit will be returned to me. If this application is approved by the Utilities Authority and the City Commission of the City of Fort Pierce, the deposit of the connection fees as above outlined shall be credited to the total cost of the connection fees. I further understand that if this application is approved by the Utilities Authority and the City Commission of the City of Fort Pierce, Florida, and I have not completed construction of the water line requested ~cithin o~~e year from the date of the approval by the City Co:nr:~ission of the Cicy of F~i•t Pierce, Florida, then such approval shall become null a.~d void and it will become necessary for me to initiate a new application far such water service. I understand that the extension of said water service to my property shall be contingent, upon the a'oility of the Utilities Authority to supply the denand requested by me without in any way interfering with the water services now performed by the Utilities Authority for the inhabitants of the City of Fort Pierce, Flot•ida. I hereby agree that in consideration of mt~ request for the extension of water service to r.~y property under the conditions above ' mentioned, that if my property becomes contiguous to the City Limits of the City of Fort Pierce, Florida, as such ter~r is defined in the laws of Florida, then this application shall be considered as my application for 6 r { 8~~~327 ~,~E133~: a~..~