HomeMy WebLinkAbout0080 A D D S N D U K " A"
Begin at a concrete monument 355.59 feet South and SS2.50 feet West
of the NB corner of the SS 1/4,.Section 16, Township 36 South, Range
40 East: From said Point of Beginning, run Nest 582.50 feet to a
post; thence continue West 528.67 feet, to a post (located 8 feet,
more or less East of the East bank of the North Fork of the St. Lucie
River); thence continue West to the center of said river; thence
Southwesterly and Southeasterly along the center line of said St.
Lucie River to a point which is 606.09 feet South of the North line
of said SB 1/4 of said Section 16, Townshig 36 South, Range b0 East;
thence East to a post which is located 10 feet, more or_.less, East of
the East bank of said river; thence continue East 685.72 feet to a
concrete monument (located at the Sast edge of the river hammock);
thence continue East 552.50 feet to a concrete monument; thence North
250.50 feet to the Point of Beginning.
TOGETBER WITH riparian rights and that certain easement for ingress and
egress created by a grant of easement in that certain Warranty Deed
from Edward P. Goodwin, et ux to Ansel L. Wharton, et ux, dated and
filed April 1, 1966, in Official Records Book 142 at page 237, Public
Records of St. Lucie County, Florida.
I~<
!9~ 1?UG -4 N111: 25
F~t0RDE0
F LEO A ~ jY,FIA.
STR~~~ pp
7RA5
aERK CIRCWI CO~t ~
RECCRD YERIiIED
494950
3
8 ,
i
5
BOOK JJV PAGE
~