Loading...
HomeMy WebLinkAbout15616. To induce Utility to provide the water treatment facilities and to continuously provide consumers located on the Property with water services, Developer hereby covenants and agrees to construct and to transfer ownership and control to Utility as a contribution in aid-of-construction the on-site water distribution system referred to herein as a contribution in aid-of-construction. Developer shall cause to be prepared engineering plans prepared by and sealed by a professional engineer registered in the State of Florida, showing the on-site water distribution sys- tem proposed to be installed to provide service to consumers wi.th- in the subject Property. Such detailed plans may be limited to the first Stage area only and subsequent stages may be furnished from time to time. However, each such Stage area shall conform substantially to a master plan for the development of the Property and such n~d~ter plan shall be submitted to Utility concurrent with or prior to submission of engineering for the first Stage. Deve- loper shall cause his engineer to submit specifications governing the material to be'used and the method and manner of installation. All such plans and specifications submitted to Utility's engineer shall be subject to the approval of Utility and no construction shall commence until Utility has approved such plans and specifi- cations in writing. Complete as-built plans shall be submitted to Utility upon completion of construction. After the approval of plans and specifications, Developer shall cause to be construc- ted, at Developer's own cost and expense, the water distribution system as shown on the plans and specifications. Developer shall be r.equired to pay the applicable charge (as set by Utility from time to time) for water meters and meter installations of sufficient capacity_for all single family resi- dential, multi-family, mobile.home, commercial installations and meter installations of sufficient capacity for all single family residential, multi-family, mobile home, commercial installation or any other connection requiring a measuring device. ' Duri~g the construction of the water distribution system by Developer, Utility shall have the right to inspect such in- stallation to deterntine con~ormation with the plans and specifi- cations as submitted by the Developer to Utility subject to agreed upon changes. Utilit}• shall control the quality of the installa- tion and further shall be entitled to perform standard }ests for infiltration, exfiltration, line and grade all other normal engi- neering tests to determine that the system has been installed in accordance with the plans and specifications and good engineering practices. Developer agrees to pay to Utility or Utility's auth- orized agent, a reasonable inspection fee in an amount equal to ~ 1$ of the contract price if the DeveloFer's installations will add more than 100 ERC's to the water distribution system. If the num- ber of ERC's to be added to the water distribution system is a hundred ERC's or less, then~the amount to be paid as a reasonable inspection fee will be equal to 2$ of the contract price. Such inspection fee shall be payable upon construction of each phase or Stage of development. Provided that Utility shall be ready, willing and able ta render service to Developer, by these presents, Developer herehy transfers to Utility, title to all water distribution sy~tems installed by Developer or Developer's contractor, pur- suant to the provisians of this Agreement, such conveyance to take effect without further action upon the acceptance by Utility of the said installation. As further evidence of said transfer of title, and upon the completion of the installation and prior to the rendering of service by Utility, Developer sha21 convey to Utility, by Bill of Sale, in form satisfactory to Utility's -4- ~, ~~:~K ~ ~~at~E15J~ ~ ~