Loading...
HomeMy WebLinkAbout0970 ~ J - 1 , f ~ • . . • ,i ' . ~ y ~ - . ~ (d) The common and botanical names, sizes and location of all trees, shrubs or desirable vegetative cover on the site to be developed which are respectively to be retained, removed, relocated or replaced. Groups of trees in close proximity may be designated as "clumps" of trees with the predominate type, estimated number and average diameter noted. VI. ALTERNATE SITE PLAN INFORMATION In the event that there are no trees, shrubs or vegetative cover located on the site to be developed which are required to be protected under the provisions of these requirements, the applicant shall so state in his application for permission hereunder. If such statement is substantiated by a field inspection of the site by a representative of the ARC, the applicant shall be relieved of the necessity of supplying unnecessary or unimportant information. VII. PRE-APPLICATION INSPECTION In connection with application under the alternate site plan procedure, and in connection with application involvinq larqe tracts of property, a representative of the ARC shall make his services available for pre-application inspection of the sites involved. VIII. SPECIAL CONDITIONS FOR ISSUANCE OF PERMISSION FOR REMOVAL No permission shall be granted for removal of trees, shrubs or vegative cover ~nless one of the following conditions exists: ~ ~ (a) The tree is located in the buildable area or yard area ~ where a structure or improvements may be placed and it unreasonably restricts the permitted use of the property and such tree cannot reasonably be relocated elsewhere on the proprty. (b) The tree cannot be relocated on or off the site because of the age, type or size of the trEe. ~ (c) The tree is diseased, injured, in danyer of falling, too close to existing or proposed structures, interferes with the existing utility service, creates unsafe vision clearance or _ conflicts with other restrictions or regulations. ~ IX. TREE PROTECTION ~ ~ (a) Durinq the land clearing and construction stage of ~ development, the developer shall erect and maintain protective ~ barriers (to ARC specification) around all trees or groups of ~ trees to be protected. The developer shall not allow the movement of equipment or the storqaqe of equipment, materials, debris or fill to be placed within the protective barrier. 7-17-85 Res Czk 2 4 RooK 473 ~~~f 9f S ; , . _ . Y ._w _ _ ~ - ~ _ _ _ _ ~ _ .