Loading...
HomeMy WebLinkAbout0927 i ~ 1 ; 1 - . ~ ~ ~ . , 4 - ~ ~ , the utility company. In a proceeding for an interim de~rease, the term "last authorized rate of return on equity" used in subparagraph b means the maximum of the range of the last authorized rate of return on equity established in the most recent rate case of the utility. ; ~ (e) Nothing in this section shail be construed to prohibit the Authority from authorizin~ interim rates for a utility which does not have an suthorized rate of return reviously established ~ by the Authority. ~ ~ ~ SECTION 1-20.5-10. Determination of official date of ffling. ~ ~ Withiri 30 days after receipt of an application, rate ~ ~ request, or other written document for which an official. date of ; filing is to be established, the Authority or its designee shall either determine the afficial date of filinq or issue a statement of deficiencies to the applicant, specifical2y listing why said. applicant has faiZed to meet the minimum filinq requirements = Such statement of deficiencies shall be bindin~ upon the ~ ~ Authority to the extent that, once the deficiencies in the ` statement are satisfied, the official date of filing shall be ~ promptly estabiished as provided herein. Thereafter, within 15 days after the applicant indicates to the Authority that it believes that it has met the minimum filing requirements, the i Authority or ita designee shail either determine the officiai date of filing or issue another statement of deficiencies, - passages are deleted. Underiined passages are added. -27- BOOK~V~ PAGE t7~V