HomeMy WebLinkAbout0927 i
~
1
;
1 - .
~
~
~ .
, 4 -
~ ~ ,
the utility company. In a proceeding for an interim
de~rease, the term "last authorized rate of return
on equity" used in subparagraph b means the maximum
of the range of the last authorized rate of return
on equity established in the most recent rate case
of the utility.
;
~ (e) Nothing in this section shail be construed to prohibit
the Authority from authorizin~ interim rates for a utility which
does not have an suthorized rate of return reviously established
~ by the Authority.
~
~
~
SECTION 1-20.5-10. Determination of official date of ffling.
~
~ Withiri 30 days after receipt of an application, rate
~
~ request, or other written document for which an official. date of
;
filing is to be established, the Authority or its designee shall
either determine the afficial date of filinq or issue a statement
of deficiencies to the applicant, specifical2y listing why said.
applicant has faiZed to meet the minimum filinq requirements
= Such statement of deficiencies shall be bindin~ upon the
~
~ Authority to the extent that, once the deficiencies in the
` statement are satisfied, the official date of filing shall be
~ promptly estabiished as provided herein. Thereafter, within 15
days after the applicant indicates to the Authority that it
believes that it has met the minimum filing requirements, the
i
Authority or ita designee shail either determine the officiai
date of filing or issue another statement of deficiencies,
- passages are deleted. Underiined passages are
added. -27-
BOOK~V~ PAGE t7~V