Loading...
HomeMy WebLinkAbout12-035RESOLUTION NO. 12-035 A RESOLUTION DIRECTING THE PUBLIC WORKS DEPARTMENT TO IMPLEMENT THE BROCKSMITH ROAD MAINTENANCE IMPROVEMENT PROJECT WHEREAS, the Board of County Commissioners ofSt. Lucie County, Florida, has made the following determinations: 1. Brocksmith Road is a 3.3 mile long rural unimproved dirt/shellrock road located in western St. Lucie County. The County's Public Works Department is working to implement a maintenance improvement project to install an asphalt chip seal surface treatment on Brocksmith Road (the "Project"); and 2. The Project limits extend from Okeechobee Road (SR 70) to Orange Avenue (CR 68), a distance of approximately 3.3 miles. The County desires to improve the riding surface of Brocksmith Road by installing an asphalt chip seal surface treatment, along with safety features such as a guardrail, reflectors and signage. 3. The existing right-of-way of Brocksmith Road is substandard and will not accommodate an improved roadway that meets the current design standards of St. Lucie Land Development Code and the Florida Department of Transportation. 4. There are several physical conditions that are unique to Brocksmith Road that create difficulty with improvement of the roadway: a. There is a very deep canal (NSLRWCD Canal #53) that is adjacent to the west side of Brocksmith Road along its entire length. b. There are a large number of existing power poles along the east side of Brocksmith Road that cannot be easily relocated. c. The existing right-of-way is of insufficientwidthtoallowforplacementofguardrail barriers on both sides ofthe road, and also provide for standard travel lanes and shoulder widths that meet the County's land development code and design standards. d. Substandard lane widths and shoulders will be necessary if the road is to be improved within the existing right-of-way. Guardrails should be provided between the canal and the roadway to improve safety, but this will decrease the shoulder widths. e. Relocation of the existing power poles is not feasible without acquiring additional right-of-way or easements from the property owners. 5. The existing road conditions do not meet current design standards. -1- 6. Implementing the project will improve the existing conditions and make the Brocksmith Road safer for the traveling public. 7. The decision to implement the Project is a planning level decision initiated by the Board of County Commissioners and is intended to make Brocksmith Road safer for the traveling public. Florida: NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, 1. Based onthefindingssetoutabove,thePublicWorksDepartmentisdirectedtoimplement the Project including the installation of warning signs as appropriate. 2. This resolution shall take effect on adoption. After motion and second, the vote on this resolution was as follows: Chairman Chris Dzadovsky Vice Chairman Tod Mowery Commissioner Paula A. Lewis Commissioner Frannie Hutchinson Commissioner Chris Craft PASSED AND DULY AgA~'EB`'fihis„ day of ~: ~ , ~ ~, ,.~A ATTEST: ; ~i 4 ~+1 ` i! ~~ ~ D TY CLERK ~``, ';; ~a 1 ~~_ ~ ~ ~ V~ AYE AYE AYE AYE AYE 2012. BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA BY: G.- CH MA APPROVED AS TO LEGAL FORM AND CORRECT SS: i` ,' COUNTY A -2-