PDS 14-016
MNSP 1120134703
A A i
WHEREAS, the St. Lucie County Planning and Development Services Director has
reviewed the application for site plan approval and reviewed the comments of the St.
Lucie County Development Review Committee on this application, and made the
following determinations:
1. Savannas Preserve State Park petition includes the addition of a 3,039 square foot
building and support facilities to the existing Savannas Preserve State Park Education
Center located at 2541 Walton Road, approximately 1 mile east of US Highway 1, Port
St. Lucie, in St. Lucie County, Florida; more particularly described in Part B below.
2. On August 12, 2013, PDS Order 13-025 was granted to allow educational facilities
associated with agency approved management plans as a permitted use in the RM -5
(Residential, Multiple Family) Zoning District for the subject property.
3. The Development Review Committee has reviewed the site plan for the proposed
project and found it to meet technical requirements of the Land Development Code
and to be consistent with the St. Lucie County Comprehensive Plan.
4. The project will not have an undue adverse effect on adjacent property, the character
of the neighborhood, traffic conditions, parking, utility facilities, or other matters
affecting the public health, safety, and general welfare.
5. Pursuant to the provisions of Land Development Code Section 7.06.01.E the applicant
has requested administrative relief from the County's minimum width requirements for
parking aisles to allow the existing parking area to be resurfaced consistent with the
existing dimensions, one foot of relief is proposed.
6. Planning Staff has performed a detailed analysis of the project and determined it to
be consistent with the St. Lucie County Land Development Code and Comprehensive
Plan. The analysis is found in the Development Review Committee Final Report for
the Savannas Preserve State Park Minor Site Plan, dated April 14, 2014.
7. The applicant has applied for and received a Certificate of Capacity Exemption, a copy
of which is attached to this order, as required under Chapter V, St. Lucie County Land
Development Code.
December 2, 21114 File No.: MNSP 1120134703
Page 1 JOSEPH E SMITH c PDS Order 14-016
SAINT LU�IE COU,
CLERK OF THE CIRCUIT COURT
NTY
FILE # 4020909 12/10/2014
OR BOOK 3697 -t 09,23 AM
PAGE 1819 - 1823 D -
"'CORDING: $44.Oo Type: ORD
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
NOW, THEREFORE, BE IT ORDERED:
A. Pursuant to Section 11.02.03 of the St. Lucie County Land Development Code, the
proposed Minor Site Plan to be known as Savannas Preserve State Park, is hereby
approved as shown on the site plan drawings for the project prepared by American
Consulting Engineers of Florida, LLC., dated November 9, 2012 and revised through
the date stamped plans received by the St. Lucie County Planning and Development
Services Department on February 27, 2014, subject to the following conditions:
1. The applicant, successor or assign shall execute an agreement to pay a fee -
in -lieu of construction for the concrete sidewalk along Walton Road and remit
to the County the required funds within 90 days after receiving final site plan
approval. The acceptable method of payment shall be a certified check payable
to St. Lucie County.
2. Within 360 days after receiving final site plan approval, the applicant shall
convey the required road right of way easement for Walton Road. Manner and
form of conveyance shall be acceptable to the County Attorney. The sketch and
legal description shall be prepared by a Florida licensed surveyor and mapper.
Pursuant to Chapter 7.05.03 of the Set. Lucie County Land Development Code,
the applicant may be granted credits against road impact fees.
3. Prior to the issuance of any construction authorizations, the applicant shall
obtain written confirmation from the St. Lucie County Fire District, or otherwise
demonstrate by substantial creditable evidence, that water supply, evacuation
facilities and emergency access are satisfactory to provide adequate fire
protection.
4. The issuance of County development permit does not in any way create any
rights on the part of the applicant to obtain a permit from a state or federal
agency and does not create any liability on the part of the County if the applicant
fails to obtain requisite approvals or fulfill the obligations imposed by a state or
federal agency or undertakes actions that result in a violation of state or federal
law.
5. All other applicable state or federal permits must be obtained before
commencement of the development.
B. The property on which this Minor Site Plan approval is being granted is described as
follows:
December 2, 2014
Page 2
File No.: MNSP 1120134703
PDS Order 14-016
1 LEGAL DESCRIPTION — PARCEL ID#: 3414-501-3203-000/2
2
3 Lots A, B and C, Block 4, ST. LUCIE GARDENS, a Subdivision of part of
4 Section 31, Township 36 South, Range 41 East, as recorded in Plat Book
5 1, Page 35, St. Lucie County, Florida public records, LESS HOWEVER:
6 RIGHT OF WAY FOR WALTON ROAD, as recorded in St. Lucie County
7 Commissioner's Minute Book 4, Page 410, St. Lucie County, Florida, public
8 records.
9
10 SUBJECT TO right of way as set forth on Plat of St. Lucie Gardens, Plat
11 Book 1, Page 35, St. Lucie County, Florida public records; and Roadway
12 Construction Encroachment as shown on the survey for Ransom R. Tilton
13 by Weatherington Engineering/Surveying bearing the date of September
14 12, 1991, and last revised on July 7, 1992, File & Drawing #91-3-2218-01-
15 01.
16
17 C. The approvals granted by this administrative order shall expire on December 2, 2016,
18 unless an extension is granted in accordance with the provisions of Section 11.02.06
19 of the St. Lucie County Land Development Code.
20
21 D. The developer is advised as part of this site plan approval, including any successors
22 in interest, the developer shall obtain all necessary permits and construction
23 authorizations from the appropriate Local, State, and Federal regulatory agencies
24 including but not limited to the United States Army Corps of Engineers, the Florida
25 Department of Environmental Protection, the South Florida Water Management
26 District, and the St. Lucie County Environmental Resources and Building Departments
27 prior to the commencement of any development activities on the property described
28 in Part B. Issuance of this approval by the County does not in any way create any
29 rights on the part of the developer to obtain a permit from a state or federal agency
30 and does not create any liability on the part of the County for issuance of this permit if
31 the developer fails to obtain requisite approvals or fulfill the obligations imposed by a
32 state or federal agency or undertake actions that may result in a violation of state or
33 federal law.
34
35 E. This Order shall become effective upon the date of approval indicated below. Should
36 the property owner, developer or authorized agent wish to appeal any condition
37 described in Part A above, all such appeals must be filed in writing with the County
38 Administrator within 30 days of the rendering of this Order, as described in Section
39 11.02.03(B), St. Lucie County Land Development Code. Should an appeal to this
40 Order be filed, no permitting reviews or further administrative action shall take place
41 on the processing of this development project until the appeal is resolved.
42
December 2, 2014 File No.: MNSP 1120134703
Page 3 PDS Order 14-016
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
F. A copy of this Order shall be attached to the site plan drawings described in Part A,
which plan shall be placed on file with the St. Lucie County Planning and Development
Services Director and mailed, return receipt requested to the developer and agent of
record as identified on the site plan applications.
G. The conditions set forth in Part A are an integral nonseverable part of the site plan
approval granted by this Order. If any condition set forth in Section A is determined
to be invalid or unenforceable for any reason and the developer declines to comply
voluntarily with that condition, the site plan approval granted by this order shall
become null and void.
H. The Certificate of Capacity shall be valid for the same period as this order. If this order
expires or otherwise terminates, the Certificate of Capacity shall automatically
terminate.
1. This order shall be recorded in the Public Records of St. Lucie County.
ORDER effective the 2nd Day of December 2, 2014.
December 2, 2014
Page 4
PLANNING AND DEVELOPMENT SERVICES
DIRECTOR
/.. ,�1
ST. LUCIE GdUNTY FLO
BY
Mrrk Satt(�rleeN---"
M -
W W -l"?, � WN
County Attorney
St Lucie County
Certificate of Capacity Exemption
Date 11/19/2014
Certificate No. 5519
This document certifies that concurrency will be met and that adequate public facility
capacity exists to maintain the standards for levels of service as adopted in the St
Lucie County Comprehensive Plan for:
1. Type of development Minor Site Plan PDS 14-016
Number of units
Number of square feet 3039
2. Property legal description & Tax ID no.
3414-501-3203-0002
2541 SE Walton Road
Savannas Preserve State Park
3. Approval: Buildinq
4. As part of the development:
5. On property owned by
St. Lucie Gardens
Resolution No. PDS 14-016 Letter
Board of Trustees of the Internal Improvement Trust Fund of the State of Florida
3900 Commonwealth Blvd., MS 525
Tallahassee FL 32399
is hereby granted a Certificate of Capacity Exemption according to the following Chapter(s) of the St. Lucie County
Land Development Code: 5.03.02(A) 1-1 5.03.02(B)1 5.03.02(B)2 F -15.03.02(B)3 [1 5.03.02(13)4
E'' 5.03.02(B)5 U 5.03.02(B)6 L] 5.03.04(A) 5.03.04(A)2 L' 5.03.04(A)3
5.03.04(B)1 ❑ 5.03.04(B)2 5.03.04(B)3 ❑ 5.03.04(B)4
6. Certificate Expiration Date 12/2/2016
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel, and is subject to the same terms, conditions and expiration date listed herein.
The expiration date can be extended only under the same terms and conditions as the
underlying devel pment orderissued with this certificate, or for subsequent
develop79=
ame property, use and size as described herein.
Signed Date: 11/19/2014
Planning and Development Services Director