HomeMy WebLinkAbout15-186 RESOLUTION 2015-186
File Number: SPMJ 520154868
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUC o
COUNTY FOR MAJOR ADJUSTMENT TO FINAL PLANNED UNIT DEVELOPMEI Ot o
(PUD) SITE PLAN KNOWN AS HARBOUR RIDGE YACHT AND COUNTRY CLt
PUD IN ST. LUCIE COUNTY. a
W F
H �
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, bas, o c
on the testimony and evidence, including but not limited to the staff report, has ma( 11
the following determinations: W N
z-W
�Ooac
1. Harbor Ridge Country Club, Inc. presented a petition for a Major Adjustment 2 Q;a
Final Planned Unit Development (PUD) Site Plan known as Harbour Rid( W t�i z
Yacht and Country Club PUD located at 13400 Gilson Road, as depicted on tt Wo
attached map as Exhibit "A" and described in Part "A" below. The subject +/- g N�o W
acre property is zoned PUD, Planned Unit Development and has a future lar
use designation of RE (Residential, Estate — 1 du/acre).
The Site Plan Adjustment results in the removal of the existing buildings that
total approximately 8,200 s.f. and four (4) existing tennis courts on the subject
property, the construction of a 18,566 s.f. LifeStyle Center, a 1,290 s.f. real
estate office, a 900 s.f. maintenance building, a gazebo and a new outdoor
swimming pool.
2. On January 12, 1982, the Board of County Commissioners adopted Resolution
No. 82-6 authorizing a zoning change from AR-1 (Agricultural, Residential — 1)
to PUD (Planned Unit Development) for approximately 885 acres.
3. On December 21, 1982, the Board of County Commissioners adopted
Resolution No. 82-174 authorizing a Development of Regional Impact (DRI) for
Harbour Ridge Yacht and Country Club consisting of 814 dwelling units and
associated recreational amenities.
4. The Land Development Coordinator granted an Administrative Site Plan
Adjustment approval for a building addition to the Tennis Center.
5. The St. Lucie County Development Review Committee has reviewed the
petition for a Major Adjustment to Final PUD Site Plan for the project and found
it to meet all technical requirements and to be consistent with the Future Land
Use Map of the St. Lucie County Comprehensive Plan, subject to the conditions
set forth in Part A of this Resolution.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St.
Lucie County, Florida:
October 6, 2015 Resolution No. 2015-186
File No.: SPMJ 520154868 Page 1
A. Pursuant to Land Development Code, Section 11.02.05, the Major Adjustment to
Final PUD Site Plan known as Harbour Ridge Yacht and Country Club PUD is
hereby approved as shown on the site plan drawings for the project prepared by
Lucido and Associates, dated July 20, 2015, 2015 and date stamped received by
the Planning and Development Services Department, Planning Division on
October 14, 2015 subject to the following conditions:
1. Within 90 days after receiving site plan approval, the applicant shall execute an
agreement to pay a fee-in-lieu of construction for sidewalks and remit to the
County the required funds. The acceptable method of payment shall be a
certified check payable to St. Lucie County.
2. Tennis court lighting shall not exceed a maximum height of 25 feet and
footcandle readings shall not exceed a reading of 0.01 at all property lines.
3. Prior to issuance of a vegetation removal permit or exemption a detailed root
pruning plan shall be submitted and approved by the Environmental Resources
Department. Root pruning shall occur a minimum of three months prior to any
construction activities within the affected area.
4. The issuance of County development permit does not in any way create any
rights on the part of the applicant to obtain a permit from a state or federal
agency and does not create any liability on the part of the County if the applicant
fails to obtain requisite approvals or fulfill the obligations imposed by a state or
federal agency or undertakes actions that result in a violation of state or federal
law.
5. All other applicable state or federal permits must be obtained before
commencement of the development.
B. The property on which the Major Adjustment to Final PUD Site Plan is being granted
is shown on a map in Exhibit "A" and described as follows:
TRACT TC-1, HARBOUR RIDGE, PLAT NO. 2, AS RECORDED IN PLAT BOOK
24, PAGES 5, 5A THROUGH 5E, PUBLIC RECORDS OF S. LUCIE COUNTY,
FLORIDA.
Parcel Identification Number: 4425-701-0016-000-4
C. The approvals and authorizations granted by this Resolution expire on October 6,
2017 unless a building permit is secured or a site plan extension is granted in
accordance with Section 11.02.06(B)(2), St. Lucie County Land Development Code.
D. The property owner, including any successors in interest, shall obtain all applicable
development permits and construction authorizations from the appropriate State and
Federal and local regulatory agencies including, but not limited to, the United States
October 6, 2015 Resolution No. 2015-186
File No.: SPMJ 520154868 Page 2
Army Corps of Engineers, the Florida Department of Environmental Protection,
Florida Department of Transportation, South Florida Water Management District,
and the St. Lucie County Environmental Resources and Building Departments prior
to the commencement of any development activities on the property described in
Part B. Issuance of this permit by the County does not in any way create any rights
on the part of the developer to obtain a permit from a state or federal agency and
does not create any liability on the part of the County for issuance of this permit if
the developer fails to obtain requisite approvals or fulfill the obligations imposed by a
state or federal agency or undertake actions that may result in a violation of state or
federal law.
E. The conditions set forth in Part A are an integral non-severable part of the site plan
approval granted by this Resolution. If any condition set forth in Part A is
determined to be invalid or unenforceable for any reason and the developer declines
to comply voluntarily with that condition, the site plan approval granted by this
resolution shall become null and void.
F. A recorded copy of this Resolution shall be attached to the site plan drawings
described in Part A, which plan shall be placed on file with the St. Lucie County
Planning & Development Services Department Director.
October 6, 2015 Resolution No. 2015-186
File No.: SPMJ 520154868 Page 3
,
G. ADOPTION
After motion and second, the vote on this resolution was as follows:
Paula A. Lewis, Chair AYE
Kim Johnson, Vice Chair AYE
Frannie Hutchinson, Commissioner AYE
Chris Dzadovsky, Commissioner AYE
Tod Mowery, Commissioner ABSENT
PASSED AND DULY ADOPTED this 6th day of October, 2015.
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY
Chafr
ATTEST: APPROVED AS TO FORM AND
CORRECTNESS:
,,a4
(�
EPU COU TY ATT O N
;rod
a
October 6, 2015 Resolution No. 2015-186
File No.: SPMJ 520154868 Page 4
EXHIBIT "A"
LOCATION MAP
J
Harbour Ridge Lifestyle Center
SPMJ 520154868
I {—
d
i.
i f /J . }
r
Subject Property \�\
z % F64 Pierce city 4,mds
, f
j X
y d
t
county boandar}
_ wn .r
October 6, 2015 Resolution No. 2015-186
File No.: SPMJ 520154868 Page 5