HomeMy WebLinkAboutPDS-17-020 - Orange Ave Baptist Church Adj.to Minor Site PlanPDS NO. 17-020
File No. SPMN 120175103
AN ORDER GRANTING A MINOR ADJUSTMENT TO THE
MINOR SITE PLAN FOR ORANGE AVENUE BAPTIST CHURCH
WHEREAS, the St. Lucie County Planning and Development Services Director has reviewed the
request for a Minor Adjustment to the Minor Site. Plan known as Orange Avenue Baptist Church
and reviewed the comments of the Development Review Committee and has made the
following determinations:
1. Orange Avenue Baptist Church requested a Minor Adjustment to the Minor Site Plan for
Orange Avenue Baptist Church Site Plan to construct a 10,000 s.f. covered playground
on an approximately 4.54 acre property located at 100 Cyclone Drive in the I
(Institutional) zoning district, more particularly described in Part B below.
2. On June 14, 1988, the St. Lucie County Planning and Development Services Director,
through staff delegation, approved a Major Adjustment to the Orange Avenue Baptist
Church Site Plan for the purpose to construct a 3,840 s.f. addition to the fellowship hall.
3. On June 9, 1989, the St. Lucie Planning and Development Services Director, through
staff delegation, approved a Minor Adjustment to the Orange Avenue Baptist Site Plan
for the purpose to re -locate a pre -constructed temporary classroom located north of
the fellowship hall.
4. St. Lucie County Planning Staff has performed a detailed analysis of the proposed Minor
Adjustment and determined it to be consistent with the St. Lucie County Land
Development Code, Comprehensive Plan and with the intent of the previously approved
Site Plan for Orange Avenue Baptist Church. The analysis is found in the Planning and
Development Services memorandum titled Orange Avenue Baptist Church — Minor
Adjustment to Minor Site Plan, dated May 1, 2017.
5. The project will not have an undue adverse impact on adjacent property, the character
of the neighborhood, traffic conditions, parking, utility facilities, or other matters
affecting the public health, safety, and general welfare.
JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT
SAINT LUCIE COUNTY
FILE # 4308597 05/15/2017 10:46:48 AM
OR BOOK 3996 PAGE 960 - 963 Doc Type: ORD
File No. SPMN 120175103 RECORDING: $35.50 PDS 17-020
May 3, 2017 Page 1 of 4
r
6. All reasonable steps have been taken to minimize any adverse effect of the proposed
project on the immediate surroundings through building design, site design,
landscaping and screening.
NOW, THEREFORE, BE IT ORDERED by the Planning and Development Services Director of St.
Lucie County, Florida:
A. Pursuant to Section 11.02.04(C) of the St. Lucie County Land Development Code, the
Minor Adjustment is hereby approved as shown on the drawing prepared by David
Norris Engineering, dated April 25, 2017, and date stamped by the Planning and
Development Services Department on May 1, 2017 subject to the following
condition(s):
Planning and Development Services — Planning Division
1. The property owner shall comply at all times with the St. Lucie County Code of
Ordinances, Section 28-107 through 28-112, as amended regulating noise.
2. Any exterior lighting that is provided for the covered playground area shall be
shielded with zero (0) footcandle readings at adjacent property lines.
3. The covered playground area shall remain unenclosed with no walls. If it is the
desire of the property owner to enclose the structure, site plan adjustment
approval shall be obtained prior to any construction to evaluate the use of the
proposed enclosed structure, the need for additional on-site parking, and
compliance with community architectural standards.
Environmental Resources Department
4. Prior to issuance of a Certificate of Occupancy, the applicant shall replace all
removed or damaged landscape material per the approved landscape plan.
5. The issuance of County development permit does not in any way create any rights
on the part of the applicant to obtain a permit from a state or federal agency and
does not create any liability on the part of the County if the applicant fails to obtain
requisite approvals or fulfill the obligations imposed by a state or federal agency
or undertakes actions that result in a violation of state or federal law.
6. All other applicable state or federal permits must be obtained before
commencement of the development.
File No. SPMN 120175103
May 3, 2017
PDS 17-020
Page 2 of 4
Public Works Department — Engineering Division
7. Prior to the issuance of a building permit for the 10,000 s.f. covered playground
structure, a sketch and description shall prepared by a surveyor licensed in the
State of Florida for the 30' right of way dedication fronting Orange Avenue as
required per the Right of Way Protection Plan. Said dedication shall be reviewed
and approved by the St. Lucie County Attorney's Office and the Board of County
Commissioners.
8. Prior to the issuance of a building permit for the 10,000 s.f. covered playground
structure, a License Agreement will need to be entered into between Orange
Avenue Baptist Church and St. Lucie County and approved by the Board of County
Commissioners for the existing monument sign and parking stall located along the
frontage of Orange Avenue. Please contact the Legal Department, Property
Acquisitions Division for further information.
B. Legal Description:
The property affected by this Minor Adjustment is described as follows:
The South % of the East % of the West % of the Southwest % of the Northeast 1/4 ,
Section 8, Township 35 South, Range 39 East; excepting all rights-of-way for drainage
canals and public roads (4.54 acres).
Address Location:
100 Cyclone Drive
C. The applicant, property owner, their successors and assigns, are advised that as part of
the approval of this Minor Adjustment to the Orange Avenue Baptist Church Minor Site
Plan, the applicant, property owner, their successors and assigns, shall obtain all
applicable development permits and construction authorizations from the appropriate
State, Federal and local regulatory agencies including, but not limited to, the United
States Army Corps of Engineers, the Florida Department of Environmental Protection,
South Florida Water Management District, and St. Lucie County, prior to the
commencement of any development activities on the property described in Part B
applicable to the proposed activity for which site construction or development
authorization is sought. Issuance of this Minor Adjustment approval by St. Lucie County
does not in any way create any rights on the part of the applicant, property owner, their
successors and assigns to obtain a permit from a state or federal agency and does not
create any liability on the part of the County through issuance of this Minor Adjustment
approval to obtain local development permit(s) if the applicant, property owner, their
File No. SPMN 120175103 PDS 17-020
May 3, 2017 Page 3 of 4
successors and assigns, fail to obtain requisite approvals or fulfill the obligations
imposed by a state or federal agency or undertake actions that may result in a violation
of state or federal law.
D. This Order shall become effective upon the date of approval indicated below and shall
expire on May 3, 2018, unless a building permit is issued or an extension is granted in
accordance with the provisions of Land Development Code, Section 11.02.06.
E. Should the property owner, developer or authorized agent wish to appeal any condition
described in Part A above, all such appeals must be filed in writing with the County
Administrator within 30 days of the rendering of this Order, as described in Section
11.02.05(D), St. Lucie County Land Development Code. Should an appeal to this Order
be filed, no permitting reviews or further administrative action shall take place on the
processing of any action or activity authorized through this Minor Adjustment until the
appeal is resolved.
F. A copy of this Order, or printed reference to it, shall be attached to the site plan
drawings described in Part A, which plan shall be placed on file with the St. Lucie
Planning and Development Services Director a copy of which shall be provided to the
developer and agent of record as identified on the Minor Adjustment application.
G. This order shall be recorded in the Public Records of St. Lucie County.
ORDER effective the 3rd day of May, 2017.
PLANNING & DEVELOPMENT SERVICES
ST. LUCIE COUNTY, FLORIDA
By:'otsd
r1
Leslie Olson, AICP, Director
APPROVED AS TO FORM AND CORRECTNESS
By:
COL
File No. SPMN 120175103 PDS 17-020
May 3, 2017 Page 4 of 4