HomeMy WebLinkAboutPDS-18-003 - American Concrete IndustriesPDS Order 2018-003
SPMJ 920175195
AN ORDER GRANTING APPROVAL FOR A MAJOR ADJUSTMENT
TO A MINOR SITE PLAN PROJECT KNOWN AS AMERICAN
CONCRETE INDUSTRIES.
WHEREAS, the St. Lucie County Planning and Development Services Director has reviewed the
request for a site plan adjustment submitted by Velcon Engineering & Surveying, LLC, reviewed the
comments of the St. Lucie County Development Review Committee on this application, and made
the following determinations:
A. Robert L. Snowe requested a Major Adjustment to a Minor Site Plan known as American
Concrete Industries for a 10,000 square foot addition to the existing 28,370 square foot
manufacturing facility located 350 N. Rock Road in the IH (Industrial, Heavy) Zoning District for
the property described in Part B below.
B. On November 15, 1995, the Community Development Director approved CD Order 95-017
granting site plan approval for a project known as American Concrete Industries.
C. On May 1, 2001, the Board of County Commissioners approved Resolution 01-023 granting a
Major Adjustment to the American Concrete Industries site plan.
D. On January 9, 2018, the Planning and Development Services Director approved PDS Order 17-
057 granting a use determination for the manufacturing of concrete products.
E. The Development Review Committee has reviewed the proposed site plan for the project and
found, with the proposed conditions, it meets the technical requirements of the St. Lucie
County Land Development Code and has satisfied the standards of review set forth in Section
11.02.07, Standards for Site Plan Review, of the Land Development Code.
F. The project will not have an undue adverse effect on adjacent property, the character of the
neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public
health, safety, and general welfare.
G. All reasonable steps have been taken to minimize any adverse effects of the proposed project
on the immediate vicinity through building design, site design, landscaping and screening.
January 16, 2018SPMJ 920175195
JQSEPH E. SMITH, CLERK OF THE CIRCUIT COURT
PDS Order 18-003 SAINT LUCIE COUNTY Page 1
FILE # 4392681 01/22/2018 10'09:50 AM
DR BOOK 4088 PAGE 2718 - 2722 Doc Type: ORD
RECORDING: $44.00
H. The project is designed, constructed and operated so as not to interfere with the development
and use of neighboring property, in accordance with applicable district regulations.
I. Planning Staff has performed a detailed analysis of the project and determined it to be
consistent with the St. Lucie County Land Development Code and Comprehensive Plan. The
analysis is found in the Planning and Development Services Department memorandum titled
American concrete industries — Major Adjustment to Minor Site Plan, dated January 9, 2018,
NOW, THEREFORE, BE IT ORDERED:
A. Pursuant to Section 11.02.03 of the St. Lucie County Land Development Code, the proposed
Major Adjustment to the Minor Site Plan project known as American Concrete Industries, is
hereby approved as shown on the site plan drawings for the project prepared by Velcon
Engineering & Surveying, LLC as revised on October 5, 2017 and date stamped received bythe
St. Lucie County Planning Division on November 6, 2017, subject to the following conditions:
1. Within 90 days of site plan approval all invasive exotic vegetation located within the
property boundary shall be removed [Land Development Code Section 7.09.05].
2. Prior to the issuance of a Certificate of Occupancy, the onsite landscaping shall be in
compliance with the approved landscape plan, dated 05/01/2001.
3. All other applicable state or federal permits must be obtained before commencement of
the development.
4. Construction plans shall be submitted to the Engineering Division for review and approval
prior to construction authorization. Additional comments may be provided from the
review of construction plans.
B. The property on which this Major Adjustment to a Minor Site Plan approval is being granted is
described as follows:
LEGAL DESCRIPTION:
BEGINNING AT A CONCRETE MONUMENT AT THE SOUTHEAST CORNER OF THE NORTHWEST 1/4
OF THE NORTHEAST 1/4 OF SECTION 11 TOWNSHIP 35 SOUTH, RANGE 39 EAST, ST. LUCIE COUNTY,
FLORIDA; THENCE RUN S89°49'03"W, ALONG THE SOUTH LINE OF THE SAID NORTHWEST 1/4 OF
THE NORTHEAST 1/4, A DISTANCE OF 1368.32 FEET, TO A CONCRETE MONUMENT ON THE EAST
RIGHT OF WAY OF ROCK ROAD AND BEING 25 FEET EAST OF THE WEST LINE OF THE SAID
NORTHWEST 1/4 OF THE NORTHEAST 1/4; THENCE RUN N00°07'28"W, ALONG THE SAID EAST
January 16, 2018
PDS Order 18-003
SPM! 920175195
Page 2
RIGHT OF WAY, A DISTANCE OF 315.74 FEET, TO A CONCRETE MONUMENT; THENCE RUN
N89°36'20"E, A DISTANCE OF 1369.00 FEET, TO A CONCRETE MONUMENT TO THE EAST LINE OF
THE SAID NORTHWEST 1/4 OF THE NORTHEAST 1/4; THENCE RUN 500'00'17"E, ALONG THE EAST
LINE OF THE SAID NORTHWEST 1/4 OF THE NORTHEAST 1/4, TO THE POINT OF BEGINNING, ALL
LYING AND BEING IN SECTION 11, TOWNSHIP 35 SOUTH, RANGE 39 EAST, ST. LUCIE COUNTY,
FLORIDA, AND CONTAINING 10.00 ACRES, MORE OR LESS.
TOGETHER WITH A NONEXCLUSIVE EASEMENT FOR DRAINAGE PURPOSES ACROSS THE EAST 20
FEET OF THE FOLLOWING REAL DESCRIBED PROPERTY:
THE NORTHWEST 1/4 OF THE NORTHEAST 1/4 OF SECTION 11, TOWNSHIP 35 SOUTH, RANGE 39
EAST, EXCEPTING THEREFROM ALL RIGHTS OF WAY FOR DRAINAGE CANALS AND PUBLIC ROADS,
AND LESS AND EXCEPTING THEREFROM THE FOLLOWING DESCRIBED PROPERTY:
BEGINNING AT A CONCRETE MONUMENT ATTHE SOUTHEAST CORNER OF THE NORTHWEST 1/4
OF THE NORTHEAST 1/4 OF SECTION 11 TOWNSHIP 35 SOUTH, RANGE 39 EAST, ST. LUCIE COUNTY,
FLORIDA; THENCE RUN S89°49'03"W, ALONG THE SOUTH LINE OF THE SAID NORTHWEST 1/4 OF
THE NORTHEAST 1/4, A DISTANCE OF 1368.32 FEET, TO A CONCRETE MONUMENT ON THE EAST
RIGHT OF WAY OF ROCK ROAD AND BEING 25 FEET EAST OF THE WEST LINE OF THE SAID
NORTHWEST 1/4 OF THE NORTHEAST 1/4; THENCE RUN NOOp07'28"W, ALONG THE SAID EAST
RIGHT OF WAY, A DISTANCE OF 315.74 FEET, TO A CONCRETE MONUMENT; THENCE RUN
N89°36'20"E, A DISTANCE OF 1369.00 FEET, TO A CONCRETE MONUMENT TO THE EAST LINE OF
THE SAID NORTHWEST 1/4 OF THE NORTHEAST 1/4; THENCE RUN S00°00'17"E, ALONG THE EAST
LINE OF THE SAID NORTHWEST 1/4 OF THE NORTHEAST 1/4, TO THE POINT OF BEGINNING, ALL
LYING AND BEING IN SECTION 11, TOWNSHIP 35 SOUTH, RANGE 39 EAST, ST. LUCIE COUNTY,
FLORIDA, AND CONTAINING 10.00 ACRES, MORE OR LESS.
Address: 350 N. Rock Road, Fort Pierce
Tax ID#: 2311-123-0001-000-6
C. The approvals granted by this administrative order shall expire on January 16, 2020 unless
building permits are issued or an extension is granted in accordance with the provisions of
Section 11.02.06 of the St. Lucie County Land Development Code.
D. The conditions set forth in Part A are an integral nonseverable part of the site plan approval
granted by this Order. If any condition set forth in Section A is determined to be invalid or
unenforceable for any reason and the developer declines to comply voluntarily with that
condition, the site plan approval granted by this order shall become null and void.
January 16, 2018 SPMJ 920175195
PDS Order 18-003 Page 3
The developer is advised as part of this major adjustment approval for American Concrete
Industries, including any successors in interest, the developer shall obtain all applicable
development permits and construction authorizations from the appropriate state and federal
and local regulatory agencies including, but not limited to, the United States Army Corps of
Engineers, the Florida Department of Environmental Protection, and South Florida Water
Management District, and the St. Lucie County Environmental Resources and Building
Departments prior to the commencement of any development activities on the property
described in Part B. Issuance of this permit by the County does not in any way create any
rights on the part of the developer to obtain a permit from a state or federal agency and does
not create any liability on the part of the County for issuance of this permit if the developer
fails to obtain requisite approvals or fulfill the obligations imposed by a state orfederal agency
or undertake actions that may result in a violation of state or federal law.
This Order shall become effective upon the date of approval indicated below. Should the
property owner, developer or authorized agent wish to appeal any condition described in Part
A above, all such appeals must be filed in writing with the County Administrator within 30 days
of the rendering of this Order, as described in Section 11.02.03(B), St. Lucie County Land
Development Code. Should an appeal to this Order be filed, no permitting reviews or further
administrative action shall take place on the processing of this development project until the
appeal is resolved.
G. A copy of this Order shall be attached to the site plan drawings described in Part A, which plan
shall be placed on file with the St. Lucie Planning and Development Services Director and
mailed, return receipt requested to the developer and agent of record as identified on the site
plan applications.
H. This order shall be recorded in the Public Records of St. Lucie County.
January 16, 2018
PDS Order 18-003
SPMJ 920175195
Page 4
ORDER effective the 1611 Day of January, 2018,
PLANNING AND DEVELOPMENT
SERVICES DIRECTOR
ST. LUCIE COUNTY, FLORIDA
BY
Leslie OlsorA AICP
APPROVED AS TO FORM
AND CORRECTNESS:
BY
January 16, 2018
PDS Order 18-003
County Attorney
SPMJ 920175195
Page 5