Loading...
HomeMy WebLinkAbout19-095Resolution 2019-95 File Number: SPMj 2201915473 A RESOLUTION OF THE ST. LUCIE COUNTY BOARD OF COUNTY COMMISSIONERS GRANTING A MAJOR ADJUSTMENT TO THE PREVIOUSLY APPROVED MAJOR SITE PLAN FOR THE PROJECT KNOWN AS DBV1 DELIVERY STATION. WHEREAS, the St. Lucie County Board of County Commissioners has reviewed the request for a Major Adjustment to the Major Site Plan for DBV1 Delivery Station and reviewed the comments of the Development Review Committee and has made the following determinations: Josh Manion, Progressive Architecture Engineering, PC, on behalf of DVB1 Delivery Station, presented a petition for a Major Adjustment to the Major Site Plan known as DVB1 Delivery Station, to allow for a delivery station with pre -packaged boxes that incorporates removal of existing pavement and concrete to change the vehicle circulation, relocation of the dumpster enclosure, restriping of parking areas and the addition of parking and loading spaces. The subject property is located at 7440 Commercial Circle, Fort Pierce as described in Part B below. 2. On July 23, 1998, the Board of County Commissioners approved Resolution 98-134 granting major site plan approval for a 91,650 square foot manufacturing facility to be built in 3 phases on 5.5 acres of land in the Kings Highway Industrial Park. Phase I consists of 54,990 square feet of space, Phase 2, consists of 20,085 square feet, and Phase 3 consists of 16,575 square feet of space for the project known as Bee Electronics. 3. On November 16, 1998, the Planning and Development Services Director approved a Minor Adjustment to the Major Site Plan to reduce the overall size of the proposed building from 91,650 square feet to 90,503 square foot and to reconfigure parking spaces. 4. On October 7, 1999, the Planning and Development Services Director approved CD-010 to indicate the area of Phase I parking being deferred until Phase II construction. 5. The Development Review Committee has reviewed the proposed site plan for the project and found it meets the technical requirements of the St. Lucie County Land Development Code and has satisfied the standards of review set forth in Section 11.02.07, Standards for Site Plan Review, of the St. Lucie County Land Development Code. 6. Planning Staff has performed a detailed analysis of the project and determined it to be consistent with the St. Lucie County Land Development Code and Comprehensive Plan. The analysis is found in the Planning and Development Services Department memorandum titled DVBI Delivery Station — Major Adjustment to Major Site Plan, dated March 29, 2019. 7. The project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities, or other matters affecting the public health, safety, and general welfare. Resolution No. 2019-95 File No.: SPMJ 2201915473 Page 1 IOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE # 4579043 06/10/2019 01:0025 PM DR BOOK 4281 PAGE 322 - 327 Doc Type: RESO RECORDING: $52.50 8. All reasonable steps have been taken to minimize any adverse effects of the proposed project on the immediate vicinity through building design, site design, landscaping and screening. NOW, THEREFORE, BE IT ORDERED: A. Pursuant to Section 11.02.04 (C) of the St. Lucie County Land Development Code, the Major Adjustment is hereby approved as shown on the site plan drawings prepared by Progressive Architecture Engineering, PC date stamped by the St. Lucie County Planning Division on April 1, 2019, subject to the following conditions: 1. Prior to issuance of Certificate of Occupancy all Category I listed invasive species shall be eradicated from the site. B. The property on which this Major Adjustment to the Major Site Plan is being granted is described as follows: LEGAL DESCRIPTION: DESCRIBED PROPERTY: LOTS 23, 24, 25, 26, 27, 28, 29, AND 30, BLOCK A, KINGS HIGHWAY INDUSTRIAL PARK UNIT 2, ACCORDING TO THE MAP OR PLAT THEREOF AS RECORDED IN PLAT BOOK 32, PAGE 5 AND 5A, PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA Parcel Identification Number: 1335-802-0008-000-0 Address: 7440 Commercial Circle, Fort Pierce, FL 34951 C. This Order shall become effective upon the date of approval indicated below. Should the property owner, developer or authorized agent wish to appeal any condition described in Part A above, all such appeals must be filed in writing with the County Administrator within 30 days of the rendering of this Order, as described in Section 11.02.03(B), St. Lucie County Land Development Code. Should an appeal to this Order be filed, no permitting reviews or further administrative action shall take place on the processing of this development project until the appeal is resolved. D. This Major Adjustment for DVB1 Delivery Station Major Site Plan shall expire within twenty four (24) months of the effective date of this order unless a building permit is issued or an extension is granted in accordance with the provision of Land Development Code Section 11.02.06. E. The developer is advised as part of this major adjustment approval for DVB1 Delivery Station, including any successors in interest, the developer shall obtain all applicable development permits and construction authorizations from the appropriate state and federal and local regulatory agencies including, but not limited to, the United States Army Corps of Engineers, the Florida Department of Environmental Protection, and South Florida Water Management District, and the St. Lucie County Environmental Resources and Building Departments prior to the Resolution No. 2019-95 File No.: SPMJ 2201915473 Page 2 commencement of any development activities on the property described in Part B. Issuance of this permit by the County does not in any way create any rights on the part of the developer to obtain a permit from a state or federal agency and does not create any liability on the part of the County for issuance of this permit if the developer fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertake actions that may result in a violation of state or federal law. F. A copy of this Order shall be attached to the site plan drawings described in Part A, which plan shall be placed on file with the St. Lucie County Planning and Development Services Director and mailed, return receipt requested to the developer and agent of record as identified on the site plan applications. G. The conditions set forth in Part A are an integral nonseverable part of the site plan approval granted by this Order. If any condition set forth in Section A is determined to be invalid or unenforceable for any reason and the developer declines to comply voluntarily with that condition, the site plan approval granted by this order shall become null and void. H. This order shall be recorded in the Public Records of St. Lucie County. After motion and second, the vote on this resolution was as follows: Chair Linda Bartz AYE Vice -Chair Cathy Townsend AYE Commissioner Chris Dzadovsky AYE Commissioner Sean Mitchell AYE Commissioner Frannie Hutchinson AYE Resolution No. 2019-95 File No.: SPMJ 2201915473 Page 3 PASSED AND DULY ADOPTED this 7tn day of May, 2019. BOARD OF COUNTY COMMISSIONERS COMST. LUCIE COUNTY, FLORIDA m BY � o <��, co V, ,CHAIR F0001v FiA�� ATTEST: APPROVED AS TO FORM AND CORRECTNESS: DEPUTY ClttI COUNTY ATTORN Resolution No. 2019-95 File No.: SPMJ 2201915473 Page 4 EXHIBIT "A" APPROVED SITE PLAN Resolution No. 2019-95 File No.: SPMJ 2201915473 Page 5 X Iit `•. 1. � w1 s1� i i I P fA 1l"""..� � r ■ �I 1f 1 t a a a m+ _ k ° e 1 I s. I;�j,kh. EEiiY STATION - mH Resolution No. 2019-95 File No.: SPMJ 2201915473 1,1 311- progrps�ivp�e Page 6