Loading...
HomeMy WebLinkAbout19-281RESOLUTION 19-281 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA, SUPPORTING THE ADDITION OF EASY STREET AT US-1 IMPROVEMENT PROJECT TO THE TRANSPORTATION PLANNING ORGANIZATION LIST OF PRIORITY PROJECTS IN ST. LUCIE COUNTY, FLORIDA WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made the following determinations: 1. Easy Street is a County owned road. 2. St. Lucie County, as the owner of Easy Street, is committed to the operation and maintenance of Easy Street. 3. St. Lucie County supports adding Easy Street at US-1 improvements to the Transportation Planning Organization (TPO) list of priority projects. A congestion mitigation strategy to improve the east leg of the intersection of Easy Street and US-1 was developed. 4. A bulb -out, raised median on the approach can be confusing to drivers and causes congestion. It is recommended that the east leg be improved within the existing right- of-way to provide a narrow, consistent -width median with three lanes westbound and two lanes eastbound merging into the existing East Street roadway. 5. The sidewalks should be extended east from US-1 along both sides of Easy Street to the terminus of the merge to connect with sidewalks planned to be constructed by St. Lucie County. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida: 1. The Board does hereby proclaim its support of the addition of Easy Street at US-1 improvements to the Transportation Planning Organization list of priority projects. 2. This Resolution shall become effective immediately upon adoption. 3. The County Administration is directed to send a copy of this resolution to the Transportation Planning Organization. PASSED AND DULY ADOPTED this 3rd day of December 2019. ATTEST: Deputy Clerk BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA BY: Chair APPROV-kD A O FORM AND CORRECT ESQ: ,, %/' Page 1 of 1 County CMP Project Description Easy Street at US-1 (Unincorporated St. Lucie County) The level of service for the Easy Street corridor from US-1 to Yucca Drive was reported as failing in year 2015 and 2017. With coordination of the maintaining agency, St. Lucie County, a congestion mitigation strategy to improve the east leg of the intersection of Easy Street and US Highway 1 was developed. Currently, there is a bulb -out, raised median on this approach which can be confusing to drivers and causes congestion. Additionally the existing break in the median creates an unsafe, nonstandard condition which contributes to congestion and inhibits driver expectations. An aerial photograph of the existing intersection is provided in Figure 1. It is recommended that the east leg be improved within the existing right-of-way to provide a raised concrete median with two lanes westbound (a left turn lane and a thru/right turn lane) and one lane eastbound. The sidewalks should be extended east from US-1 along both sides of Easy Street to the terminus of the merge to connect with sidewalks planned to be constructed by St. Lucie County. A preliminary sketch of the congestion mitigation strategy is depicted in Figure 2. The images below show the intersection of Easy Street and US1 looking West: And looking East: Figure 1: Existing Easy St and US 1 Intersection Figure 2: Congestion Mitigation Strategy t V