HomeMy WebLinkAbout20-044Resolution No. 2020-044
File No.: MJSP5201915523
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST.
LUCIE COUNTY GRANTING A MAJOR SITE PLAN CONSISTING OF 82
RESIDENTIAL UNITS FOR A PROJECT TO BE KNOWN AS ST. LUCIE
GARDENS APARTMENTS ON A +/- 9.71-ACRE PROPERTY LOCATED IN ST.
LUCIE COUNTY, FLORIDA.
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the
testimony and evidence, including but not limited to the staff report, has made the following
determinations:
1. St. Lucie Gardens Apartments, LLC presented a petition for a Major Site Plan to be
known as St. Lucie Gardens Apartments consisting of 81 residential dwelling units on
9.71 acres with amenities (swimming pool, office, mail kiosk) in St. Lucie County,
Florida, for the property legally described in Paragraph "B" and depicted on the attached
map as Exhibit "A".
2. On March 17, 2020, this Board held a public meeting on the petition.
3. The St. Lucie County Development Review Committee has reviewed the Major Site Plan
for the project and found it to meet all technical requirements and to be consistent with
the Future Land Use Map of the St. Lucie County Comprehensive Plan, subject to the
conditions set forth in Part B of this Resolution.
4. The proposed project is consistent with the general purpose, goals, objectives, and
standards of the St. Lucie County Land Development Code, the St. Lucie County
Comprehensive Plan and the Code of Ordinances of St. Lucie County.
5. The proposed project will not have an undue adverse effect on adjacent property, the
character of the neighborhood, traffic conditions, parking, utility facilities or other matters
affecting the public health, safety and general welfare.
6. All reasonable steps have been taken to minimize any adverse effect of the proposed
project on the immediate vicinity through building design, site design, landscaping and
screening.
7. The proposed project will be constructed, arranged and operated so as not to interfere
with the development and use of neighboring property, in accordance with applicable
district regulations.
8. The proposed project will be served by Port St. Lucie Utilities for potable water and
wastewater.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie
County, Florida:
JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT
SAINT LUCIE COUNTY
File No.: MJSP-5201915523 FILE# 4693593 0410112020 08:58:21 AM lution No. 2020-044
DR BOOK 4403 PAGE 906 - 912 Doc Type: RESO
Page 1 RECORDING: $61.00
A. The recitals set forth above are true and correct and expressly incorporated here within.
B. The property on which the Major Site Plan is being granted is described as follows:
LOT 13, BLOCK 1, MODEL LAND COMPANY SUBDIVISION, OF THE SECTION 15,
TOWNSHIP 36 SOUTH, RANGE 40 EAST, AS PER PLAT THEREOF ON FILE IN PLAT
BOOK 1, PAGE 41, OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA.
LESS AND EXCEPT THE SOUTH 10 FEET THEREOF CONVEYED TO ST. LUCIE
COUNTY, A POLITICAL SUBDIVISION OF THE STATE OF FLORIDA BY DEED
RECORDED IN OFFICIAL RECORDS BOOK 1166, PAGE 2977, OF PUBLIC
RECORDS OF ST. LUCIE COUNTY, FLORIDA.
Parcel ID No.: 3415-501-0016-000-6
Parcel Area: +/- 9.71 ACRES
C. Pursuant to Section 11.02.04 of the St. Lucie County Land Development Code, the
Major Site Plan for the project known as St. Lucie Gardens Apartments is hereby
approved as shown on the site plan drawings for the project prepared by Scott
Montgomery, PE, dated February 5, 2020, and date stamped received by the St. Lucie
County Planning & Development Services Department on February 7, 2020, as depicted
on the attached Exhibit "B", subject to the following conditions:
1) Prior to issuance of a Vegetation Removal Permit or Exemption, an
updated tree mitigation plan shall be provided to the Environmental Resources
Department for all impacted existing native trees meeting mitigation thresholds
outlined in LDC 6.00.05(D).
2) Prior to issuance of a Vegetation Removal Permit or Exemption, updated
species -specific surveys, including but not limited to gopher tortoises, per
appropriate state and federal protocols.
3) Prior to issuance of a Vegetation Removal Permit or Exemption,
whichever comes first, the developer shall provide an executed Conservation
Easement over all onsite wetlands, along with the approved Preserve Area
Monitoring and Management Plan (PAMMP), with an attached affidavit and
cashier's check (payable to the Clerk of the Court for recording fees) to the
County Attorney. The applicant shall also provide a georeferenced GIS shapefile
or CAD file of the conservation easement boundaries to St. Lucie County.
4) Prior to issuance of a Development Permit (Site Work or Building Permit),
the applicant shall finalize a school bus collection plan acceptable to the St. Lucie
County School District. A bench and additional sidewalk link may be appropriate
to provide safety for the selected option.
5) Prior to issuance of a Certificate of Occupancy, an eight (8) ft. opaque
fence/masonry wall with accompanying landscaping per LDC 7.09.04(E) shall be
provided along the entire west perimeter of the parcel, less a signed and
File No.: MJSP-5201915523
Page 2
Resolution No. 2020-044
notarized administrative wall waiver submitted from the adjacent property owner,
and the required subsequent landscaping per LDC 7.09.04(B).
1
6) Prior to issuance of a Certificate of Occupancy, all Category I invasive
plant species shall be eradicated from the site.
7) Prior to the issuance of a Certificate of Occupancy, the property owner(s), the
developer, his successors or assigns, shall convey to St. Lucie County in a
manner or form acceptable to the St. Lucie County Attorney, a ten (10) ft. strip of
land totaling +/- 3,307.5 square feet of right-of-way along Kitterman Road (Parcel
3415-501-0016-000-6), as depicted on the project site plan. The required sketch
and legal description shall be prepared by a Florida licensed surveyor and
mapper.
D. The approvals and authorizations granted by this Resolution shall expire on March 17,
2022 unless a building permit is secured or a site plan extension is granted in
accordance with Section 11.02.06(B)(2), St. Lucie County Land Development Code.
E. The property owner, including any successors in interest, shall obtain all applicable
development permits and construction authorizations from the appropriate State and
Federal and local regulatory agencies including, but not limited to, the United States
Army Corps of Engineers, the Florida Department of Environmental Protection, Florida
Department of Transportation, South Florida Water Management District, and the St.
Lucie County Environmental Resources, Public Works and Building Departments prior
to the commencement of any development activities on the property described in Part
A. Issuance of this permit by the County does not in any way create any rights on the
part of the developer to obtain a permit from a state or federal agency and does not
create any liability on the part of the County for issuance of this permit if the developer
fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal
agency or undertake actions that may result in a violation of state or federal law.
F A Certificate of Capacity, a copy of which is attached hereto as Exhibit "C" and made a
part hereof the Resolution, was granted by the Planning & Development Services
Department Director on March 17, 2020.
G. A recorded copy of this Resolution shall be attached to the site plan drawings described
in Part A, which plan shall be placed on file with the St. Lucie County Planning &
Development Services Department Director.
H. This Resolution shall be recorded in the Public Records.
ADOPTION
After motion and second, the vote on this Resolution was as follows:
Cathy Townsend, Chair AYE
Chris Dzadovsky, Vice Chair AYE
File No.: MJSP-5201915523
Page 3
Resolution No. 2020-044
Sean Mitchell, Commissioner AYE
Linda Bartz, Commissioner AYE
Frannie Hutchinson, Commissioner AYE
PASSED AND DULY ADOPTED this 17th day of March, 2020.
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLOIRDA
ATTEST:
f
DEPUTY K
m
a
TY, 0
10O�`�'P
APPROVED AS TO FORM
AND CORRECTNESS/ —
COUNTY A
File No.: MJSP-5201915523 Resolution No. 2020-044
Page 4
Exhibit A
Site Location Map
File No.: MJSP-5201915523
Page 5
Resolution No. 2020-044
Exhibit B
Site Plan
s?f g �i 6 INN I' w�uv rose w �- i
€ aig
a qA fr
Q
Tri
.�1Is.
It
' I
1o1m1HIM ti
milliR $ ' ✓ R i g.
Z�41
9 1-14 rIf Iffifib
� �f gee Fxs �
■■■� Y iTH Mad -51111 Id
/ q aa-
x
04
-ter a� �r
AAAAA IMP AAA
Cl
rrrrr rrrrr r A�� �� ' i
z qK
meativzwwtwu�row. r eu�mrrouprmraumuct we
$T. LUCE GARDENS APARTMENTS rwvRc�ruw o.r oT...�w
b.e�anwa,m
@01�II1II�
i000v�m0000�
o0a�0��m�m0�
a�
File No.: MJSP-5201915523
Page 6
Resolution No. 2020-044
I Exhibit C
Certificate of Concurrency
St Lucie ('ourty
Certificate or( aparfl.%
Date Cortif Icate No.
This document certifies that concarrency will be met and that adequate public facility
capacity exists to rrialritain the standards for levels of service as adopted in the St
Lucile County Comprehensive Plan for!
1. Type of development
mummer of units Number of square feet
2. Property legal description & Tax 10 no.
3. Approval. BUflCI1T1q Resolution No. 1, 1-1 Letter
4. Subject to the following conditions for conctirrericy:
Owner's name
I ! ilt, ,, ( I 1I
Address
G. Certificate Expiration Date
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel, and Is subject to the same terms conditions and expiration date listed herel",
The expiration date can be extended only Linder the same terms and conditions as the
underlying development orderissued with this certificate, or for subsequent
development ordpr(s) issued for the same property, use and size as described herein.
0
Planning and Development Services Director
St Lticie County, Florida
File No.: MJSP-5201915523
Page 7
Resolution No. 2020-044