HomeMy WebLinkAboutOrder No. 20-026 - Keen Road over Taylor Creek Bridge Repairs and Taylor Dairy Road over FPFWCD Canal Bridge Repairs - Ferreira Construction, Culpepper & Terpening and Andersen Andre Consulting Engineers (04-22-20) ' Re-Recording to Attach Bid Sheet Showing Ferrerria as Lowest Bidder, Attached Andersen Andre Proposal ORDER NO. 20-026 AN ORDER OF THE ST. LUCIE COUNTY ADMINISTRATOR AUTHORIZING AWARD OF BID NO. 20-038 (KEEN ROAD OVER TAYLOR CREEK BRIDGE REPAIRS AND TAYLOR m` D`o O00mzm DAIRY ROAD OVER FPFWCD CANAL/BRIDGE REPAIRS) TO THE LOW BIDDER, 5 o°A"_ FERREIRA CONSTRUCTION AND FURTHER AUTHORIZING ENTERING INTO WORK g m y AUTHORIZATIONS WITH CULPEPPER & TERPENING FOR CEI SERVICES AND W J 0 3 11 ANDERSEN ANDRE CONSULTING ENGINEERS FOR GEOTECHNICAL SERVICES ON °D A Z om��r THE BRIDGE REPAIR PROJECT m wo 7AC L, O WHEREAS, the St. Lucie County Administrator has made the following o = m determinations: 3 T1 1. On March 17, 2020, the St. Lucie County Public Safety Director declared a o 0 State of Local Emergency COVID-19 Public Health Emergency ("St. Lucie County Declaration of Emergency"); and 2. The findings in the St. Lucie County Declaration of Emergency are incorporated herein; and 3. On March 16, 2020, President Donald J. Trump and the Centers for Disease Control and Prevention ('CDC") issued the "15 Days to Slow the Spread" guidance advising individuals to adopt far-reaching social distancing measures, such as avoiding gatherings of more than 10 people, and in states with evidence of community spread, recommending restrictions to certain establishments conducive to mass gatherings and congregations; and 4. On March 29, 2020, the President extended such guidance to be in effect until April 30, 2020; and 5. On March 24, 2020, the Governor of the State of Florida issued Executive Order No. 20-83 directing the State Surgeon General and State Health Officer to issue a public health advisory to all persons over 65 years of age and persons that have serious underlying medical conditions that place them at high risk of severe illness from COVID- 19 urging them to stay home and to take such other measures as necessary to limit their risk of exposure to COVID-19; and JOSEPH E.SMITH,CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY 1 FILE# 4701928 04/23/2020 12'23:51 PM OR BOOK 4412 PAGE 1636-1645 Doc Type.ORD RECORDING: $86.50 ORDER NO. 20-026 AN ORDER OF THE ST. LUCIE COUNTY ADMINISTRATOR AUTHORIZING AWARD OF BID NO. 20-038 (KEEN ROAD OVER TAYLOR CREEK BRIDGE REPAIRS AND TAYLOR DAIRY ROAD OVER FPFWCD CANAL/BRIDGE REPAIRS) TO THE LOW BIDDER, FERREIRA CONSTRUCTION AND FURTHER AUTHORIZING ENTERING INTO WORK AUTHORIZATIONS WITH CULPEPPER & TERPENING FOR CEI SERVICES AND ANDERSEN ANDRE CONSULTING ENGINEERS FOR GEOTECHNICAL SERVICES ON THE BRIDGE REPAIR PROJECT WHEREAS, the St. Lucie County Administrator has made the following determinations: 1. On March 17, 2020, the St. Lucie County Public Safety Director declared a State of Local Emergency COVID-19 Public Health Emergency ("St. Lucie County Declaration of Emergency"); and 2. The findings in the St. Lucie County Declaration of Emergency are incorporated herein; and 3. On March 16, 2020, President Donald J. Trump and the Centers for Disease Control and Prevention ('CDC") issued the "15 Days to Slow the Spread" guidance advising individuals to adopt far-reaching social distancing measures, such as avoiding gatherings of more than 10 people, and in states with evidence of community spread, recommending restrictions to certain establishments conducive to mass gatherings and congregations; and 4. On March 29, 2020, the President extended such guidance to be in effect until April 30, 2020; and 5. On March 24, 2020, the Governor of the State of Florida issued Executive Order No. 20-83 directing the State Surgeon General and State Health Officer to issue a public health advisory to all persons over 65 years of age and persons that have serious underlying medical conditions that place them at high risk of severe illness from COVID- 19 urging them to stay home and to take such other measures as necessary to limit their risk of exposure to COVID-19; and JOSEPH E.SMITH,CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY 1 FILE# 4701928 04/23/2020 12:23:51 PM OR BOOK 4412 PAGE 1636-1645 Doc Type:ORD RECORDING: $86.50 6. Pursuant to Executive Order No. 20-83, the Governor of the State of Florida further directed the State Surgeon General and the State Health Officer to issue a public health advisory providing that individuals should cease all social or recreational gatherings of 10 or more people; and 7. On March 25, 2020, the State Surgeon General issued a Public Health Advisory consistent with Executive Order 20-83; and 8. On March 25, 2020, the President of the United States declared that a major disaster exists in the State of Florida as a result of COVID-19; and 9. On April 1, 2020, the Governor of the State of Florida issued Executive Order 20-91 directing senior citizens, individuals with a significant underlying medical condition, and persons engaging in nonessential services or activities to stay at home. 10. On March 4, 2020 bids were received for the Bridge Repairs contract (Bid No. 20-038) that includes repairs to the Keen Road Bridge over Taylor Creek and the Taylor Dairy Road Bridge over FPFWCD Canal 1 "Bridge Repairs Project". Normal bid procedures were followed, and the low bidder was Ferriera Construction, Inc. for $515,422.33 (please see attached). CEI services for the Project were originally included in an RFQ combining this Bridge Repair Project with the replacement of the Gordy Road Bridge. The RFQ was postponed due to the public participation requirements and how to meet those needs while meeting CDC guidelines for social distancing. In an effort to keep the Bridge Repair project moving forward, the Engineer Division obtained a proposal for CEI services from Culpepper & Terpening in the amount of $84,473.80 (please see attached) and a proposal from Anderson Andre Consulting Engineers for geotechnical services in the amount of $10,116.50 (copy attached). Both Culpepper & Terpening and Anderson Andre have current contracts with the County to provide CEI and Geotechnical Services, respectively. Engineering staff recommends that the County Administrator proceed on an emergency basis to enter into work authorizations with Culpepper & Terpening and Anderson Andre to perform CEI and Geotechnical Services on this 2 Agreement. Due to public health, safety and welfare concerns, Engineering staff recommends that the bridge repairs commence immediately including construction CEI and Geotechnical services. 11. Due to Executive Order 20-91, the Board has cancelled all public meetings through April 30, 2020, including District public meetings. The next Board meeting is currently scheduled for May 19, 2020 but may be pushed further delayed due to the COVID-19 emergency. 12. The County has determined that public health, safety and welfare requires that the County proceed with the Bridge Repairs project including construction and CEI services before the next Board meeting. 13. Paragraph 2 of the St. Lucie County Declaration of Emergency provides that the County Administrator may take all actions necessary and appropriate to protect human life and prosperity, to the extent necessary to accommodate the emergency; and NOW, THEREFORE, BE IT ORDERED AS FOLLOWS: 1. The determinations, orders, and declarations identified above are incorporated herein. 2. 1 hereby authorize the County Administrator or designee to sign work authorizations with Culpepper & Terpening and Anderson Andre Consulting Engineers for CEI and Geotechnical Services, respectively, for the Bridge Repair Project, as reviewed and approved by the County Attorney. 3. 1 hereby authorize the County Administrator or designee to award the bid on the on the Bridge Repairs project to the low bidder Ferreira Construction and further to sign a contract to construct the Bridge Repairs Project with Ferreira Construction, as reviewed and approved by the County Attorney. 4. This Order, as set out above, shall be placed on the agenda of the next Board of County Commissioners meeting for purposes of review and ratification. Severability. 91 Any provision(s) within this Order that conflict(s) with any State or Federal law or constitutional provision, or conflict(s) with or are superseded by a current or subsequently -issued Executive Order of the Governor or the President of the United States, shall be deemed inapplicable and deemed to be severed from this Order, with the remainder of the Order remaining intact and full force and effect. This Order is effective as of 8:00 a.m. ono%-L—day of April 2020. This Order will expire upon the expiration of the existing State of Local Emergency, as same may be extended by subsequent order or declaration, unless earlier terminated by subsequent Order. Prior resolutions and emergency orders remain in force and effect unless modified or superseded. This Order shall be filed in the Office of the Clerk of the Circuit Court. I-I""D A Signed thi day of oCj 2020 at 0am.(p.m.) H ward A. Tipton- CULPEPPER & TERPENING INC CONSULTING ENGINEERS I LAND SORVEYORS April 21, 2020 Project No.: 20-091 Sender's Email: mdimitriou(aD-ct-eng.com V/}1 APPROVED 1 VIA: Email (GrahamK(aD-stlucieco.org) / ( eyha y t8N. mAX22,WW 5 GAG Ms. Kim Graham, P.E. Digitally signed by Kimberly Graham St. Lucie County Engineering Date: 2020.04.22 2300 Virginia Avenue 08:43:05-04.0 Ft. Pierce, Florida 34982 RE: St. Lucie County Bridge Repairs; SLC Project No. 18501 — CEI Proposal Dear Ms. Graham: Please find attached a copy of our office's proposal to provide CEI Services for the St. Lucie County Bridge Repairs for Keen Road over Taylor Creek and Taylor Dairy Road over FPFWCD Canal 1. On behalf of the firm of Culpepper & Terpening, Inc., we thank you for the opportunity to provide a proposal to provide CEI Services on this important project. We look forward to being part of your project team. Please contact me at (772) 979-0082, if you have any questions or concerns. Sincerely, CULPEPPER &,TE]RPENING, INC. M�'celo Dimitribu, P.E. EI Division Manager A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET I FT. PIERCE, FL 34981 (772) 464-3537 FAX: (772) 464-9497 Culpepper & Terpening, Inc. 4/21/20 CEI Services for St. Lucie County Bridge Repairs Keen Rd. over Taylor Creek & Taylor Dairy Road over FPFWCD Canal 1 St. Lucie County Engineering; SLC Project No. 18501 Project Description/Objectives: Culpepper & Terpening, Inc. will provide CEI Services to St. Lucie County for the Keen Road over Taylor Creek and Taylor Dairy Road over FPFWCD Canal 1 bridge repairs. SCOPE OF SERVICES — Exhibit The part-time CEI Services to be provided shall include the following scope. Scope of Work: Task #1- Preconstruction and Contract Administration The Engineer will provide the following administrative services: a. Engineer will schedule, coordinate, and conduct a pre -construction conference with all required parties in attendance - virtual if required. b. Engineer will review project specific permit requirements with the contractor and will monitor the work to coordinate delivery of contractor work product including NPDES reports and as- builts. c. Engineer will review the storm water and erosion control plan to confirm the contractor has addressed each feature and phase of construction and has provided a complete application package to FDEP. The Engineer will require the contractor to maintain a copy of the plan and permit readily accessible to project personnel or an official desiring to review the site. d. The Engineer will monitor the submittal/shop drawing process. Engineer will provide the follow up needed to assure the reviews are completed timely. e. Engineer will work with the contractor to identify and answer Requests for Information (RFIs). The Engineer will log all RFIs received from the contractor f. Engineer will utilize the pay item list to process monthly progress estimates. Engineer will confirm all quantities requested for payment and confirm the contractor's tabulation includes, amount requested, pervious payments and amount retained. The Engineer will assure the contractor provides partial releases from its subcontractors and suppliers and will produce a written recommendation for each partial payment. g. If changes to the project scope are required, Engineer will negotiate fairly with the contractor as needed to adjust the cost of the work. The Engineer will provide the County with a fully detailed finding of fact, entitlement analysis, record of negotiation and amendment form. Engineer personnel will support the Project Manager when the items are presented for commission approval. Page I of 3 Task # 2- Construction Engineering and Inspection The Engineer will perform the following Construction Engineering and Inspection Services: a. The contractor is responsible for selecting the appropriate means and methods to complete the work as described in the plans and specifications; while maintaining compliance with all regulatory permits, and applicable state and federal laws. Engineer will inspect the work for conformance with plans and specifications, document and advise the County of observed violations, and will consult with the County regarding stop work orders if needed to correct deficiencies in the contractor's operations. b. Engineer will review sampling and testing of component materials and completed work in accordance with the Construction Contract documents. The 1ngineer will provide surveillance of the Contractor's Quality Control activities and review the sampling and testing of materials and completed work items for verification and acceptance. c. Engineer will verify that storm water controls are deployed in accordance with the approved storm water plan. The Engineer will verify the contractor cleans and maintains the devices and that maintenance inspections are performed weekly at a minimum and after each 1/2-inch rainfall and the appropriate reports are completed. The Engineer will monitor flow patterns to verity the control devices contain turbidity within the site and have not altered or impeded existing drainage patterns or directed additional flow to adjacent properties. d. Engineer will maintain a daily report of project activity. A report will be prepared for each day that the inspector is onsite. The report will include documentation of weather conditions, and contractor work activities. The written report will be supplemented with photographs as needed. Progress photographs will be on a regular basis. Engineer shall also document if weather has impacted the contractor's daily progress on a controlling item of work. e. Engineer shall maintain a log or contract time (days) and track any additional contract time that was credited due to inclement weather, additional work, etc. f. Engineer will hold periodic progress meetings to coordinate project activities. Bi-weekly meetings are anticipated but the frequency may be increased based on the scope of work and the performance of the contractor. Engineer will document each meeting and provide notes of the discussions to attendees and interested County staff. The meeting will typically review progress to date and planned activities in the coming period, review the status of submittals and RFIs, review pending traffic impacts, review and coordinate materials testing, review the status of pending and upcoming payments, review and address third party coordination needed by the County and permitting agencies. g. Engineer will support the County's Public Information Officer (PIO) and provide coordination of upcoming lane closings or work activities and will supply progress photographs. The Engineer will escort County staff as needed to access different areas of the project and describe work in progress. h. Upon receipt of the contractor's notice the work is substantially complete; Engineer will schedule and conduct an initial inspection of the project and will compile a punch list of remaining work items and deficiencies. Once all items have been corrected the Engineer will schedule and conduct a final inspection to confirm the project is complete and ready for acceptance by the County. Engineer will prepare a recommendation of final acceptance for the Project Manager and a letter of final acceptance for the contractor. Page 2 of 3 Task #3 Project Closeout Engineer will document closing of all permits, prepare the contractor's final change order and certificate of payment, initiate the warranty period and prepare a deliverable transfer of project records to the County. a. Engineer will verify the contractor has filed its notice of termination for the generic National Pollutant Discharge Elimination System (NPDES) permit. A copy of the notice of termination will be included in the file. If specific project permits are required any records required by the permit will be transferred to the agency and Engineer will prepare the required Certificate of Construction Completion. The Engineer will include agency personnel in all acceptance inspections and document satisfaction of their punch list items through photographs and as-builts. b. Engineer will obtain any warranty documents required from the contractor and will prepare a warranty certificate initiating the warranty period. Engineer will review the contractor's as -built drawings and will work with the contractor to complete revisions until the drawings accurately reflect the as -built condition. c. Engineer will prepare a close-out change order to zero -out the contract balance. The Engineer will work with the contractor to obtain all final releases of liens required for final payment and will prepare a recommendation of final payment. d. Engineer will compile and transfer all required project documents in PDT' format. Assumptions/Clarifications: • As -built plans are to be performed by others. • Testing and geotechnical consultation and reviews to be by others. • Budget is based on contractor 40 hour work week for a construction duration of 17 weeks. SCHEDULE — Exhibit B Work will commence upon written notification to proceed (estimated May 2020). Invoices will be submitted monthly. Duration of CEI services work is estimated as 21 weeks. All work shall be completed no later than October 31, 2020. COMPENSATION — Exhibit C Services will be provided on a time & expense (unit rate) basis in accordance with Attachment A. The estimated total fee is $84,473.80. Authorization to work will be provided by St. Lucie County. Work will be performed under terms and conditions of the St. Lucie County Contract. Page 3 of 3 CEI Services for St. Lucie County Bridge Repairs Keen Road Over Taylor Creek & Taylor Dairy Road Over FPFWCD Canal 1 SLC PROJECT NO. 18501 MANHOUR ESTIMATE - ATTACHMENT A Culpepper & Terpening, Inc. 04 2120 V2 During Construction C&T) Sr. Project Manager, P.E. Administrative Support Pre and Post Construction (C&T) Sr. Project Manager, P.E. Administrative Support Subconsultant -JMT During Construction (JMT) Sr Project Engineer, P.E. Project Manager Sr. Inspector Pre and Post Construction (JMT) Sr. Project Engineer, P E. Project Manager Hours/Week Weeks Total Hours Rate/Hr Total 2 17 34 $ 17850 $ 6,069.00 2.5 17 42.5 $ 40,80 $ 1,73400 Sub -total = I $ 7,803.00 Hours/Week Weeks Total Hours Rate/Hr Total 2 4 8 $ 178.50 $ 1,42&00 4 4 16 $ 40.80 $ 652.80 Pre & Post Construction Total = Sub -total = $ 2,080.80 9,883.80 Hours/Week Weeks Total Hours Rate/Hr Total 2 17 34 $ 175.00 $ 5,950.00 8 17 136 $ 125.00 $ 17,000.00 32 17 544 $ 85.00 $ 46.240.00 Sub -total = 1 $ 69,190.00 Hours/Week Weeks Total Hours Rate/Hr Total 2 4 8 $ 175.00 $ 1,400,00 8 4 32 $ 12500 $ 4,000.00 Pre & Post Construction Total = Subconsultant Total = Subconsultant Mark-up (0.0%) _ $ 5,400.00 $ 74,590.00 $ Total = 1 $ 84,473.80 Manhour and Cost Estimate for CEI Services for St. Lucie County Bridge Repairs - Keen Rd. over Taylor Creek & Taylor Dairy Rd. over FPFWCD Canal 1 (Project # 18501) Estimated Contract Duration .FYI N71 _ CEI START DATE t 4!1612020 / CEI END DATE 91101'2020 CONSTRUCTION DURATION (WEEKS) 17 On , Is O CEI DURATION (WEEKS) 21 a Pre and Post Construction Staff Positions Sr. Project Engineer Pro ect Manager Construction Staff Positions Sr. -Project -Engineer Project Manager Sr. Inspector Record Drawings provided by other, ' Geotechnical provided by other HRS/W` �41JRS RATEIHR TOTAL COST 2.00 _ 4.00 8.00 $ 175.00 $ 1,400.00 8.00 4.00 32.00 $ 125.00 $ 4,000.00 SUBTOTAL: $ 5,400.00 HRs EKS 2.00 17.00 _ 34.00 $ 175.001 $ 5,950.00 8.00 17.00 1 136.00 $ 125.001 $ 17,000.00 32,00 17.00 544,00 $ 85.00 $ 46,240.00 SUBTOTAL: S 69,190.00 TOTAL: 5 74,590,00