Loading...
HomeMy WebLinkAbout10. Capital Improvements Element GOPCapital Improvements Element Goals, Objectives and Policies Goal 9.1: To provide public facilities necessary to achieve and maintain adopted level of service standards concurrent with demand through fiscally sound capital improvement programming and budgeting. Objective 9.1.1: Define types of public facilities, establish standards for Level of Service for each type of public facility, and determine what capital improvements are needed in order to achieve and maintain standards (as well as to repair or replace existing public facilities). Policy 9.1.1.1 - Public facilities means the capital improvements and systems of each of the following: roads, mass transit, stormwater management, potable water, sanitary sewer, solid waste, parks and recreation, libraries, jails, courthouse facilities, administrative facilities, mosquito control, Treasure Coast International Airport, public education and shall include land, structures, the initial furnishings and equipment, design, permitting, and construction costs. Policy 9.1.1.2 - The County shall establish standards for Levels of Service for public facilities, as follows: a. Category A Public Facilities are roads, stormwater management, potable water, sanitary sewer, solid waste, schools, parks and recreation facilities used for concurrency all of which are addressed in other elements of this Comprehensive Plan. b. Category B Public Facilities are libraries, administration, mosquito control, and Treasure Coast International Airport as owned, operated or developed by St. Lucie County. Category B Public Facilities are not used for concurrency purposes as provided for in the Concurrency Management System. Policy 9.1.1.3 - The quantity of public facilities necessary to eliminate existing deficiencies and to meet the needs of future growth shall be determined for every type of public facility by the following calculation: Q=(SxD)-E. Where: Q is the quantity of public facility needed, S is the standard for Level of Service, D is the demand, such as the population, and E is the inventory of existing facilities. The calculation will be used for existing demand in order to determine existing deficiencies. The calculation will be used for projected demand in order to determine needs of future growth. The estimates of projected demand will account for demand that is likely to occur from previously issued development orders as well as future growth. Public facilities to serve demand from previously issued development orders shall be included in "D" (demand) in the preceding calculation. Policy 9.1.1.4 - The public facility formula will be used for current demand in order to determine existing deficiencies. The public facility formula will be used for projected demand in order to determine needs of future growth. The estimates of projected demand will account for demand that is likely to occur from previously issued development orders as well as future growth. Policy 9.1.1.5 - Demand that is likely to occur from previously issued development orders which require a Certificate of Capacity will be addressed by the County "reserving" capacity of public facilities for development orders that were issued by the County prior to the adoption of this Comprehensive Plan and that are determined to have vested rights for purposes of the concurrency management system. Policy 9.1.1.6 - The County requires persons with legitimate and substantial vested rights to continue development in good faith in order to reserve capacity of public facilities. The County will not reserve capacity of public facilities for previously issued development orders that do not have vested rights for purposes of concurrency management, and/or which do not continue development in good faith. Policy 9.1.1.7 - There are three circumstances in which the standards for Levels of Service are not the exclusive determinant of need for a public facility: a. Calculated needs for public facilities in coastal high hazard areas are subject to all limits and conditions in Coastal Management Element of this Plan (see Policy 9.1.5.1). b. Replacement of obsolete or worn out facilities, and repair, remodeling and renovation, will be determined by the Board of County Commissioners upon the recommendation of the County Administrator. c. Public facilities that provide Levels of Service in excess of the standards adopted in this Plan may be constructed or acquired at any time as long as both conditions 1) and 2) and at least one of the conditions 3) through 5) are met. 1) The facility does not make financially infeasible any public facility of the same type that is needed to achieve or maintain the standards for Levels of Service adopted in this Plan, 2) The facility does not contradict, limit or alter the achievement of the overall goals, objectives and policies of this Plan, 3) The excess capacity is an integral part of a capital improvement that is needed to achieve or maintain standards for Levels of Service, 4) The excess capacity provides economies of scale making it less expensive than a comparable amount of capacity if acquired at a later date, 5) The asset acquired is land that is environmentally sensitive, or designated by the County as necessary for conservation, recreation or protection of high hazard coastal areas. Policy 9.1.1.8 - Capital improvement projects that increase or maintain Category A level of service standards shall be included in the regular Schedule of Capital Improvements contained in this Capital Improvements Element. Policy 9.1.1.9 - The determination of location of improvements to expand public facilities will take into consideration projected growth patterns. Where applicable, public facility improvements will be coordinated with the capital facility plans of any other governmental entity providing public facilities within St. Lucie County St. Lucie County Comprehensive Plan 9-1 Adopted 4.2.2019 Capital Improvements GOPs Policy 9.1.1.10 - The following public facility improvements within a facility type are to be considered in the following order of priority, as determined by the Board of County Commissioners: a. Replacement of obsolete or worn-out facilities, including repair, remodeling and renovation of facilities that contribute to achieving and/or maintaining Levels of Service. b. New facilities that reduce or eliminate existing deficiencies in Levels of Service. c. New public facilities, and improvements to existing public facilities, that eliminate public hazards not otherwise eliminated by improvements prioritized according to Subsections A. or B., above. d. New or expanded facilities that provide the adopted Levels of Service for new development and redevelopment during the next five fiscal years, as updated by the annual review of this Capital Improvements Element. St. Lucie County may acquire land or right-of-way in advance of the need to develop a facility for new development. The location of facilities constructed pursuant to this Subsection shall conform to the Future Land Use Element, and specific project locations shall serve projected growth areas within the allowable land use categories. e. Improvements to existing facilities, and new facilities that significantly reduce the operating cost of achieving and/or maintaining Levels of Service. f. New facilities that exceed the adopted Levels of Service for new growth during the next five fiscal years by either: 1) Providing excess public facility capacity that may be needed by future growth beyond the next five fiscal years, or 2) Providing higher quality public facilities than are contemplated in the County's normal design criteria for such facilities. g. Facilities not described in Subsections A. through E., above, but which the County is obligated to complete, provided that such obligation is evidenced by a written agreement the County executed prior to July 31, 1990. h. Project evaluation may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. i. The County shall review the best available data and science in its policy and planning decisions for public facilities, recognizing resiliency and the need to withstand increased storm surge and flooding in evaluating public infrastructure decisions. Policy 9.1.1.11 - When any County arterial or collector road or segment of such a road is determined to be operating one Level of Service below its adopted standard, the County shall exercise one of the following. a. Enter into a contract that will result in the addition of capacity to the facility within six months (or longer if under a Development Agreement) of the determination that the facility is operating below its Level of Service Standard, and delay issuance of development orders until the contract has been executed; b. Enter into an enforceable development agreement that specifies that new development will provide for the upgraded facility; c. Amend the Comprehensive Plan to lower the Level of Service at the next opportunity; or d. Not issue any development permits in the impacted area. The purpose of providing for the temporary operation below the adopted Level of Service is to provide a reasonable period of time to restore the Level of Service through appropriate improvements to roads that are forecast to operate at the adopted Level of St. Lucie County Comprehensive Plan 9-2 Adopted 4.2.2019 Capital Improvements GOPs Service, but which may unexpectedly operate at a lower Level of Service. All development orders issued pursuant to this Policy shall be conditioned on the attainment of the adopted Level of Service. However, this Policy shall not impair the County's right to refuse to issue a development order pursuant to this Policy if the Board of County Commissioners determines that the resultant lower Level of Service caused by the proposed development order would constitute a threat to public health or safety. Policy 9.1.1.12 - The standards for Levels of Service for Category A Public Facilities shall be as follows: Drainage Level of Service Standards Structure/Facility 110 yr., 24 hr Houses/Building I <FFE Evacuation Routes2 11/2W3 Arterial Roads4 Other Roads5 1 2 3 4 5 1/2W <0.5 ft. 10 yr., 72 hr <FFE <0.5 ft. <0.5 ft. <0.75 ft. 100 yr., 72 hr. <FFE <1.0 ft. <1.0 ft. <1.5 ft. Peak flood stages less than first (finished) floor elevation based on available data. Evacuation routes as defined by the County and the Treasure Coast Regional Planning Council. Flooding limited to each side of the road such that one-half of the roadway width (W) or one travel lane is not flooded. Roads with four or more travel lanes, or roads that are only access to a respective area/development (secondary evacuation routes). Other roads which are not critical for evacuation, but which will be used to estimate encroachment on FFEs. St. Lucie County 9-3 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs Non-SIS Facilities Facility Type Peak Hour/Peak Inside a Transportation Constrained I Direction Concurrency /Backlogged Facility Management Area' Non -State Roadway D D Maintain Non -State Roadway D E3 Maintain Major City/County Road Non -State Roadway E3 E3 _ Maintain (Arterial) Other State Roads Multi -Lane (Rural/Urban) Rural B N/A N/A Urban D 7, Maintain Two -Lane (Rural/Urban) Rural C N/A N/A Urban D N/A _! Maintain2 Notes Level of Service Standards inside of parentheses apply to general use lanes only when exclusive through lanes exist. Transportation Concurrency Management Areas are geographically compact areas designated in local government comprehensive plans where intensive development exists or is planned in a manner that will ensure an adequate level of mobility and further the achievement of identified important state planning goals and policies, including discouraging the proliferation of urban sprawl, encouraging the revitalization of existing downtowns and designated redevelopment areas protecting natural resources, protecting historic resources, maximizing the efficient use of existing public facilities, and promoting public transit, bicycling, walking and other alternatives to the single occupant automobile. Maintain means continuing operating conditions at a level such that significant degradation does not occur based on conditions existing at the time of local government comprehensive plan adoption. For roadways in rural areas, transitioning urbanized areas, urban areas or communities, significant degradation means (1) an increase in average annual daily traffic volume of 5 percent below the speed, of the adopted LOS standard. For roadways in urbanized areas, for 100th highest hour of 5 percent below the speed, of the adopted LOS standard. For roadways in urbanized areas, for roadways parallel to exclusive transit facilities, or for intrastate roadways in transportation concurrency management areas, significant degradation means (1) an increase in average annual daily traffic volume of 10 percent above the maximum service volume, or (2) a reduction in operating speed for the peak directions in the 100th highest hour of 10 percent below the speed, of the adopted LOS standard. For other state roads in transportation concurrency management areas, significant degradation means that amount defined in the transportation mobility element. For constrained roadways meeting or exceeding the level of service standards, (maintain) does not apply until the roadway is operating below the applicable minimum level of service standard. The County wishes to maintain a LOS D or better for all roadways but recognizes that allowing a LOS E allows development to proceed while a minimum of LOS D might cause severe constraints on private development. However, a LOS D will be utilized for these roadways when establishing transportation impact fees. St. Lucie County Comprehensive Plan 9-4 Adopted 4.2.2019 Capital Improvements GOPs SIS Facilities SIS Roadway Roadway Segment LOS Corridors _ Martin County Line to Gatlin Boulevard Standard 1-95 C 1-95 Gatlin Boulevard to St. Lucie Boulevard C 1-95 St. Lucie Boulevard to Midway Road C 1-95 Midway Road to SR 70/ Okeechobee Road C 1-95 SR 70/ Okeechobee Road to SR 68/ Orange D Avenue 1-95 SR 68/ Orange Avenue to SR 614/ Indrio Road D 1-95 SR 614/ Indrio Road to Indian River County Line C Florida's Turnpike Martin County Line to Becker Road C Florida's Turnpike Becker Road to Port St. Lucie Boulevard Port St. Lucie Boulevard to SR 70/ Okeechobee C Florida's Turnpike C Road SR 70/ Okeechobee Road to Indian River Florida's Turnpike B Count Okeechobee County Line to Carlton Road B SR 701 Okeechobee Road B SR 70/ Okeechobee Carlton Rod to McCarthy Road Road B _ SR 70/ Okeechobee _ McCarthy Road to Florida's Turnpike Road C SR 70/ Okeechobee Florida's Turnpike to 1-95 Road Public Facil Level of Service I Service Area 100 gallons per capita per day Potable Water 117 gallons per capita per day (FPUA) Unincorporated areas 100 gallons per capita per day Sanitary Sewer 110 gallons per capital per day (FPUA) Unincorporated areas 3.88 pounds of Class I solid waste per capita per day at landfill County -wide 0.81 pounds of construction and Solid Waste demolition debris per capita County -wide Countywide Parks & 5 acres of community parks11,000 Recreation population Unincorporated areas 2.5 acres of regional parks/1,000 population 21.2 acres of Resource -based parks/1,000 Countywide population Countywide Schools 100% of program capacity for all schools Countywide St. Lucie County Comprehensive Plan 9-5 Adopted 4.2.2019 Capital Improvements GOPs Policy 9.1.1.13 - The County shall amend the Adequate Facilities Ordinance to include school concurrency requirements within one year of adoption of this element. Policy: 9.1.1.14 - The standards for Level of Service for Category B Public Facilities shall be as follows: Level of Service Service Area Library 0.525 square feet of library space per capita Countywide 1.45 books per capita Maintain state standards for controlling adult mosquitoes when they exceed 25 per night. Countywide Mosquito Control Countywide Airport Provide for up to 369,192 operations per year. NA Policy 9.1.1.15 - Capital Improvements for Category B Public Facilities shall be included in this element and updated annually in order to monitor maintenance of Category B level of service standards. Policy 9.1.1.16 - The County shall maintain the provision of Administrative and Maintenance space as the County grows. Policy 9.1.1.17 - The County shall continue to require new development to meet Level of Service Standards for both on- and off -site improvements, including local streets, water and sewer connection lines, stormwater management facilities, and open space. Policy 9.1.1.18 - A Capital Improvement is defined as follows: a major nonrecurring expenditure that includes one or more of the following: 1. Any acquisition of land for a public purpose; or 2. Any construction of a new facility (a public building, or water lines, playfield or the like) or an addition to, or extension of such a facility; or 3. A nonrecurring rehabilitation (something which is infrequent and would not be considered annual or other recurring maintenance) or major repair of all or a part of a building, its grounds, or a facility, or equipment, provided that the cost is $50,000 or more and the improvement will have a useful life of ten years or more; 4. Purchase of major equipment items with a cost, individually or in total, of $100,000.00 or more, which have a useful life of ten years or more; 5. Any planning, feasibility, engineering or design study related to an individual capital project or to a program that is implemented through individual capital improvement projects; or 6. Any expenditure that pertains to a physical asset which has been identified as an existing or projected need in one or more individual Comprehensive Plan amendments. Policy 9.1.1.19 - The County adopts by reference the St. Lucie School District Five Year District Facilities Work Program. St. Lucie County 9-6 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs Fiscal Analysis of Estimated Transportation Capital Improvements (excluding 1-95) Committed Fundinci Funding Source FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 Balance From Previous Year Impact Fees Credited for Roadways* General Fund Allocation Developers' Agreements Special DistrictIMSTU Grants FDOT Adopted Work Plan $0 $0 $1,453,809 $2,907,618 $4,361,427 $0 $1,453,809 $1,453,809 $1,453,809 $3,971,286 $0 $0 $0 $0 $0 $0 $0_ $0 $0 $0 $0 $0 $0 $0 $15,934,613 $0 $0 $0 $0 $6, 700, 000 1 1 $147,145, 341 Total Funding $0 $1,453,809 $2,907,618 1$4,361,427 $178,112,667 Capital Improvements Cost $0 $1,453,809 $0 1$0 $178,112,667 Balance $0 $1,453,809 $2,907,618 1 $4,361,427 $0 *Peru nit impact fee for roadways/ schedule 3 of Chapter 10 of submitted data and analysis ** Developments presently in the approval process but not yet finally approved, are anticipated to construct roadway improvements that will reduce the amount of funding needed from the Special District/MSTU. Special District funding to be used only to the extent that impact fees, proportionate fair -share contributions, and other developer contributions are inadequate to fund scheduled capital improvements. ***Grants from TRIPS, Council on Aging [this table was last updated in 2007] Objective 9.1.2: Provide needed public facilities that are within the ability of the County to fund the facilities from County revenues, development's proportionate share and contributions and grants or gifts from other sources. Policy 9.1.2.1 - The estimated costs of all needed capital improvements shall not exceed conservative estimates of revenues from sources that are available to the County pursuant to or not precluded by current statutes, and which have not been rejected by referendum, if a referendum is required to enact a source of revenue. Policy 9.1.2.2 - The County will allocate the costs of new public facilities on the basis of the benefits received by existing and future residents so that current residents will not subsidize new development. Policy 9.1.2.3 — Both existing and future development contribute to the costs for the provision of public facilities, as follows: A. Future development. Future development shall pay for 100 percent of the capital improvements needed to address the impact of such development. Future development's proportion of the cost of capital improvements needed to address the impact of such development shall be determined, in part, by the County's impact fee ordinances and supporting studies, which shall include credits for other payments by future development. Impact fees, enterprise fund user charges, connection fees, and other user fees paid by new development shall be reviewed every two years to assure that provision of capital improvements needed to address the impact of future development will not increase ad valorem tax rates. Upon completion of construction, "future" development becomes "present" development, and shall contribute to paying the costs of the replacement of obsolete or worn out facilities as described in subsection B below. Future development's payments may take the form of, but are not limited to, voluntary contributions for the benefit of any public facility, impact fees, capacity St. Lucie County Comprehensive Plan 9-7 Adopted 4.2.2019 Capital Improvements GOPs ** ** *** fees, dedications of land, provision of public facilities, and future payments of user fees, special assessments and taxes. Future development shall not pay impact fees for the portion of any capital improvements that reduces or eliminates existing deficiencies. B. Existing development. Existing development shall pay for the capital improvements to facilities that reduce or eliminate existing deficiencies, and some or all of the replacement of obsolete or worn out facilities. Existing development's payments may take the form of user fees, special assessments, and taxes. Policy 9.1.2.4 - Both existing and future development may have part of their costs paid by grants, entitlements or provision of public facilities from other levels of government and independent districts. Policy 9.1.2.5 - Capital improvements may be financed, and debt shall be managed as follows: a. Public facilities financed by County enterprise funds (i.e., automated services, potable water, sanitary sewer and solid waste) shall be financed by: 1) Debt to be repaid by user fees and charges for enterprise services, or 2) Current assets (i.e., reserves, surpluses and current revenue), or 3) A combination of debt and current assets. b. The financing of the capital cost of public facilities with non -enterprise funds (i.e., roads, stormwater management and parks) shall be from current revenue, equity or debt, or a combination of current revenue, equity and debt, whichever may be most cost effective and consistent with prudent asset and liability management, given the useful life of the assets to be financed and efficient use of the County's debt capacity. c. All development orders issued by the County which require public facilities that will be financed by debt shall be conditioned on the issuance of the debt, or the substitution of a comparable amount of non -debt revenues. Policy 9.1.2.6 - The County shall not provide a public facility, nor shall it accept the provision of a public facility by others, if the County is unable to pay for the subsequent annual operating and maintenance costs of the facility. Policy 9.1.2.7 - In the event that sources of revenue listed in the Schedule of Capital Improvements of this Element require voter approval in a local referendum that has not been held, or a referendum is held and is unsuccessful, this Comprehensive Plan will be amended to include one or more new revenue sources which shall not increase the County's existing debt. Alternatively, this Comprehensive Plan may be amended to adjust for the lack of revenues, in any of the following ways: 1. Increase the use of other sources of revenue. 2. Reduce the standard for levels of service for one or more public facilities. 3. Decrease the cost, and therefore the quality, of some types of public facilities while retaining the quantity of the facilities that is inherent in the standard for Levels of Service. 4. A combination of the above alternatives. Policy 9.1.2.8 - All development orders issued by the County which require Category A St. Lucie County 9-8 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs public facilities that will be financed by sources of revenue which require voter approval in a local referendum that is yet to be held shall be conditioned on the referendum being approved, or the substitution of other sources of revenue to ensure that facilities are provided concurrent with need. Policy 9.1.2.9 - Recognizing that future funding opportunities may be less than or greater than originally anticipated and that overall the County will operate within a constrained financial setting, the first priority for allocation of monies for capital purposes is for the maintenance of the County's present facilities so as to ensure proper protection of the investments in such facilities. Policy 9.1.2.10 - The County shall prudently limit the amount of debt it assumes for capital improvements or other purposes. At a minimum, the County shall not assume debt obligations which would result in the County exceeding the debt ratios established by state law. Objective 9.1.3: Within the County's financial capability, provide needed capital improvements for repair or replacement of obsolete or worn out facilities, eliminating existing deficiencies, and meeting the needs of future development and redevelopment caused by previously issued and new development orders. Policy 9.1.3.1 - The County shall provide, or arrange for others to provide, the public facilities listed in the Schedule of Capital Improvements of this Capital Improvements Element. Policy 9.1.3.2 - Pursuant to Section 163.3177, Florida Statutes, the Schedule of Capital Improvements may be adjusted by ordinance not deemed to be an amendment to the Comprehensive Plan for corrections, updates, and modifications concerning costs; revenue sources; acceptance of facilities pursuant to dedications which are consistent with the plan; or the date of construction of any facility enumerated in the Schedule of Capital Improvements. Policy 9.1.3.3 - The County shall adopt a capital budget as part of the annual budgeting process that includes all the capital improvements projects listed in the Schedule of Capital Improvements for expenditure during the appropriate fiscal year, except that the County may omit from its annual budget any capital improvements for which a binding agreement has been executed with another party to provide the same project in the same fiscal year. Policy 9.1.3.4 - The County shall utilize the following implementation schedule to aid state requirements for annual updates and to ensure level of service standards are maintained: • Preliminary meetings discussion of capital improvement need during Strategic Planning Committee meeting in November. • Prepare capital improvement plan in coordination with County budget for approval in April. • Capital improvement plan/budget workshop in July with the Board of County Commissioners for discussion of proposed projects and financing • Public hearing on capital improvement plan/budget in September. • Revise Schedule of Capital Improvements and update Capital Improvement Element in October St. Lucie County 9-9 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs Objective 9.1.4: Coordinate land use decisions and available or projected fiscal resources with a schedule of capital improvements that maintains adopted Level of Service Standards and meets existing and future facility needs. Policy 9.1.4.1 - All Category A public facility capital improvements shall be consistent with the goals, objectives and policies of the appropriate elements of this Comprehensive Plan. Policy 9.1.4.2 - The County shall integrate its land use planning and decisions with its plans for public facility capital improvements by using the policies listed in this section of the Capital Improvements Element. The location of, and Level of Service provided by projects in the Schedule of Capital Improvements shall maintain adopted standards for Levels of Service for existing and future development in a manner and location consistent with the Future Land Use Element of this Comprehensive Plan. Individual land use decisions shall be consistent with the Comprehensive Plan and the ability of the County to provide and maintain Level of Service. Policy 9.1.4.3 - The County shall continue to implement its Land Development Code for adequate public facilities to provide for a system of review of various applications for development orders which applications, if granted, would impact the Levels of Service of Category A and issue Certificates of Capacity. Such system of review shall assure that no final development order shall be issued which results in a reduction in the Levels of Service. The Land Development Code shall address the following, at a minimum, in determining whether a development order can be issued. A. No final development order shall be issued by the County unless there shall be sufficient capacity of Category A public facilities to meet the standards for Levels of Service for the existing and committed development and for the proposed development according to the following deadlines: 1) Prior to the issuance of a building permit for the following public facilities: (a) Potable water. (b) Sanitary sewer. (c) Solid waste. 2) Prior to the issuance of the building permit, assurance as to the completion for the following public facilities within the next twelve months must be provided: (a) Arterial and collector roads. (b) Storm water management. B. The capacity of Category A public facilities shall be determined for preliminary development orders according to one of the following: 1) The applicant may request a determination of such capacity as part of the review and approval of the preliminary development order provided that: (a) The determination that such capacity is available shall apply only to specific uses, densities, and intensities based on information provided by the applicant, and included in the development order, and (b) The determination that such capacity is available shall be valid for development that is completed within a period: (1) Not to exceed two years, or (2) Any period of time acceptable to the County and the applicant, provided that the period of time is explicitly set forth in a binding development agreement as authorized by Florida Statutes, and the applicant provides one or more of the following assurances, St. Lucie County Comprehensive Plan 9-10 Adopted 4.2.2019 Capital Improvements GOPs acceptable to the County in form and amount, to guarantee the applicant's pro rata share of the County's financial obligation for public facilities which are constructed by the County for the benefit of the subject property: [a] Performance bond, [b] Irrevocable letter of credit, [c] Prepayment of impact fees, [d] Prepayment of capacity (i.e., prepayment of capacity connection charges), or [e] Formation of a Community Development District pursuant to Chapter 190, Florida Statutes. (c) Whenever an applicant's pro rata share of a public facility is less than the full cost of the facility, the County shall do one of the following: (1) Contract with the applicant for the full cost of the facility, including terms regarding reimbursement of the applicant for costs in excess of the applicant's pro rata share, or (2) Obtain assurances similar to those in subsection (b)[2] from other sources, or (3) Amend this Comprehensive Plan to modify the adopted standard for the Level of Service so as to reduce the required facility to equal the applicant's needs. (d) Pursuant to (a) and (b), above, no further determination of capacity for the subject property shall be required prior to the expiration of the determination of capacity for the preliminary development order, except that any change in the density, intensity or land use that requires additional public facilities or capacity is subject to review and approval or denial by the County. The determination of capacity for the preliminary development order shall be considered a reservation of capacity until the end of the time periods specified in Policy 9.1.4.3.(B)(1)(b) above, or until the County is notified in writing by the applicant that the project will not be undertaken during those time periods and that the applicant voluntarily yields the reserved capacity. Public facility capacity that is determined to be available pursuant to this subsection shall be reserved on behalf of the preliminary development order in such a manner as to prevent the overuse or over commitment of the same public facility capacity. (1) Notwithstanding the procedures outlined in Policy 9.1.4.3.(B)(1), all approvals at the preliminary development order stage shall include a condition that the final development order containing a specific plan for development, including the densities and intensities of development, will not be issued unless public services and facilities exist or are assured to be available to meet or exceed the Level of Service Standards concurrent with the impacts of development. (2) The applicant may elect to request approval of a preliminary development order without a determination of capacity of Category A public facilities provided that any such order is issued subject to requirements in the applicable land development regulation or to specific conditions contained in the preliminary development order that: (e) Final development orders for the subject property are subject to a St. Lucie County 9-11 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs determination of capacity of Category A public facilities, (f) No rights to obtain final development orders, nor any other rights to develop the subject property have been granted or implied by the County's approval of the preliminary development order without determining the capacity of public facilities. (g) Applicants for development orders may offer to provide public facilities at the applicant's own expense in order to ensure sufficient capacity of Category A public facilities, as determined according to Paragraphs a and b, above. Development orders may be issued subject to the provision of public facilities by the applicant subject to both of the following requirements: (1) The County and the applicant enter into an enforceable development agreement which shall provide, at a minimum, a schedule for construction of the public facilities and mechanisms for monitoring to insure that the public facilities are completed concurrent with the impacts of the development, or the development will not be allowed to proceed. (2) The public facilities are contained in the Schedule of Capital Improvements of the Comprehensive Plan. (h) If public facilities are provided at an applicant's own expense, as allowed in subparagraph (c) above, the facility shall not be provided later than the fiscal year for which that facility was programmed in the Schedule of Capital Improvements. Policy 9.1.4.4 - A preliminary development order is defined as a DRI Development approval, zoning approval, preliminary plat approval, preliminary development plan approval, Plan amendment approval, preliminary Planned Unit Development approval, or any other development order other than a final development order and for which there are not found to be any impacts of development. Policy 9.1.4.5 - The impacts of development on public facilities within St. Lucie County are found to occur at the same time as development authorized by a final development order. The Board defines final development order as a building permit, conditional use approval, Board of Adjustment approval, or any other development order which has an immediate and continuing impact upon the infrastructure. The County shall determine, prior to the issuance of final development orders, whether or not there is sufficient capacity of Category A public facilities to meet the standards for Levels of Service for existing population and the proposed development concurrent with the proposed development. Policy 9.1.4.6 - The Land Development Code of the County shall provide that applications for development orders that are denied because of insufficient capacity of public facilities may be resubmitted after a time period to be specified in the Land Development Code. Such time period is in lieu of, and not in addition to, other minimum waiting periods imposed on applications for development orders that are denied for reasons other than lack of capacity of public facilities. Land Development Code shall require that development commence within a specified time after a development order is issued, or the development order shall expire, subject to reasonable extensions of time based on criteria included in the regulations. The Land Development Code also shall provide for the County to reserve capacity for approved final development orders for a specified period of time. St. Lucie County Comprehensive Plan 9-12 Adopted 4.2.2019 Capital Improvements GOPs Policy 9.1.4.7 - Impact fee ordinances shall require the same standard for the Level of Service as is required by the Comprehensive Plan. Policy 9.1.4.8 - The annual budget shall include in its capital appropriations all projects in the Schedule of Capital Improvements that are planned for expenditure during the next fiscal year. Policy 9.1.4.9 - The County's annual multiyear Capital Improvement Program (CIP) shall be prepared in conjunction with the annual review and update of the Capital Improvements Element. The CIP shall contain all of the projects listed in the updated Schedule of Capital Improvements. Policy 9.1.4.10 - The Capital Improvements Element shall be reviewed and updated annually. Beginning in April of each year, the element shall be updated in conjunction with the County's budget process and the release of the official population estimates and projections by the Office of Economic and Demographic Research (OEDR). Projections from the Bureau of Economic and Business Research (BEBR) of the University of Florida may be utilized as well. The update shall include: A. Revision of population projections to reflect both the official projections from OEDR and formally adopted local estimates prepared by the Planning and Development Services Department, B. Update of inventory of public facilities, C. Update of costs of public facilities, D. Update of Public Facilities Requirements analysis (actual Levels of Service compared to adopted standards), E. Update of revenue forecasts, F. Revision and development of capital improvement projects for the next five fiscal years, G. Update of analysis of financial capacity, and H. Update of analysis of any pending public education facility impacts on infrastructure. I. Review of relevant data and science for storm events, storm surge and flooding. Evaluation of the costs and benefits of adaptation alternatives in the location and design of new infrastructure as well as the fortification or retrofitting of existing infrastructure. J. Review of the most energy efficient technologies available and cost savings related to reduced energy needs, operations and maintenance saved. Policy 9.1.4.11 - The County shall establish and maintain a Concurrency Implementation and Monitoring System. The System shall consist of the following components: A. Annual report on the capacity and Levels of Service of public facilities. This report will function as a public information source to summarize the actual capacity of public facilities, and forecast the capacity of public facilities for each of the five succeeding fiscal years. The report shall be prepared in conjunction with the updated Schedule of Capital Improvements. The annual report shall also summarize and forecast capacities and Levels of Service for comparison to the standards adopted in the Capital Improvement Element, but such portion of the annual report shall be for information purposes only and shall not pertain to the issuance of development orders by the County. B. Public Facility Capacity Review. A separate record shall be maintained during each fiscal year to indicate the cumulative impacts of all development orders approved St. Lucie County 9-13 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs during the fiscal year-to-date on the capacity of public facilities as set forth in the most recent annual report on capacity and Levels of Service of public facilities. C. Concurrency Implementation Strategies. The County shall annually review the concurrency implementation policies that are incorporated in this Capital Improvements Element: (1) Standards for Levels of Service are phased to specific fiscal years in order to provide clear, unambiguous standards for issuance of development orders. (2) Standards for Levels of Service are applied within appropriate geographical areas of the County. Standards for County -wide public facilities are applied to development orders based on Levels of Service throughout the County. Standards for public facilities that serve less than the entire County are applied to development orders on the basis of Levels of Service within assigned service areas. (3) Standards for Levels of Service are applied according to the timing of the impacts of development on public facilities. Final development orders, which impact public facilities in a matter of months, are issued subject to the availability of water, sewer, and solid waste facilities prior to the issuance of the building permit, and other public facilities (i.e., roads, parks, and drainage) must be available within twelve months of the issuance of the building permit. Preliminary development orders can be issued subject to public facility capacity, but the capacity determination expires in two years. As an alternative, the determination of public facility capacity for preliminary development orders can be waived with an agreement that a capacity determination must be made prior to issuance of any final development order for the subject property. Such a waiver specifically precludes the acquisition of rights to a final development order as a result of the issuance of the preliminary development order. (4) Levels of Service are compared to adopted standards on an annual basis. Annual monitoring is used, rather than case -by -case monitoring, for the following reasons: a) annual monitoring corresponds to annual expenditures for capital improvements during the County's fiscal year; b) annual monitoring covers seasonal variations in Levels of Service; and c) case -by -case monitoring would require applicants for development orders or the County to conduct costly, time-consuming research which would often be partially redundant of prior research, or involve disparate methodologies and produce inconsistent results. (5) Public facility capital improvements are prioritized among competing applications for the same amount of facility capacity according to the criteria in the Capital Improvements Element. If any applications have to be deferred to a future fiscal year because of insufficient capacity of public facilities during the current fiscal year, the applications to be deferred will be selected on the basis of rational criteria as determined by the Board of County Commissioners. St. Lucie County Comprehensive Plan 9-14 Adopted 4.2.2019 Capital Improvements GOPs COASTAL HIGH HAZARD AREAS Objective 9.1.5: The County shall protect the coastline and avoid loss of life and property in coastal areas by minimizing land development and public facilities in coastal high hazard areas. Policy 9.1.5.1 - Publicly funded infrastructure shall not be constructed within the Coastal High Hazard Area unless the expenditure is for: A. Restoration or enhancement of natural resources or public access; B. Land application of treated effluent disposal (irrigation) on public and private open spaces; C. Flood -proofing water and sanitary sewage facilities; D. The development or improvement of a facility which will serve a crucial need by ameliorating the evacuation time of residents of the County; E. Reconstruction of seawalls that are essential to the protection of existing public facilities or infrastructure; F. The retrofitting of stormwater management facilities for water quality enhancement of stormwater runoff; or G. Port facilities. SCHEDULE OF CAPITAL IMPROVEMENTS The following tables show the Capital Improvements for the FY 2017/18 - FY 2021/22 period. From the St. Lucie County Capital Improvements Plan FY 2017/18-2021/22. St. Lucie County Comprehensive Plan 9-15 Adopted 4.2.2019 Capital Improvements GOPs ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021122 WATER 8r SEWER PROJECTS PROJECT NAME FUNDING SOURCE FY 2017/18 FY2018119 FY2019120 FY2020/21 FY2021/22 TOTAL FY2018-2022 US1 Water Main in SLCU Services Area Capital Facilities Fund $ - $ - $ 123,000 $ 1,108,000 $ - $ 1.231,000 Taylor Dairy Road 30 inch Water Main Capital Facilities Fund $ - $ - $ 460,000 $ - $ 460,000 Miramar & Indrio Rd 24 Inch Water Main Capital Facilities Fund $ - $ - $ 156,000 $ 1,407,000 $ - $ 1,563,000 Rangeline Road Water Main Capital Facilities Fund $ - $ - $ - $ 250,000 $ - $ 250,000 Interconnect North Hutchinson Island Farce Mains Capital Facilities Fund $ - $ - $ 300,000 $ - $ 300,000 North Hutchinson Island Chloramines Capital Facilities Fund $ - $ - $ 123,000 $ 1,108,000 $ - $ 1,231,000 booster Station North County Water Reclamation Facilit Capital Facilities Fund $ - $ - $ 8,750,000 $ 8,000,000 $ - $ 16,750,000 Indrio Rd Force Main Capital Facilities Fund $ $ 56,300 $ 1,406,700 $ $ 1,463.000 North County Water Treatment Plant Capital Facilities Fund $ $ - $ 8,600,000 $ 7,350,000 $ _ $ 15,950,000 Central County Wastewater Capital Facilities Fund $ 310,579 $ $ 3,000,000 $ 2,000,000 $ $ 5,310,579 Treatment Plant Central County Wastewater Capital Facilities Fund $ $ - $ 718,000 $ 588,000 $ - $ 1,306,000 Treatment Plant NHI Septic Removal Project Operations $ 186,895 $ $ 6,000,000 $ 4,500,000 $ $ 10,686,895 Fairgrounds Water Storage Tank Capital Facilities Fund $ $ $ 500,000 $ 1,300,000 $ $ 1,800,000 NHI Clarifier Rebuild Renewal & Replacement $ 25,000 $ 30,000 $ $ $ $ 55,000 Fund N County Service Capital Facilities Fund $ $ - $ 1,300,000 $ $ 1,300,000 Area Aquifer Wells Renewal & Replacement NHI Water Distribution Fund $ 15,993 $ $ 1,080,000 $ 1,500,000 $ $ 2,595,993 Replace ant Fairwinds WWTP Capital Facilities Fund $ 50,000 $ $ - $ - $ $ 50,000 Expansion Bulk Water Connect Capital Facilities Fund $ - $ $ - $ 384,000 $ $ 384,000 with FPUA No Cc Pump at Holiday Pines Water Capital Facilities Fund $ - $ - $ 150,000 $ - $ - $ 150.000 Treatment No Cc Pump at Holiday Pines Water Capital Facilities Fund $ - $ - $ 850,000 $ 700,000 $ - $ 1,550.000 Treatment _ Turnpike Feeder Road Force Main Capital Facilities Fund $ - $ - $ 64,000 $ 582,000 $ - $ 646,000 Airport 12 in Water Main North Capital Facilities Fund $ - $ - $ 59,000 $ 530,000 $ - $ 589,000 Airport 12 in Water Main South Capital Facilities Fund $ - $ - $ 180,000 $ 1.630,000 $ - $ 1,810,000 North Hutchinson Renewal & Replacement Island Lift Station Fund $ - $ $ - $ B00,000 $ - $ 800,000 Pum Replacement North Hutchinson Island Force Main Renewal &Replacement $ Fund $ $ - $ 855,000 $ $ 655,000 Replacement South Hutchinson Island Force Main Renewal & Replacement $ _ Fund - $ $ $ 214,000 $ - $ 214,000 Replacement Turnpike Feeder Road Water Main Capital Facilities Fund $ - $ - $ 45,000 $ 408,000 $ - $ 451,000 SCADA and PLC Renewal & Replacement $ 50,000 $ $ $ $ $ 50,000 U Upgrades Fund SHI Force Main Air Renewal &Replacement Release Valve Fund $ 38,000 $ $ $ $ $ 38,000 Replacement SHI Return Activated Renewal & Replacement Sludge Pump and Fund $ 125,000 $ - $ - $ - $ - $ 125.000 Piping Replacement SHI Infrastructure Renewal & Replacement $ 7D,D00 $ - $ - $ $ - $ 70,000 Re lacement Fund SHI Lift Station Piping Renewal & Replacement and Valve Fund $ 60,000 $ - $ - $ - $ - $ 60,000 Replacement North County Water & Wastewater Line Capital Facilities Fund $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000 Extension _ TOTAL $ 1,131,467 $ 286,300 $ 34,064,700 $ 35,412,000 $ 200,000 $ 71,094,467 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 St. Lucie County 9-16 Comprehensive Plan Adopted 4.2.2019 Capital Improvements GOPs ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 SOLID WASTE PROJECTS PROJECT NAME FUNDING FY 2017/18 FY2018119 FY2019/20 FY2020/21 FY2021/22 TOTAL FY2018 - 2022 SOURCE Landfill Phase 4 Cell Construction Sanitary Landfill $ 6,224,249 $ 1.340,000 $ $ $ $ 7.564,249 Household Hazardous Waste Sanitary $ 54,142 $ - $ $ $ $ 54,142 Building. Landfill Phase III B Partial Closure Sanitary $ 1,456,742 $ 380,842 $ $ $ $ 1,837,584 Landfill TOTAL $ T,735,133 $ 1,720,842 $ - $ - $ - $ 9,455,975 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 ADOPTED CAPTTAI IMPPnVFMFNT PLAN' FY 2017/18 TO FY 2021/22 DRAINAGE PROJECTS ANTICIPATED TOTAL PROJECT NAME FUNDING SOURCE FY 2017118 FY2018/19 FY2019/20 FY2020121 FY2021/22 NEEDS FY2018 2022 Midway Rd at NSLWCD Drainage $ 15,000 $100,000 $ $ $ $ $ 115,000 Canal 92 Culvert Maintenance MSTU - - Re0acement Ideal Holding Rd at Drainage $ 60,000 $ - $ - $ - $ - $ - $ 60,000 NSLRWCD Canal 77 Culvert Maintenance MSTU So Header Canal Rd at Drainage $ 15,000 $ 250,000 $ - $ - $ - $ - $ 265,000 NSLRWCD Canal 72 Culvert Maintenance MSTU ` Selvitz Rd at NSLRWCD Drainage $ 115,000 $ 250,000 $ - $ - $ - $ - $ 365,000 Canal 102 Culvert Maintenance MSTU Replacement So Header Canal Rd at Drainage $ 15,000 $ 250,000 $ - $ - $ - $ - $ 265,000 NSLRWCD C68 Culvert Maintenance MSTU Midway Rd Cross Drain E Drainage $ 40,0t&7 $ - $ - $ - $ - $ - $ 40,DW Savannas Park Entrance Maintenance MSTU Midway Rd Cross Drain E Drainage $ 250,000 $ - $ - $ - $ - $ - $ 250,000 Silver Oak or Maintenance MSTU Midway Rd at NSLRWCD Drainage $ 40,000 $ - $ - $ - $ - $ - $ 40,000 Canal 22 Maintenance MSTU Emergency/Unanticipated Drainage $ 45.000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ - $ 1,045,000 Culverts Maintenance MSTU Johnston Road at FPFWCD Drainage $ 250,000 $ - $ - $ - $ $ $ 250,000 Canal 16 Maintenance MSTU Rack Rd at NSLRWCD Canal Drainage $ 15,000 $ 250,000 $ - $ $ - $ - $ 265,000 48 Maintenance MSTU Farmers Mktat7th St Ditch Drainage $ 107,872 $ - $ $ $ $ $ 107,872 Culvert Replacement Maintenance MSTU Oleander Ave Parallel Culvert Drainage $ 205.166 $ $ $ $ $ $ 205,166 Maintenance MSTU Orange Avenue at Drainage $ 814,826 $ $ $ $ $ $ 814,826 NSLRWCD Canal 54 Maintenance MSTU Pulizerl Russo Rd at FPFWCD Canal Drainage $ 150,000 $ $ $ $ $ $ 150,000 6 Culvert Maintenance MSTU Indian River Ests Drainage Gas Taxes $ 100,000 $ $ $ $ $ $ 00,000 Phase II Indian River Ests Drainage Drainage $ 100,000 $ $ $ $ $ $ 100,000 Phase III Maintenance MSTU Indian River Ests Drainage Gas Taxes $ 50,000 $ - $ - $ - $ - $ - $ 50,000 Phase III _ Indian River Baffle Boxes Drainage $ 15,197 $ - $ $ - $ - $ - $ 15,197 Maintenance MSTU Paradise Park Phase 4 Drainage $ 145,497 $ - $ - $ $ - $ - $ 145,497 Maintenance MSTU Paradise Park Drainage- Grant Funds $ 143,036 $ $ $ $ $ $ 143,036 Phase 5 Paradise Park Drainage- Grant Funds $ 92,760 $ $ $ $ $ $ 92,760 Phase 5 Paradise Park Drainage- Drainage $ 619,683 $ - $ $ - $ - $ - $ 619,683 Phase 5 Maintenance MSTU Platts Creek Preserve Drainage $ 600 $ - $ $ - $ - $ - $ 600 Maintenance MSTU Platts Creek Preserve Drainage $ 910 $ $ $ $ $ $ 910 Maintenance MSTU Platts Creek Preserve Gas Taxes $ 245,713 $ - $ - $ - $ - $ - $ 245,713 Platts Creek Preserve Capital Financing $ 60,B20 $ - $ - $ $ $ - $ 60,820 Melville Rd Stormwater I Drainage $ 430,529 $ 150.000 $ 500,000 $ 500,000 $ - $ - $ 1,580,529 Master Plan Maintenance MSTU Melville Rd Stormwater Drainage $ 91,464 $ 150,000 $ 500,000 $ 500,000 $ - $ - $ 1,241,464 Master Plan Maintenance MSTU San Lucie Stormwater Master Drainage $ - $ - $ - $ 500.000 $ 500,000 $ $ 1,000,000 Plan Maintenance MSTU San Lucie Drainage Grant Funds $ 400,000 $ $ - $ - $ $ $ 400,000 Improvement -Phase II _ St. Lucie County 9-17 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs San Lucie Drainage Drainage $ 250,325 $ 40,000 $ 250,000 $ - $ 590,000 $ - $ 1,380.325 Improvement -Phase II Maintenance MSTU White City Drainage Citrus & Drainage $ 50,000 $ - $ - $ - $ - $ - $ 50,000 Sa2Uer Phase I Maintenance MSTU Harmony Heights Phase I Drainage $ 511,838 $ - $ - $ - $ - $ - $ 511,838 Maintenance MSTU Angle Rd Drainage Project Drainage $ 75,000 $ $ $ $ $ $ 75,000 Maintenance MSTU Easy St Canal 17 Drainage $ 50,000 $ $ $ $ $ - $ 50,000 Maintenance MSTU White City Canals F & G Drainage $ $ $ $ $ 100,000 $ 10,900,005 $ 11.000,000 Maintenance MSTU _ Sunland Gardens Drainage $ - $ $ $ - $ 200,000 $ 24,800,000 $ 25,000,000 Neighborhood Im rovement Maintenance MSTU Harmony Heights Drainage Drainage $ - $ - $ 250,000 $ - $ 250,000 $ 8,000,000 $ 8,750,000 Improvement Ph 2-5 Maintenance MSTU Wet Detention Pond Retrofit Drainage $ - $ - - $ - $ - $ - $ 1,000,000 $ 1,000,000 Program - TMDL Maintenance MSTU St Lucie Estuary / Indian Drainage $ - $ - $ - $ - $ - $ 9,500,OD0 $ 9,500,000 River Lagoon - TMDL Maintenance MSTU Koblegard Rd at FPFWCD Drainage $ - $ - $ • $ 15,000 $ 150,000 $ - $ 165,000 Canal13 Maintenance MSTU Koblegard Rd at FPFWCD Drainage $ $ - $ $ 15,000 $ 150,000 $ $ 165,000 Canal 12 Maintenance MSTU Koblegard Rd at FPFWCD Drainage $ - $ 15,000 $ 150,000 $ $ - $ - $ 165,000 Canal 11 Maintenance MSTU Koblegard Rd at FPFWCD Drainage $ $ - $ 15,000 $ $ $ $ 165,000 Canal 10 Maintenance MSTU South Header Canal Rd at Drainage $ $ - $100,000 $ $ $ $ 100.000 Canal 69 Maintenance MSTU South Header Canal Rd at Drainage $ - $ 100,000 $ - $ - $ - $ - $ 100,000 Canal 66 Maintenance MSTU South Header Canal Rd at Drainage $ - $ 100,000 $ - $ - $ - $ - $ 100,000 Canal 65 Maintenance MSTU Midway Rd at NSLRWCD Drainage $ 50,000 $ $ - $ $ - $ - $ 50,000 Canal 93 Maintenance MSTU San Lucie Stormwater Phase Drainage $ 178.223 $ 150,000 $ 200.000 $ - $ 150,000 $ 8,376,223 $ 9,052,446 3 Maintenance MSTU Orange Ave & Rock Rd - Drainage -$ 30,000 $ - $ - $ $ - $ - $ 30,000 Culvert Maintenance MSTU Summit St at NSLRWCD Drainage $ 205,000 $ - $ - $ - $ - $ • $ 205,000 Culvert 8 Maintenance MSTU TOTALi 1 $ 6,032,458 $2,055,000 $ 2,215,000 1 $ 2,430,000 $ 2,340,000 $ 62,576,223 $ 77,648,681 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 ROADWAY PROJECTS PROJECT NAME FUNDING FY 2017N8 FY2018N9 FY2019l20 FY2020l21 FY2021122 ANTICIPATED TOTAL SOURCE NEEDS FY2018-2022 Midway Rd (Selvitz Impact Fees $ 36,428 $ $ $ $ $ $ 36,428 Rd - 25th St Midway Rd (Selvitz Impact Fees $ 1,457,648 $ - $ - $ - $ - $ $ 1,457,648 Rd - 25th St Midway Rd (Selvitz Capital $ 382,953 $ $ $ $ $ $ 382,953 Rd - 25th St) Financing Glades Rd & Selvitz Impact Fees $ 156,558 $ - $ - $ - $ - $ - $ 156,558 PD &E Stud Kings Hwy and Indrio Grant Funds $ 15,962,836 $ - $ $ $ - $ - $ 15,962,836 Rd Widening Kings Hwy and Indrio Impact Fees $ 1,429,104 $ - $ - $ - $ - $ - $ 1,429,104 Rd Widening Kings Hwy and Indrio Capital $ 532,168 $ - $ - $ - $ - $ - $ 532,168 Rd Widening Financing Kings Highway Impact Fees $ 150,000 $ - $ - $ - $ - $ - $ 150,000 Widening Whispering Oaks Impact Fees $ 110,000 $ - $ - $ - $ - $ - $ 110X0 Offsite Improvements Unincorporated Bike Gas Taxes $ 192,752 $ $ $ - $ - $ - $ 192,752 Paths / Sidewalks S. 25th St Bridge - Impact Fees $ 100,000 $ $ $ $ $ $ 100,000 East Side Carlton Road Bridge Gas Taxes $ 50,000 $ $ $ $ $ $ 50,000 over SFWMD Canal 24 Glades Cut -Off Road Gas Taxes $ 50,000 $ - $ - $ - $ - $ - $ 50,000 Bridge over SFWMD Canal 24 Bridge at Gas Taxes $ 36,073 $ - $ $ $ - $ - $ 36,073 McCarty/Ten Mile Creek North Gordy Road Bridge Gas Taxes $ 100,000 $ $ $ $ $ $ 100,000 Midway Rd - 2600' E Gas Taxes $ 21,676 $ - $ $ $ - $ - $ 21,676 of Shinn Rd Airport Connector Impact Fees $ 1,700,000 $ $ 2,500,000 $ $ 2,500,000 $ 11,300,000 $ 18,000,000 (Turnpike to Kings Hi hwa t St. Lucie County 9-18 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs Selvitz Rd (Glade Impact Fees $ $ $ $ $ 1,000,000 $ 8,300,000 $ 9.300,000 Cutoff to Edwards Glades Cutoff Rd Impact Fees $ - $ - $ - $ $ 3,000,000 $ 67,100,000 $ 73,100,000 Commerce to Selvitz Jenkins Rd (Midway Impact Fees $ $ 3,500,000 $ $ $ 3,000,000 $ 117,100,000 $123,600,000 to St Lucie Blvd? Juanita Ave Phase 3 Impact Fees $ 450.000 $ $ $ $ $ 450,000 (Juanita to Bridge- US1 St James SW (Royce Impact Fees $ - $ - $ 260,000 $ - $ - $ - $ 260,000 to Lazy River Oleander Ave SW Impact Fees $ - $ $ - $ $ 1,323,840 $ - $ 1,323,840 (Midway to Saeger), Weatherbee Rd SW Impact Fees $ $ $ $ $ 445,220 $ $ 445,220 (US1 to Oleander Ave Walton Rd SW Impact Fees $ $ $ $ $ 632,730 $ - $ 632,730 (Lennard to Green River Parkway) Midway Rd -Glades Impact Fees $ 672 $ • $ - $ - $ - $ 25,000,000 $ 25,000.672 Cutoff/Selvitz Rd CIP Projects To Be Development $ 1,497,246 $ $ $ $ $ $ 1,497,246 Determined Fees TOTAL $ 23,966,113 _ $ 3,950,000 $ 2,760,000 $ 3,000,000 $ 11,901,790 $ 228,800,000 $ 274,377,903 Source: St. Lucie County Capital Improvements Plan FY 2017118-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 TRANSIT PROJECTS PROJECT NAME FUNDING SOURCE FY 201711B FY2018111 FY2019120 FY2020121 FY2021122 TOTAL FY2018 - 2022 Bus Shelter -Gatlin Blvd Public Transit MSTU $ 8,312 $ $ $ $ $ 8,312 Bus Shelter -Prima Vista Grant Funds $ 12,165 $ $ $ $ $ 12,165 Bus Shelter -Ravenswood Ln Grant Funds $ 15,951 $ - $ - $ - $ - $ 15,951 Selvitz Rd. Transit Admin. Bldg. Grant Funds $ 292 S53 $ - $ - $ - $ - $ 292,553 Bus Sheleter at Cashmere Blvd Public Transit MSTU $ 26,336 $ - $ - $ $ - $ 26.336 Bus Sheleter at Delaware and 32nd St Public Transit MSTU $ 26,510 $ - $ - $ $ - $ 26,510 Bus Sheater at Juanita Ave and Essex or Public Transit MSTU $ 41,309 $ $ $ $ $ 41,309 TOTAL $ 423,136 $ - $ - $ - $ - $ 423,136 Source: Source: St. Lucie County Capital Improvements Plan FY 2017116-21UI21/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021122 AIRPORT PROJECTS PROJECT NAME FUNDING SOURCE FY 2017/18 FY2018119 FY2019/20 FY2020/21 FY2021122 TOTAL FY2018 - 2022 AP Design/Construct Customs Grant Funds $ 297,077 $ - $ - $ - $ - $ 297,077 Renovation _ AP Parallel Runway Taxiway Grant Funds $ 730,990 $ $ $ $ $ 730,990 Connector A/P-Sec Cameras/High Mast Grant Funds $ 115,850 $ $ $ $ $ 115,850 Lighting Airport Ent2ffay Project Grant Funds $ 300,000 _ $ - $ - $ - $ - $ 300,000 Micro surface Runway 14/32 Grant Funds $ 1,139,850 $ $ $ $ $ 1,139,850 AP Rehab Taxiway D-1 Grant Funds - $ 420,000 $ $ - $ - $ - $ 420,000 AP Drainage and Erosion Airport Fund $ 40,000 $ 40,000 $ - $ - $ - $ 80,000 Control ImLrovements --Airport $ 9,000 $ $ $ $ $ 9,000 Design and Install Segmented Fund Circle Construct Terminal Service Airport Fund $ 147,800 $ $ $ $ $ 147,800 Parkin Construct Terminal Service Grant Funds $ 562,712 $ $ $ $ $ 562,712 Parkin Install Segmented Circle Runway Airport Fund $ 15,000 $ $ - $ - $ - $ 15,000 10L/28R Create North Parallel Taxiwa Air ort Fund $ $ $ - $155,600 $ - $ 155,600 Security Perimeter Fencing and Airport Fund $ - $ 64,500 $ 64,500 $ - $ $ 129,000 Access Control Airport Security Improvement Grant Funds $ 77,375 $ - $ - $ - $ - $ 77,375 Install and Rehab AP NVAIDS Grant Funds $ 632,15711 $ $ $ $ $ 632,871 AP-10U28R S Apron Design and Grent Funds $ 455,551 $ $ $ $ $ 455,551 Construction Lengthen Runway I OR128L Aircort Fund $ $ $ - $ 183,986 $ - $ 183 986 Noise Operations Monitoring Airport Fund $ - $ - $ - $ $ - $ 160,000 System _ St. Lucie County 9-19 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs MRO Hangar Airport Fund $ $ $ $ $ $ 27,500 MRO Hangar Grant Funds $ - $ - $ - $ - $ - $ 1,500,000 MRO Hangar Grant Funds $ $ $ $ $ $ 3,527,500 Airfield Signage and Lighting Update Airport Fund $ - $ 45,000 $ 45,000 $ - $ - $ 90,000 Study for Proposed North Industrial Park Airport Fund $ $ $ $ $ $ 200.000 Runway 14/32 Airfield Lighting and Si na e U ate Airport Fund $ - $ - $ 20,000 $ 20,000 $ - $ 40,000 TOTAL $ 10,359,076 $ 149,500 $ 129,500 $ 359,586 $ - $ 10,997,662 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 PORT OF FORT PIERCE PROJECTS PROJECT NAME NG FY 2017118 FY2018119 FY2019120 FY2010}31 FY2021122 TOTAL2022 2016 SOURCE N. Entrance To Port of Grant Funds $ 280,947 $ $ $ $ - S 280 947 Ft. Pierce N. Entrance To Port of Grant Funds $ 3,167,346 $ $ $ $ $ 3 167 345 Ft. Pierce _ Land Appraisal Port Fund $ 2,900 $ $ $ $ $ 2,900 Redevelopment of Capital Financing $ 1,387,500 $ $ $ $ $ 1,357,500 Fisherman's Wharf _ Redevelopment of Grant Funds $ 300,000 $ - $ - $ - $ - $ 300,000 Fisherman's Wharf Redevelopment of Grant Funds $ 696,000 $ - $ - $ $ - $ 696,000 Fisherman's Wharf Redevelopment of Grant Funds $ 510,000 $ - $ - $ - $ - $ 510,000 Fisherman's Wharf Redevelopment of Grant Funds $ 115,676 $ $ $ $ $ 115,676 Fisherman's Wharf Harbor Pointe Capital Financing $ 250,000 $ - $ - $ $ - $ 250,000 Devolopmeril TOTAL $ 6,710,369 $ - $ - $ - $ - $ 6,710,369 Source: St. Lucie County Capital Improvements Plan FY 2017118-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 PARKS & RECREATION PROJECTS PROJECT NAME FUNDING SOURCE FY 2017l18 FY2018/19 FY2019l20 FY2020/21 FY2021122 TOTAL FY2018 -2022 Indrio Road Recreation Area General Fund $ 75,437 $ - $ - $ $ - $ 75,437 Sterling Facilities Services CIP Sports Complex Improvement Fund $ 146,381 $ - $ - $ - - $ - $ 146,381 John B. Parks Sports Complex - ADA Parks MSTU $ 169,477 $ - $ - $ - $ - $ 169,477 Pepper ParkWildcat Cave Pier Boating Improvement Projects Fund $ 12,269 $ $ $ $ $ 12,269 North Causeway Boat Launch Facility Boating Improvement Projects Fund $ 239,451 $ - $ - $ - $ - $ 239,451 Pepper Park Renovation Grant Funds $ 132,248 $ - $ - $ - $ - $ 132,248 Pepper Park Renovation Parks MSTU $ 137.767 $ $ $ $ $ 137,767 Lincoln Park Community Center Improvements Impact Fees - Parks $ 25,116 $ - $ - $ - $ - $ 26,116 River Park Marina ADA Improvements Parks MSTU $ 50,000 $ - $ - $ - $ - $ 50,000 Lakewood Park ADA Playground Replacement Parks MSTU $ 6,740 $ - $ - $ - $ - $ 6,740 Golf Course Enclose Pavilion Parks MSTU $ 10,987 $ - $ - $ $ $ 10,987 South County Beach Park Restrooms Renovation Parks MSTU $ 189,483 $ 150,000 $ 150,000 $ $ 489,483 Equestrian Wash rack and Sewer Connection Impact Fees $ 223,110 $ - $ $ $ - $ 223.110 White City Park General Fund $ 285,970 $ - $ - $ - $ - $ 285,970 White City Park General Fund $ 336,242 $ - $ - $ - $ - $ 336,242 Sheraton Park Plaza Playground Parks MSTU $ 38,105 $ - $ - $ - $ - $ 38,105 New Fairground Restroom Impact Fees $ 400,000 $ - $ - $ - $ - $ 400,000 Adams Arena PA System Impact Fees $ 100,000 $ - $ - $ - $ - $ 100,000 New Upgrades to Electrical Panel Impact Fees $ 150,000 $ $ $ $ $ 150,000 St. Lucie County 9-20 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs Adams Arena Electrical Addition Impact Fees $ 60,000 $ $ $ $ $ 60,000 Riverpark Marina Trail Boardwalk Parks MSTU $ 25,000 $ - $ $ $ $ 25,000 Lakewood Baseball Irrigation and - Drainage Parks MSTU $ 100,000 $ 100,000 $ 100,000 $ - $ - $ 300,000 Lawnwood BF #5-6 Press Box Parks MSTU $ 125,000 $ $ $ $ $ 125,000 Lakewood Park Community Center Water Connection Parks MSTU $ 300,000 $ 250,000 $ $ $ $ 550,000 Golf Course Driving Range Tee Expansion Parks MSTU $ 85,000 $ $ 150,000 First Data Field Improvements Capital Financing $ 54,500,000 $ - $ $ $ $ 64,500,000 Pickleball Courts Parks MSTU $ 25.000 $ $ $ $ $ 25,000 Savanas Cam site Extension Parks MSTU $ 100,000 $ - $ $ $ $ 100,000 TOTAL $ 58,049,783 $ 535,000 $ 280,000 $ - $ - $ 58,864,783 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021/22 FACILITIES PROJECTS PROJECT NAME FUNDING SOURCE FY 2017/18 FY 2018119 FY 2019/20 FY 2020121 FY 2021122 TOTAL FY 2018 - 2022 TCERDA PARK - Capital Fund $ 340 $ - $ - $ - $ - $ 340 Research & Development TCERDA PARK- Capital Fund $ 3,883 $ $ $ $ $ 3,883 Research & Development TCERDA-BLDG Capital Fund $ 650,051 $ $ $ $ $ 650.051 SUNSHINE KITCHEN TCERDA-BLDG Grant Funds $ 1,791,735 $ $ $ $ $ 1,791,735 SUNSHINE KITCHEN Rock Road Jail/Medical Impact Fees - Law $ 250.000 $ - $ - $ - $ - $ 550.000 Wino Expansion (Design, Enforcement Rock Rd Jail- Upgrade Capital Financing $ 129,392 $ $ $ $ $ 129,392 Secunt S stem Admin Building Drainage General Fund $ 80,000 $ - $ - $ - $ - $ 80,000 Improvements Factlees Compound General Fund $ 50,000 $ - $ - $ - $ - $ 50,000 rovements Improvements Facilities Compound Mosquito Fund _ $ 25,000 $ $ $ $ $ 25,000 Improvements Facilities Compound Gas Taxes $ 25,000 $ $ $ $ $ 25,000 Improvements Courthouse Annex Air Court Facilities Fund $ 542,404 $ $ $ $ $ 542,404 Handler Replacement Guardian Ad IOffice Court Facilities Fund $ 330,000 $ $ $ $ $ 330,000 Space Project St Lucie County Admin County Capital $ 107,642 $ - $ - $ - $ - $ 107,642 Parking Lot Court Facilities Study Fine and Forfeiture $ 100.000 $ - $ - $ - $ - $ 100,000 Rosser Blvd Branch General Fund $ 21,538 $ - $ - $ - $ - $ 21,538 Libra - Renovation Rosser Blvd Branch Impact Fees - Library $ 108,844 $ - $ - $ - $ $ 108.844 Libra - Renovation TOTAL $ 4,215,829 $ - $ - $ $ 1 $ 4,215,829 Source: St. Lucie County Capital Improvements Plan FY 2017118-2021/22 ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017/18 TO FY 2021122 MOSQUITO CONTROL & COASTAL MANAGEMENT PROJECTS PROJECT NAME FUNDING SOURCE FY 2017/18 FY2018/19 FY2019/20 FY2020/21 FY2021/22 TOTAL FY2018 - 2022 Harbor Branch Preserve Riprap Project Phase 1 & 2 Mosquito Fund $ 200,000 $ 200,000 $ - $ $ - $ 400,000 Mosquito Compound Equipment Wash Station Filtration System Mosquito Fund $ 130,000 $ $ $ $ $ 130,000 Island Dune Culvert Re %cement IMP 10B Mosquito Fund $ 37,900 $ $ $ $ $ 37,900 Harbor branch Preserve Dike Im - rovement Mosquito Fund I $ 90,uro $ - $ - $ - $ - $ 90,000 70TAI $ 457,900 $ 200,000 $ - $ - $ - $ 657,900 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 St. Lucie County Comprehensive Plan 9-21 Adopted 4.2.2019 Capital Improvements GOPs ADOPTED CAPITAL IMPROVEMENT PLAN: FY 2017118 TO FY 2021/22 ENVIRONMENTAL LANDS PROJECTS PROJECT NAME FUNDING SOURCE FY 2017/18 FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 TOTAL FY 2018 - 2022 Heathcote Stormwater Park Environmental Land Acquisition Fund $ 220,398 $ - $ - $ $ - $ 220,398 Petravice Preserve Capital Financing $ 200,000 $ $ $ $ $ 200,000 St Lucie Village Boardwalk General Fund $ 1,650 $ - $ $ - $ - $ 1,650 St Lucie Village Boardwalk Capital Financing $ 28,350 $ $ $ $ $ 28,350 Ft. Pierce Mine _ Environmental Land Acquisition Fund $ 244,080 $ $ $ $ $ 244,080 Greenways and Trails Master Plan Environmental Land Acquisition Fund $ 89,745 $ $ $ $ $ 89,745 Florida Municipal Power Agency Land Preservation Agreement County Capital Fund $ 305,456 $ - $ - $ - $ - $ 305,456 Environmentally Safe Land Purchase Capital Financing $ 10,941 $ $ $ $ $ 10,941 Environmentally Safe Land Purchase Capital Financing $ 564,748 $ $ - $ $ - $ 564,748 IRL-S C23/24 Basin South Reservoir Capital Financing $ 1,000,000 $ - $ - $ - $ - $ 1,000,000 Raccoon Island Classroom General Fund $ 25,000 $ - $ - - $ $ - $ 25,000 Pole Barn at Platts Creek Shop General Fund $ 50,000 $ - $ - $ - $ $ 50,000 TOTAL $ 2,740,368 $ - $ - $ - $ - $ 2,740,368 Source: St. Lucie County Capital Improvements Plan FY 2017/18-2021/22 St. Lucie County 9-22 Adopted 4.2.2019 Comprehensive Plan Capital Improvements GOPs � k, ,