AN ORDER GRANTING A MINOR ADJUSTMENT TO THE FINAL 0
SN
PLANNED UNIT DEVELOPENT SITE PLAN FOR SUNSET BEACH
PUD, A 43-LOT SINGLE FAMILY RESIDENTIAL SUBDIVISION ON o
APPROXIMATELY 38.8 ACRES OF LAND IN ST. LUCIE COUNTY.
n
WHEREAS, the St. Lucie County Planning and Development Services Director has reviewed , o c
the request for a Minor Adjustment to the Final PUD Site Plan for the project known as Sunset I o 0
Beach PUD including the comments of the Development Review Committee, and has made the
following determinations:
SITE PLAN ADJUSTMENT
1. Lloyd S. Moody (President of WBC Collections, L.P.), represented by Richard
Ladyko, P.E., presented a petition for a Minor Adjustment to Final Planned Unit
Development (PUD) Site Plan consisting of 43 single family residential lots with
a recreational (swimming pool) amenity on approximately 38.8 acres, as
depicted on the attached map as Exhibit "A" and described in Part "A" below.
The site plan modifications include a restricted access gate and associated
vehicular turnaround for the planned subdivision, located on the project's
entrance road.
2. On June 2, 2009, the St. Lucie County Board of County Commissioners
through Resolution No. 09-026 granted Preliminary PUD Site Plan approval for
a single family subdivision consisting of 44 lots.
3. On January 26, 2010, the Growth Management Director through GM Order 10-
006 in accordance with Florida Statutes Community Renewal Act authorized a
Preliminary PUD Site Plan extension which expired on June 2, 2013.
4. On February 24, •2014, the Planning and Development Services Director in
accordance with Ordinance No. 2013-43 authorized a Preliminary PUD Site
Plan extension with an expiration date of June 2, 2015.
5. On June 2, 2015, the Board of County Commissioners through Resolution No.
15-091 granted a Major Site Plan Adjustment to the Preliminary PUD Site Plan.
This site plan adjustment resulted in an increase of lands due to changes in the
mean high water line, the reduction of one (1) single family residential lot, the
re-location of the common recreation amenity towards the center of the
development, and the re-location of the main access road to eliminate direct
wetland impacts.
PDS Order 2021-061
Page 1 File Number: SPMn — 12202025906
6. On November 1 , 2016 the Board of County Commissioners through Resolution
2016-190 granted Final PUD Site Plan approval and a Zoning Atlas
Amendment (Rezoning) from HIRD to PUD for a single family residential
development consisting of 43 lots with a recreational amenity on 38.8 acres.
7. On June 6, 2017, the Board of County Commissioners through Resolution
2017-127 granted a Major Adjustment to revise project entrance and the
relocate the recreational amenity based on an FDEP determination. A
Wetland Waiver approved 105 ft2 of direct impacts to wetlands associated
with the installation of pilings to support the proposed bridge structure and
0.94-acres of secondary impacts to the required 50 foot upland buffer.
8. On June 6, 2017, the Board of County Commissioners approved
Resolution 2018-127 which corrected the expiration date noted in Section
C° of Resolution 2017-127.
9. The St. Lucie County Development Review Committee has reviewed the Minor
Adjustment to Final PUD Site Plan for Sunset Beach PUD and found it to meet
all technical requirements. subject to the conditions set forth in Part A of this
Order and determined that the Minor Adjustment to Final PUD Site Plan
complies with criteria found in Sections 11.02.05 & 11.02.07 of the St. Lucie
County Land Development Code, and remains in substantial conformity with
the previous approved Preliminary/Final PUD Site Plan.
10. The proposed project is consistent with the general purpose, goals, objectives,
and standards of the St. Lucie County Land Development Code, the St. Lucie
County Comprehensive Plan and the Code of Ordinances of St. Lucie County.
11 . The proposed project will not have an undue adverse effect on adjacent
property, the character of the neighborhood, traffic conditions, parking, utility
facilities or other matters affecting the public health, safety and general welfare.
12. All reasonable steps have been taken to minimize any adverse effect of the
proposed project on the immediate vicinity through building design, site design,
landscaping and screening.
13. The proposed project will be constructed, arranged and operated so as not to
interfere with the development and use of neighboring property, in accordance
with applicable district regulations.
14. The proposed project will be served by Fort Pierce Utilities Authority water and
St. Lucie County Utilities wastewater.
NOW, THEREFORE, BE IT ORDERED:
PDS Order 2021-061
Page 2 File Number SPMn - 12202025906
A. Pursuant to 11.02.05 E. of the St. Lucie County Land Development Code, the Minor
Adjustment to the Final PUD Site Plan is hereby approved as shown on the
Adjusted Site Plan prepared by Richard Ladyko of Ladyko Design Group, dated
November 30, 2021, and date stamped by the Planning & Development Services
Department on December 2, 2021 subject to all previous conditions of approval
applicable to the subject project, as contained in Resolution 2016-190, and those
added for this Adjustment:
Planning Division
1. Prior to the issuance of the first certificate of occupancy, the property owner shall
coordinate the alignment and connection of the 26-foot wide stabilized
emergency access driveways as depicted on the site plan drawings with the
property owners to the north and south and enter into a cross-access agreement
with both adjacent property owners. The agreement shall be recorded identifying
that the driveways shall be pervious in nature, shall be clear of any obstructions
and shall be utilized only for emergencies. This cross access easement will not
be required if an agreement is executed for the construction of a shared access
driveway that will be utilized for ingress/egress with either development to the
north or south. Said shared access driveway improvements shall require
modifications to the approved site plans. (Under Construction)
2. Prior to the issuance of the 10th certificate of occupancy for a single-family
residence the following list of amenities shall be constructed with a certificate of
occupancy or completion issued by the County's Building Department in
accordance with the approved site plan:
a. Common recreational amenity (swimming pool/deck) and restrooms;
b. All off-street parking spaces;
c. The monument (project identification) sign located at the entrance.
Fire District
3. All single family residential structures shall have sprinklers in accordance with the
Florida Fire Prevention Code.
Mosquito Control District
4. After the issuance of the final certificate of occupancy for the development, the
developers, successors or assigns, or designated HOA/POA shall be responsible
for the perpetual maintenance of the mosquito control culverts. The flushing
culverts must be maintained in functional order at all times, and undergo
maintenance immediately after all catastrophic events to remove debris and sand
PDS Order 2021-061
Page 3 File Number: SPMn — 12202025906
•
that accrue to block water exchange after these events. St. Lucie County
Mosquito Control and Public Works will make periodic inspections of these
facilities to ensure compliance with this condition.
County Attorney's Office
5. Prior to recordation of the Final Plat, all property included in the legal description
of this petition shall be subject to a Declaration of Covenants and Restrictions
acceptable to the County Attorney's Office which shall include the following:
a. Formation of a single "master" property owner's association, automatic
voting membership in the master association by any party holding title to
any portion of the subject property, and assessment of all members of
the master association for the cost of maintaining all common areas;
(Completed).
b. All recreational parcels shall be deed restricted to recreation for the use
of the residents of the development. At the time of turnover of the
POA/HOA, the recreation parcel shall be turned over to the association
at no costs to the residents;
c. The property shall not be subject to the Declaration of Covenants and
Restrictions in phases. Approval of the Declaration must be obtained
from the County Attorney's Office prior to the recordation of the Final Plat
for any portion of the planned development; and
d. All sales brochures, sales contracts, and POA/HOA documents shall
contain written disclosures of the current Coastal Barrier Resources
System (CBRS) Area designation at the time of the sale for insurance
purposes.
Public Works, Engineering Division
6. In accordance with the approved site plan, the applicant shall be required to
provide an 8 foot wide sidewalk along the western side of SR A-1-A. Relief will
be granted to the applicant in the event that the Florida Department of
Transportation (FDOT) refuses the construction of the sidewalk within their road
right-of-way. The applicant shall then pay a fee-in-lieu to the County as
described in LDC, Section 7.05.04.h - Sidewalks and Bikeways. (Note: FDOT
has rejected the subject sidewalk, therefore a fee-in-lieu will be pursued)
7. Prior to the issuance of a Building Permit, on-site construction (engineering)
plans shall be submitted to the Public Works Engineering Division for review and
approval. (Site Development Permit Approved).
PDS Order 2021-061
Page 4 File Number: SPMn - 12202025906
Environmental Resources Department
8. Prior to issuance of a Vegetation Removal Permit or Exemption, whichever
comes first, the developer shall provide an executed Conservation Easement,
approved Preserve Area Monitoring and Management Plan (PAMMP), Dune
Restoration Plan and Sea Turtle Protection Plan (STPP) with an attached
affidavit and cashier's check (payable to the Clerk of the Court for recording fees)
to the County Attorney. The applicant shall also provide a georeferenced GIS
shapefile or CAD file of the conservation easement boundaries to St. Lucie
County. A copy of a standard Conservation Easement can be found on the St.
Lucie County Environmental Resources Department website at:
http://www.stlucieco.gov/pdfs/Conservation_Easement_Form.pdf. (Completed)
9. Prior to issuance of a Vegetation Removal Permit or Exemption, the applicant
shall include the following information within the Declaration of Covenants and
Restrictions documents:
a. Restrictions on any encroachment into the preserve areas, as well as
restrictions on vegetation removal outside the building pad areas.
[Comprehensive Plan Policy 8.1.8.5]
b. References to the Preserve Area Management Plan (PAMMP) and Sea
Turtle Protection Plan (STPP).
c. Disclosure regarding the Coastal Barrier Resources (CBRS) Area zone
designation for this property.
d. Mechanism for perpetual financial responsibility of the Property Owners'
Association for future dune and culvert maintenance.
(Completed)
10.The issuance of County development permit does not in any way create any
rights on the part of the applicant to obtain a permit from a state or federal
agency and does not create any liability on the part of the County if the applicant
fails to obtain requisite approvals or fulfill the obligations imposed by a state or
federal agency or undertakes actions that result in a violation of state or federal
law.
11.AI1 other applicable state or federal permits must be obtained before
commencement of the development.
12.Prior to the issuance of a Certificate of Occupancy, compliance with the sea turtle
lighting standards shall be required through review and approval of a night time
survey with all beachfront lighting turned on as detailed in St. Lucie County Land
Development Code, Section 6.04.02.I.9.a. All seaward and shore-perpendicular
facing windows and doors shall be fitted with tinted glass or film with a visible
light transmittance value of forty-five (45) percent or less. If any violations of the
PDS Order 2021-061
Page 5 File Number: SPMn — 12202025906
sea turtle lighting code are identified a Certificate of Occupancy shall not be
issued until all violations have been corrected.
13.Prior to the issuance of a Certificate of Occupancy, informational sea turtle
signage shall be installed on each dune crossover.
14.Prior to issuance of a Certificate of Occupancy, the proposed flushing culvert
shall be installed consistent with the approved site plan.
15.Prior to issuance of further Vegetation Removal Permit(s) or Exemption(s), listed
species surveys including but not limited to gopher tortoise surveys shall be
updated as required per state and/or federal survey protocol. Should any listed
species be found as a result of these updated surveys, appropriate permits from
state and federal agencies shall be required. (New)
16.Within thirty (30) days of approval or prior to issuance of any building permits for
the subject property, whichever occurs first, the access agreement/easement for
Mosquito Control along the western portion of the site and the modified wetland
and upland buffer easement reflecting this minor adjustment shall be recorded in
the official public records. (New)
B. The property on which the Minor Adjustment to the Final PUD Site Plan is being
granted is described as follows:
Government Lot 2, less the north 938.84 feet and less the right-of-way of State
Road A-1-A and Government Lot 3, less the right-of-way of State Road A-1-A,
Section 29, Township 35 South, Range 41 East, St. Lucie County, Florida.
Parcel ID Number: 2529-233-0002-000-0
C. The approvals and authorizations granted by this Order shall expire on upon
expiration of the active subdivision site development permit, unless a Plat is
recorded or a site plan extension is granted in accordance with LDC, Section
11.02.06.B.3., St. Lucie County Land Development Code.
D. The property owner, including any successors in interest, shall obtain all applicable
development permits and construction authorizations from the appropriate State,
Federal and local regulatory agencies including, but not limited to, the United States
Army Corps of Engineers, the Florida Department of Environmental Protection,
Florida Department of Transportation, South Florida Water Management District,
Fort Pierce Utilities Authority, St. Lucie County Utilities, St. Lucie County
Environmental Resources Department, St. Lucie County Building Division and
Public Works Department prior to the commencement of development activities on
the property described in Part A. Issuance of any permit by the County does not in
any way create any rights on the part of the developer to obtain a permit from a
PDS Order 2021-061
Page 6 File Number: SPMn — 12202025906
state or federal agency and does not create any liability on the part of the County for
issuance of this permit if the developer fails to obtain requisite approvals or fulfill the
obligations imposed by a state or federal agency or undertake actions that may
result in a violation of state or federal law.
E. The conditions set forth in Part A are an integral non-severable part of the site plan
approval granted by this Order. If any condition set forth in Part B is determined to
be invalid or unenforceable for any reason and the developer declines to comply
voluntarily with that condition, the site plan approval granted by this Order shall
become null and void.
F. This order shall be recorded in the Public Records of St. Lucie County.
G. A recorded copy of this Order shall be attached to the site plan drawings described
in Part A, which plan shall be placed on file with the St. Lucie County Planning and
Development Services Department Director.
H. A copy of this Order shall be attached to the site plan drawings described in Part A, which
plan shall be placed on file with the St. Lucie County Planning and Development Services
Department and mailed to the developer and agent of record as identified on the site plan
application.
nd
ORDER effective the Lc� day of) ,Etcr\Aegic..2021.
PLANNING & DEVELOPMENT SERVICES DIRECTOR
ST. LUCIE COUNTY, FLORIDA
BY r 11,
Leslie Olson, CP
APPROVED AS TO FORM
AND CO ECTNESS:
BY
Count Attorney
PDS Order 2021-061
Page 7 File Number: SPMn — 12202025906
EXHIBIT "A"
LOCATION MAP
— w
Sunset Beach
Orange Ave ` (e_iiPUD
/ t
/ ,,
Subject parcel
Virginia Ave
NlA`
i 6A 1.5 17
k'1/41 ,\
O. 17,0./.--;;%
-,
cs " �o
• p r Alr, w
C.
D \ .p \;(
o 0
Midway Rd te°''/
PDS Order 2021-061
Page 8 File Number SPMn — 12202025906