PDS ORDER 2022-016
File No.: SPMn- 12202025906
AN ORDER GRANTING A MINOR ADJUSTMENT TO THE MAJOR SITE
PLAN FOR THE PROJECT KNOWN AS FIRST SOURCE COMMERCE
PARK FOR PROPERTY LOCATED AT 873 S KINGS HIGHWAY
WHEREAS, the St. Lucie County Planning and Development Services Director has reviewed the
request for a Minor Adjustment to the Major Site Plan for the project known as First Source
Commerce Park, the recommendation of the Development Review Committee, and has made the
following determinations:
Rhonda Counes of the First Source Commerce Park Condominium, property owner, and
representative, Shane Munson, PE, of Munson Design & Consulting, Inc. filed an
application requesting a Minor Adjustment to the Major Site Plan to improve an additional
fifty-six (56) parking spaces. This adjustment encompasses paving forty-nine (49) parking
spaces in the rear of the complex, previously approved as "Future Reserved Parking", and
seven (7) new spaces adjacent the primary entrance, preserving trees were possible,
installing complimentary landscaping and adjusting stormwater where necessary to support
the site improvements. This modification will supply the complex with 317 paved parking
spaces. The subject 17.05-acre property is located at 873 S. Kings Highway, Fort Pierce,
within the IL (Industrial, Light) Zoning District.
2. On April 5, 2000, the Board of County Commissioners approved the Major Site Plan known
as the First Source Commerce Park, containing 190,481 sq. ft. of space with up to 309
Parking Spaces on land referenced above and described in Part B.
3. October 20, 2006, the Planning and Development Services Director granted a Minor
Adjustment to the Major Site Plan to amend Fire Pump System and Loading Area.
4. On November 16, 2006, the Planning and Development Services Director granted approval
granted a Minor Adjustment to the Major Site Plan to allow walls in the loading area.
5. The Development Review Committee reviewed the proposed Site Plan for the project and
found it meets the technical requirements of the St. Lucie County Land Development Code
and has satisfied the standards of review set forth in Section 11.02.07, Standards for Site
Plan Review, of the St. Lucie County Land Development Code.
6. Planning Staff has performed a detailed analysis of the project and determined it to be
consistent with the St. Lucie County Land Development Code and Comprehensive Plan.
The analysis is located in the Planning and Development Services Department
memorandum titled First Source Commerce Park Minor Adjustment to Major Site Plan
(SPMn- 12202025906), dated April 25, 2022.
7. The proposed project will not have an undue adverse effect on adjacent property, the
character of the neighborhood, traffic conditions, parking, utility facilities, or other matters
SPMn- 12202025906
PDS 2022-016
Page 1 of 6
PDS ORDER 2022-016
File No.: SPMn- 12202025906
AN ORDER GRANTING A MINOR ADJUSTMENT TO THE MAJOR SITE
PLAN FOR THE PROJECT KNOWN AS FIRST SOURCE COMMERCE
PARK FOR PROPERTY LOCATED AT 873 S KINGS HIGHWAY
WHEREAS, the St. Lucie County Planning and Development Services Director has reviewed the
request for a Minor Adjustment to the Major Site Plan for the project known as First Source
Commerce Park, the recommendation of the Development Review Committee, and has made the
following determinations:
Rhonda Counes of the First Source Commerce Park Condominium, property owner, and
representative, Shane Munson, PE, of Munson Design & Consulting, Inc. filed an
application requesting a Minor Adjustment to the Major Site Plan to improve an additional
fifty-six (56) parking spaces. This adjustment encompasses paving forty-nine (49) parking
spaces in the rear of the complex, previously approved as "Future Reserved Parking", and
seven (7) new spaces adjacent the primary entrance, preserving trees were possible,
installing complimentary landscaping and adjusting stormwater where necessary to support
the site improvements. This modification will supply the complex with 317 paved parking
spaces. The subject 17.05-acre property is located at 873 S. Kings Highway, Fort Pierce,
within the IL (Industrial, Light) Zoning District.
2. On April 5, 2000, the Board of County Commissioners approved the Major Site Plan known
as the First Source Commerce Park, containing 190,481 sq. ft. of space with up to 309
Parking Spaces on land referenced above and described in Part B.
3. October 20, 2006, the Planning and Development Services Director granted a Minor
Adjustment to the Major Site Plan to amend Fire Pump System and Loading Area.
4. On November 16, 2006, the Planning and Development Services Director granted approval
granted a Minor Adjustment to the Major Site Plan to allow walls in the loading area.
5. The Development Review Committee reviewed the proposed Site Plan for the project and
found it meets the technical requirements of the St. Lucie County Land Development Code
and has satisfied the standards of review set forth in Section 11.02.07, Standards for Site
Plan Review, of the St. Lucie County Land Development Code.
6. Planning Staff has performed a detailed analysis of the project and determined it to be
consistent with the St. Lucie County Land Development Code and Comprehensive Plan.
The analysis is located in the Planning and Development Services Department
memorandum titled First Source Commerce Park Minor Adjustment to Major Site Plan
(SPMn- 12202025906), dated April 25, 2022.
7. The proposed project will not have an undue adverse effect on adjacent property, the
character of the neighborhood, traffic conditions, parking, utility facilities, or other matters
SPMn- 12202025906
PDS 2022-016
Page 1 of 6
affecting the public health, safety, and general welfare.
8. All reasonable steps have been taken to minimize any adverse effects of the proposed
project on the immediate vicinity through building design, site design, landscaping, and
screening.
NOW, THEREFORE, BE IT ORDERED BY THE PLANNING AND DEVELOPMENT SERVICES
DIRECTOR OF ST. LUCIE COUNTY, FLORIDA:
A. Pursuant to Section 11.02.04 and 11.02.07 of the St. Lucie County Land Development Code,
the Minor Adjustment to the Major Site Plan is hereby approved as shown on the Site Plan
drawings prepared by Munson Design & Consulting, Inc., revised through January 20, 2022,
and date stamped by the Planning & Development Services Department on January 21, 2022,
subject to the following conditions:
Environmental Resources Department
1) Within 90 days of site development permit or building permit approval,
landscaping within the landscape buffers adjacent to the proposed parking areas shall
comply with the original landscape plan as approved per the First Commerce Park
major site plan (MJSP_04-0 23).
Public Works Department
2) Prior to the issuance of a Site Development Permit, the construction plans shall
provide:
a. The published benchmark for site elevations.
b. The current FIRM panel and revised date.
c. The current pavement standard of SP-9.5.
d. The parking detail to provide for full storage depth, with the wheel stop exclusive
of the 16' of asphalt length.
e. A table that identifies the existing, permitted allowable and proposed impervious
area.
Provide evidence of SFWMD permitted conditions for impervious area. If a
permit modification and additional treatment is required, calculations shall be
provided to the County for review.
B. The property on which this Minor Adjustment to the Major Site Plan is being granted is
described as follows:
LEGAL DESCRIPTION:
A PORTION OF A PARCEL OF LAND LYING IN THE SOUTHEAST 1/4 OF THE
SOUTHEAST 1/4 OF SECTION 11, TOWNSHIP 35, SOUTH RANGE 39 EAST, ST.
LUCIE COUNTY, FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
SPMn- 12202025906
PDS 2022-016
Page 2 of 6
COMMENCE AT THE SOUTHEAST CORNER OF SAID SECTION 11;
THENCE, NORTH 89032'37" WEST, FOR 25.00 FEET TO THE WESTERLY RIGHT OF
WAY OF KINGS HIGHWAY (S.R. 713); THENCE ALONG SAID WESTERLY RIGHT OF
WAY NORTH 00013'52" WEST FOR 51.00 FEET TO THE POINT OF BEGINNING;
THENCE LEAVING SAID RIGHT OF WAY SOUTH 89032'37' WEST FOR 1,173.21 FEET;
THENCE NORTH 00009'27" WEST FOR 637.97 FEET;
THENCE SOUTH 90000'00" EAST FOR 1,172.39 FEET TO THE SAID WESTERLY
RIGHT OF WAY OF KINGS HIGHWAY (S.R. 713); THENCE ALONG SAID WESTERLY
RIGHT OF WAY SOUTH 00013'52" EAST FOR 628.84 FEET TO THE POINT OF
BEGINNING.
SAID LANDS LYING AND BEING IN THE CITY OF FORT PIERCE, ST. LUCIE COUNTY,
FLORIDA, AND CONTAINING 17.05 ACRES, MORE OR LESS.
Parcel Identification Number(s): 2311-4430-001-0009, et. al.
Address: 873 S Kings Highway, Fort Pierce, FL 34947
C. This Minor Adjustment to the Major Site Plan for the First Source Commerce Park shall
expire within twenty-four (24) months of the effective date of this Order, unless a building or
site development permit is issued or an extension is granted in accordance with Section
11.02.06, St. Lucie County Land Development Code.
D. The developer is advised as part of this Minor Adjustment to the Major Site Plan approval
for First Source Commerce Park, including any successors in interest, the developer shall
obtain all applicable development permits and construction authorizations from the
appropriate State and Federal and local regulatory agencies including, but not limited to,
the United States Army Corps of Engineers, the Florida Department of Environmental
Protection, and South Florida Water Management District, and the St. Lucie County
Environmental Resources Public Works and Building Departments prior to the
commencement of any development activities on the property described in Part B.
Issuance of this approval by the County does not in any way create any rights on the part
of the developer to obtain a permit from a State or Federal agency and does not create any
liability on the part of the County for issuance of this permit if the developer fails to obtain
requisite approvals or fulfill the obligations imposed by a State or Federal agency or
undertake actions that may result in a violation of State or Federal law.
E. A copy of this Order shall be attached to the Site Plan drawings described in Part A, which
then shall be placed on file with the St. Lucie County Planning and Development Services
Department and mailed to the developer and agent of record as identified on the Site Plan
application.
F. The conditions set forth in Part A are an integral non -severable part of the Minor
Adjustment to the Major Site Plan approval granted by this Order. If any condition set forth
in Part A is determined to be invalid or unenforceable for any reason and the developer
declines to comply voluntarily with that condition, the Site Plan approval granted by this
Order shall become null and void.
SPMn- 12202025906
PDS 2022-016
Page 3 of 6
G. A Certificate of Capacity Exemption, a copy of which is attached hereto as Exhibit B and
made a part hereof the Order, was granted by the Planning and Development Services
Department Director, which shall remain valid for the period of Site Plan approval.
H. This Order shall be recorded in the Public Records of St. Lucie County.
This ORDER effective the Z day of April 2022.
PLANNING AND DEVELOPMENT SERVICES
ST. LUCIE COUNTY, FL RIDA
BY L"(Cj �
Mayte San amana, Dire for
APPROVED AS TO FORM
ANI
M
SPMn- 12202025906
PDS 2022-016
Page 4 of 6
SPMn- 12202025906
PDS 2022-016
EXHIBIT "A"
Site Plan Amendment Exhibit
Page 5 of 6
EXHIBIT "B"
Certificate of Capacity Exemption
St Lucie County
Certificate of Capacity Exemption
Date 4/261'2022 Certificate No. ? 1 u8
This document certifies that concurrency will be met and that adequate public facility
capacity exists to maintain the standards for levels of service as adopted in the St
Lucie County Comprehensive Plan for:
1. Type of development Minor Adjustment to Major Site
Number of units Number of square feet
2. Property legal description & Tax ID no.
1311-4430-001-0009
873 S Kings I Iigh�ray
First Source Cnn,n,erce Perk I irst Source Comnnerce Park C(mduniiniunE
3. Approval: Building Resolution No. PUS 2,022-0 Letter
4. As part of the development:
5. On property owned by
First Source Conrinerce Park Condominium
116 Egrct Circle
fireenacres rL 33413
Is hereby granted a Certificate of Capacity Exemption according to the following Chaptor(s) of the St Lucie County
Land Development Cade: 7 5.03,02(A) L 5.03.02(B)l J 5.03.02(8)2 C 5.03.02(e)3 5.03.02(B)4
5,03.02(B)5 W 5.03.02(B)6 ) i 5.03.04(A) 5.03.04(A)2 i 5.03.04(A)3
5.03.04(B)l L 5.03.04(B)2 ❑ 5.03.04(9)3 5.03.04(6)4
6. Certificate Expiration Date 4f26/2024
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel, and is subject to the same terms, conditions and expiration date listed herein.
The expiration date can be extended only under the same terms and conditions as the
underlying development orderissued with this certificate, or for subsequent
development order( ) issue for t e same property, use and size as described herein.
Signed a,--✓1. ru - -Date:4/26i2022
Planning and Develop tent Services Director
St Lucie County, Florida
S PM n-12202025906
PDS 2022-016