HomeMy WebLinkAbout2021-001 Midway Glades Developers (LTC Ranch DRI) - Amended 2021—00 I AMENDED
RIF -803►
AMENDMENT TO ROAD IMPACT FEE CREDIT AGREEMENT 2021-001
EXECUTED BETWEEN ST. LUCIE COUNTY BOARD OF COUNTY
COMMISSIONERS AND MIDWAY GLADES DEVELOPERS, LLC IN
CONSIDERATION FOR THE CONVEYANCE OF RIGHTS-OF-WAY,
DESIGN AND CONSTRUCTION OF CERTAIN ROAD IMPROVEMENTS
This Amendment ("Amendment") to Road Impact Fee Credit Agreement 2021-001 is
made and entered into as of this 2.D day of Sepkarbev 2022, by and between ST. LUCIE
COUNTY, a political subdivision of the State of Florida, hereinafter referred to as "St. Lucie
County" and MIDWAY GLADES DEVELOPERS, LLC, a Delaware Limited Liability
Company,whose address is 7807 Baymeadows Road East,Suite 205,Jacksonville,Florida 32256,
hereinafter referred to as "MGD." St. Lucie County and MGD are collectively "Parties" to this
Amendment.
WITNESSETH
WHEREAS,St. Lucie County and MGD entered into Road Impact Fee Credit Agreement
2021-001 ("Agreement")on June 1,2021; and
WHEREAS, the Agreement established road impact fee credits St. Lucie County would
grant to MGD for various creditable activities, including for the design, permitting, right-of-way
dedication and construction of Arterial-A from Glades Cut-Off Road to Midway Road, which
would occur in three defined segments initially constructed with two lanes and then subsequently
widened to four lanes as described in Section 2.0 of the Agreement; and
0
5
WHEREAS, Section 2.0 established the total Base Credit for the Arterial-A Road B
Improvement by crediting 80%of the total cost of the Arterial A Road Improvement as referenced t
in Exhibit 4 to the Agreement, of which St. Lucie County's share was set at 50%, resulting in an g
overall impact fee credit from St. Lucie County of 40%(80%multiplied by 50%) for the Arterial- o
A Road Improvement contribution; and § s
U o:
WHEREAS, Section 163.31801(5), Florida Statutes, now requires that any contribution ; a
toward infrastructure, including permitting, design, right-of-way dedication and construction of a u
road improvement,must be credited on a"dollar-for-dollar"basis against any impact fee collected g
c
for which the contribution was made; and 8 o
WHEREAS,the 80%credit provided by the Agreement warrants adjustment to provide a
dollar-for-dollar credit(i.e., 100%credit) in accordance with s. 163.3180(5), Florida Statutes(i.e.
St. Lucie County will now be providing an overall impact fee credit for the Arterial A Road
Improvement of 50%(100%multiplied by 50%); and
WHEREAS, in addition to St. Lucie County's road impact fee credit against 50% of the
cost of the of the Arterial A Road Improvement,as set forth above,MGD will be seeking a mobility
fee credit against 50%of such cost from the City of Port St. Lucie. MGD will be responsible for
Page 1
038791 19.v 1
entering into an agreement with the City of Port St. Lucie for such mobility fee credit and MGD
will not seek any additional credit from the County for the cost of the Arterial A Road
Improvement, other than what is set forth herein; and
WHEREAS, the creditable activities related to the Arterial -A Road Improvement have not
yet commenced and no impact fees have been credited as of the date of this Amendment; and
WHEREAS, St. Lucie County and MGD mutually desire to execute this Amendment to
adjust the impact fee credits that shall be granted to MGD for the Arterial A Road Improvement.
NOW, THEREFORE, in consideration of the mutual covenants entered into between the
parties hereto to be made and performed, and in consideration of the benefits to accrue to each of
the parties, it is agreed as follows:
Section 1. Incorporation by Reference.
The above recitals are true and correct, and together with the exhibit attached hereto; are made a
part of this Amendment by reference.
Section 2. The first paragraph of Section 2 of the Agreement is hereby amended,
superseded and replaced as follows:
Section 2. Issuance of Road Impact Fee Credits and Receipt
MGD shall be entitled to credits against St. Lucie County Road Impact Fees ("Road
Impact Fee Credits") in the total amount of $24,952,240 $23�-070,197 (expressed in year
2021 dollars) based on the sum of the cost estimates set forth in Exhibit "4" for design,
permitting, right-of-way dedication and construction of the Creditable Improvements (each
a "Base Credit"). Upon MGD providing documentation to St. Lucie County confirming
that a particular component of a Creditable Improvement has been completed, St. Lucie
County shall issue a Credit Receipt confirming the Road Impact Fee Credit, being the Base
Credit specified for each such component in Sections 2.A., 2.13. and 2.C., below, adjusted
based on the formula set forth in Section 2.E. St. Lucie County shall provide to MGD by
certified mail an acceptance letter ("Acceptance Letter") within five (5) business days
following an approved final inspection of construction for each Creditable Improvement
or component thereof as specified below in Sections 2.A, 2.13 and 2.C.
Sections 2.A and 2.13 remain unchanged as set forth in the Agreement.
Section 3. Section 2.0 of the Agreement is hereby amended, superseded and replaced as
follows:
C. Arterial -A Road Improvement
1. Upon completion of design and permitting of the Arterial -A Road Improvement, as
evidenced by the issuance of a City construction permit, St. Lucie County shall issue a
Page 2
03879119.0
Credit Receipt specifying the Base Credit in the amount of $300,000 $40,000-and
showing the calculation required by Section 2.E and the resulting Road Impact Fee
Credit.
2. Construction of Arterial -A shall be divided into three segments (i.e., Segment 1,
Segment 2 and Segment 3) as depicted by Exhibit "2." Each segment will first be
constructed as two lanes starting with Segment I and ending with Segment 3. Each
segment will be widened subsequently from two lanes to four lanes in the same order.
Upon completion of construction and inspection of each Arterial -A segment
improvement, as evidenced by a City acceptance letter, St. Lucie County shall issue a
Credit Receipt for such Arterial -A segment improvement as follows:
• Segment 1 (two lanes): Specify Base Credit of $1,446,707 $','�6-and
show calculation required by Section 2.E and the resulting Road Impact Fee
Credit for this component;
• Segment 2 (two lanes): Specify Base Credit of $1,661,697 $1,329,359
show calculation required by Section 2.E and the resulting Road Impact Fee
Credit for this component;
• Segment 3 (two lanes): Specify Base Credit of $1,446,707 $ ,'�66-and
show calculation required by Section 2.E and the resulting Road Impact Fee
Credit for this component;
• Segment 1 (widen from two lanes to four lanes): Specify Base Credit of
$1,446,707 Q','��-r and show calculation required by Section 2.E and the
resulting Road Impact Fee Credit for this component;
• Segment 2 (widen from two lanes to four lanes): Specify Base Credit of
$1,661,697 $1� ''°�8 and show calculation required by Section 2.E and the
resulting Road Impact Fee Credit for this component;
• Segment 3 (widen from two lanes to four lanes): Specify Base Credit of
$1,446,707 Q','�--45;-,346&and show calculation required by Section 2.E and the
resulting Road Impact Fee Credit for this component.
Sections 2.D, 2.E, 2.F, 2.G and 2.H remain unchanged as set forth in the Agreement.
Section 4. New Exhibit 4.
Exhibit 4 to the Agreement is hereby amended, superseded and replaced with Exhibit 4 attached
hereto.
Section 5. Effect of Amendment.
Except as expressly amended by this Amendment, all provisions of the Agreement including
exhibits remain unchanged by this Amendment.
Section 6. Effective Date
Page 3
03879119.v1
The "Effective Date" of this Amendment is the date on which the last signatory signs the
Amendment.
Section 7. Recording of Amendment.
This Amendment shall be recorded by St. Lucie County in the Public Records of St. Lucie County
and shall be binding upon St. Lucie County, MGD and any successors in interest and title to the
Property, provided, however, that any parcel or platted lot within the Property as to which the Road
Impact Fee has been satisfied either through payment of the Road Impact Fee or use of Road
Impact Fee Credits shall be automatically released herefrom.
Section 7. Participation.
Each of the Parties have participated in the preparation of this Amendment. Accordingly, this
Amendment shall not be more strictly construed against either of the Parties, and shall be
interpreted as if the Parties hereto jointly prepared it.
Section 8. Counterparts.
This Amendment may be executed in any number of counterparts, each of which when executed
and delivered shall constitute an original, and all such counterparts shall constitute one and the
same instrument.
[Signatures on the following page.]
Page 4
03879119M
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the
day and year first above written.
Signed, sealed and delivered in the presence of:
ATTEST:
Deputy Clerk
Witness:
Pr' t ame renaon C
Print Name: l j
STATE OF FLORIDA
COUNTY OF 21L u CAz
ST. LUCIE COUNTY
BOARD OF COUNTY COMMISSIONERS
Chair
APPROVED AS TO FORM AND
CORRECTNESS
County Attorney
MIDWAY GLADES DEVELOPERS, LLC,
a Delaware limited liability company
By: /v�L
R. Austin Burr, Vice President
The foregoing instrument was acknowledged before me by means of hysical
presence or ❑ online notarization, this t_ day of 2021! by R. Austin Burr,
as Vice President of�IDWAY GLADES DEVELOPERS, LLC, a Delaware limited liability
company, who is personally known to me or who ❑ has produced
as identification
,►fY °�y Notary Public State of Florida
[Notary S , Susan Pardue
My Commission GG 302934
30L�cq'
Notary Public
OF N Expires 02/17/2023 S I (—s cu(-)
Name printed
�
My Commission Expires: 1-7,/
Page 5
03879] 19.0
EXHIBIT 4
ST. LUCIE COUNTY IMPACT FEE CREDITS
LTC RANCH DRI WEST RESIDENTIAL
A
B
C
D
E
F
Roadway
From
To
DIR
Credit*
Percentage
of Credit
Total Cost
LTC Credit**
Midway Road
Arterial A
I-95
EB
100%
100%
$2,620,695
$2,620,695
Midway Road
Arterial A
I-95
WB
100%
100%
$2,620,695
$2,620,695
Glades Cut -Off Road
Arterial A
I-95
EB
100%
100%
$5,150,314
$5,150,314
Glades Cut -Off Road
Arterial A
I-95
WB
100%
100%
$5,150,314
$5,150,314
Arterial A
Glades Cut -Off Road
End of Seg I
NB
50%
100% 9"0
$2,993 415
$1,496,707
Arterial A
Glades Cut -Off Road
End of Seg 1
SB
50%
100% 9"0
$2,993 415
$1,496,707
Arterial A
End of Se 1
g
End of Se 2
g
NB
50%
100% SA°�
$3,423,394
$1,71 1,697
Arterial A
End of Se I
g
End of Se 2
g
SB
50%
100% �
$3,423,394
$1,71 1,697
e, zoo �c4
Arterial A
End of Se 2
g
Midway Road
y
NB
50%
100%fie
$2,993 415
�
$1,496,707
Arterial A
End of Seg 2
Midway Road
SB
50%
100%$"°fie
$2,993,415
$1,496,707
Construction Total $34,362,466
CREDIT TOTAL $24,952,240
e23 non i 97
*Arterial A impact credit proposed at 50% for County Share.
** Arterial A credits include $300,000 for permitting and design, divided equally across the six values. The Base Credits in Section 2
for Arterial A breakout permitting and design separately. Therefore, the values differ from the Arterial A credits shown here.