Loading...
HomeMy WebLinkAbout02-016Florida, that: RESOLUTION NO. 02-16 A RESOLUTION ACCEPTING A PUBLIC UTILITY EASEMENT FOR WASTEWATER FACILITIES ON BEHALF OF ST. LUCIE COUNTY, FLORIDA BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, The foregoing PUBLIC UTILITY EASEMENT FOR WASTEWATER FACILITIES is duly accepted on behalf of St. Lucie County this 9 th JULY, 2002. l+�`'J .r ATTEST Deputy Clerk BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA BY: _ Ch�man . APPROVED AS TO FORM AND CORRECTNESS: BY: OCEAN HARBOUR VILLAS OWNERS ASSOCIATION G:\ACQ\WP\YVONNE\MSBU\TREASURE\Resolution 02-16.wpd r CD �-' l=l C? I-- 3> O N � CO- rri m C'• or o G7 CD r- N � P•J O�m —1 cm o m co M c-3 H r„ C,- T M O rn P•J —I .�o Ci• i C.TI U7 t--e r n H M n rm This instrument prepared by: JoAnn Riley under the direction of Daniel 5. McIntyre, County Attorney St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 FEB- 0 N R N 0 W L i 2 6 M¢ ENGINEERING PROJECT: TREASURE COVE/OCEAN HARBOUR SOUTH MSBU PARCEL ID NO: 1423-120-0012-000/8 (part) PUBLIC UTILITY EASEMENT FOR WASTEWATER FACILITIES THIS EASEMENT, made this day of �j , 2002, by OCEAN HARBOUR VILLAS OWNERS ASSOCIATION, INC., a Florida Corp ation, whose address is 4245 North MA #1, Fort Pierce, FL 34949, hereinafter referred to as GRANTOR, and ST. LUCIE COUNTY, a Political Subdivision of the State of Florida, 2300 Virginia Avenue, Fort Pierce, FL 34982, hereinafter referred to as GRANTEE. THIS EASEMENT replaces a PUBLIC UTILITY EASEMENT FOR POTABLE WATER FACILITIES previously recorded in Official Record Book 1428, Page 1519. KNOW ALL MEN BY THESE PRESENTS that the undersigned, for and in consideration of the sum of Ten Dollars ($10.00), to them in hand paid, the receipt of which is hereby acknowledged, do hereby convey and grant to ST. LUCIE COUNTY, a Political Subdivision of the State of Florida, for the use and benefit of ST. LUCIE COUNTY, the privilege and easement for the installation, maintenance, operation, repair, replacement or renewal of a wastewater line and related facilities in, under, upon, over, and across the following described land in St. Lucie County, Florida, being more particularly described in Exhibit "A" attached hereto and made a part hereof. TO HAVE AND TO HOLD the same unto the Grantee, its successors and assigns forever The Grantee may remove, cut or trim trees, bushes, and saplings growing upon or extending over said strip of land so far as may be reasonably necessary in the installation, maintenance, operation, repair, replacement, or renewal of any of the above mentioned utilities or improvements. Grantor hereby agrees that no further improvements shall be placed within the easement defined herein, nor shall any improvements damaged or removed from said easement be replaced within the easement area without the express written consent of the Grantee herein. Grantor further agrees that no new improvements shall be placed near the easement or utility improvements in such a manner so as to prevent the access to, and maintenance of, the utility lines or equipment by the Grantee, its agents, employees, contractors or assigns. Grantor further grants to the Grantee, its agents, employees, contractors or assigns, a general ingress/egress easement over and across its driveways, parking, common or open areas, for the purpose of access to, and/or maintenance of, any of the Grantee's utility lines and equipment. co r� cn Un Ln z, m r•,a .10 c c- Subject to the provisions of Section 768.28, Florida Statutes, Grantee agrees to indemnify and hold harmless Grantor from and against any actions at law to recover damages in tort for money damages for injury or loss of property, personal injury, or death arising out of the installation, maintenance, operation, repair, replacement, or renewal of said utilities facilities, and the equipment connected therewith, over, under and across said easement areas and caused by the negligent or wrongful act or omission of any employee of Grantee while acting within the scope of his or her office or employment under circumstances in which Grantee, if a private person, would be liable to the claimant, in accordance with the general laws of the State of Florida. The undersigned hereby covenant and warrant that they own the said land and have the right to grant this easement. IN WITNESS REOF, the undersigned Grantor has hereunto set their hand and seal this 25M day of , 2002. Signed, sealed and delivered in the presence of: r itness Print LNNe: Witness Print Name:/ f STATE OF FLORIDA COUNTY OF ST. LUCIE GRANTOR: OCEAN HARBOUR VILLAS OWNERS ASSOCIATION, INC. On this � day of re_ b rvKR2.. 2002, LEW GILLILAND, the Vice -President of OCEAN HARBOUR VILLAS OWNERS AS5OCIATION, INC. a Florida Corporation, for and on behalf of the Corporation, personally appeared before me, who i ersonally known to �? or who produced as identification and who did (not) take an oath. Notary Public Commission expires: (� ��-- (seal) e ShadG.FYN= Print Name: My CommWion D0072M OF IVExpires November 18, 2006 G:\ACQ\WP\YVONNE\MSBU\TREASURE\Ocean Harbour Villas\Corrected Easement.wpd Q 0 0 cn L71 to 3> IM m r� -a NORTH LINE OF SOUTH 2300 GOVERNMENT LOT 1 ----- --------- - 10' FP&L EASEMENT ORB 415, 0 0 M N POINT OF COMMENCEMENT NORTHEAST CORNER OF ORB 385, PAGE 326 BEARING BASE N89`57'34"W PAGE 1774 APPROXIMATE CENTERLINE EXISTING LIFT STATION ! _ �8-9°57a4" 132.00 15' UTILITY EASEMENT S09°36'16"W ,- 15.00' POINT OF TERMINUS CENTERLINE 15' UTILITY EASEMENT POINT OF \BEGINNING \ S17*17'29"E 8.60' x \ a z z � S74'43'33"W \ 38.54' \ Z j \ `�-A o_ y c^ �\ -A t� � 0 rV 0 \� 4 OCEAN HARBOR VILLAS PARCEL CONTROL NO. ` (120-0012-000/8) \ r O.R.B. 385, PAGE 326 \ ` co NOTE: THIS PARCEL IS SUBJECT TO A 100 BLANKETINGRSS/EGRESS EASEMENT AS o RECORDED IN O.R.B. 385, PAGE 326, ` �c PUBLIC RECORDS OF ST. LUCIE COUNTY I -- SOUTH LINE OF GOVERMENT LOT 1 i O 2000 LBFH Inc. V 3 SURVEYOR AND MAPPER'S SIGNATURE; 1. UNLESS IT BEARS THE SIGNATURE AND ORIGINAL.. RAISED SEAL°OF: A- FLORIDA LICENSED SURVEYOR AND MAPPER, THIS MAP/REPORT IS cT-4 AhFOR M-�RONAL ° PURPOSES ON AND IS NOT VALID. 7 ` ' ' ° 2. NO SEA OF THE PUBLIC RECORDS AS_BEE14 �A!} BY. THIS*IWrlCE. a J0 A. LSO PROFESSIONAL SURVEYOR & MAPPR 9 e j S TE OF FLORIDA N0. 5157 J 1in. CONSULTING CIVIL ENGINEERS,.° ,kale S0' abf SURVEYORS;`& MAPPERS:_` "Partners For Results, ' Sheet . 1 Of 2 g INC. Value By Design" 3550 S.W. Corporate Parkway, Palm City, L Florida 34990 Computed: TEP (561) 286-3883 Fax: (561) 286-3925 BPR & FBPE License No: 959 www.lbfh.com Checked: JAW L" SOUTH LINE OF � ORB 385, PAGE 326 -0 \ 3> M m 1 \ THIS IS NOT A SURVEY PROJECT NAME: SKETCH AND DESCRIPTION FOR: OCEAN HARBOR SOUTH M.S.B.U. . 15' UTILITY EASEMENT PROJECT NO.16 REVISIONS: Field Book: N/A Page: N/A Date FILE NO. 5/22/01 LGLO1 A.DWG Field N/A Project No_ 96-0751 LEGAL DESCRIPTION: 15' UTILITY EASEMENT BEING A 15 FOOT STRIP OF LAND FOR UTILITY EASEMENT PURPOSES LYING OVER, UNDER AND ACROSS A PARCEL OF LAND IN GOVERNMENT LOT 1 AS SHOWN ON THE PLAT OF PROPERTIES IN SECTIONS 14, 23 AND 24, TOWNSHIP 34 SOUTH, RANGE 40 EAST, AS RECORDED IN PLAT BOOK 8, PAGE 21 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA. SAID EASEMENT COMPRISES A PORTION OF LANDS DESCRIBED IN OFFICIAL RECORDS BOOK (ORB) 385, PAGE 326 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA AND LIES 7.50 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE WITH THE EASEMENT SIDELINES EXTENDING OR CONTRACTING AS NECESSARY TO INTERSECT THE WEST RIGHT-OF-WAY LINE OF STATE ROAD A-1-A (100 FEET WIDE); COMMENCING AT THE POINT OF INTERSECTION OF THE AFORESAID WEST RIGHT-OF-WAY LINE OF STATE ROAD A-1-A AND THE NORTH LINE OF THE SOUTH 2,300.00 FEET OF THE AFORESAID GOVERNMENT LOT 1, SAID INTERSECTION POINT ALSO BEING DESCRIBED AS THE NORTHEAST CORNER OF SAID ORB 385, PAGE 326, THENCE SOUTH 17°17'29" EAST ALONG SAID WEST RIGHT-OF-WAY LINE, A DISTANCE OF 8.60 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 74°43'33" WEST ALONG SAID EASEMENT CENTERLINE, A DISTANCE OF 38.54 FEET; THENCE NORTH 89°57'34" WEST ALONG A LINE PARALLEL WITH AND 17.50 FEET SOUTH OF (AS MEASURED AT RIGHT ANGLES TO) THE NORTH LINE OF THE AFORESAID PARCEL OF LAND DESCRIBED IN ORB 385, PAGE 326, A DISTANCE OF 132.00 FEET; THENCE SOUTH 09'36'16" WEST, DEPARTING SAID PARALLEL LINE, A DISTANCE OF 73.75 FEET, MORE OR LESS, TO THE APPROXIMATE CENTER OF AN EXISTING LIFT STATION; THENCE CONTINUE SOUTH 09`36'16" WEST, A DISTANCE OF 15.00 FEET TO THE POINT OF TERMINUS OF SAID EASEMENT CENTERLINE. NOTES: 0 0 cs+ Ln L" T_f SUBJECT SITE AND OR RECORDED DOCUMENTS REFERENCED HEREON ARE BASED ON TITLE COMMENT NO. 00-5270, EFFECTIVE DATE 01/19/01, PREPARED BY TREASURE COAST M 1113 ABSTRACT AND TITLE INSURANCE COMANY, 401 SOUTH INDIAN RIVER DRIVE, FORT PIERCE Qom,, FLORIDA. '0 LEGEND: ORB = OFFICIAL RECORDS BOOK NO. = NUMBER 2000 LBFH Inc. THIS IS NOT A SURVEY 1bFCONSULTING CIVIL ENGINEERS, SURVEYORS & MAPPERS "Partners For Results, P C. Value By Design" 3550 S.W. Corporate Parkway, Palm City, Florida 34990 (561) 286-3883 Fax: (561) 286-3925 BPR & FBPE License No! 95--. wwwJUfh.ecm Scale: N /A PROJECT NAME: SKETCH AND DESCRIPTION FOR: OCEAN HARBOR SOUTH M.S.B.U. 15' UTILITY EASEMENT PROJECT NO.16 REVISIONS: Sheet 2 Of 2 Field Book: N/A Page: N/A Computed: TEP Date FILE N0. Checked: JAW 5/07/01 LGLUT01A.DWG Field: N/A Project No. 96-0751