HomeMy WebLinkAbout23-099 RESOLUTION NO. 2023-99
File No.: MNSP-2301-000056
A RESOLUTION BY THE BOARD OF COUNTY
COMMISSIONERS OF ST. LUCIE COUNTY, FLORIDA,
GRANTING/DENYING A MINING PERMIT EXEMPTION FOR
CABO RIO RV PARK, TO ALLOW FOR THE OFF-SITE REMOVAL
OF EXCAVATED MATERIAL IN EXCESS OF ONE HUNDRED
CUBIC YARDS FROM THE ON-SITE CONSTRUCTION OF A
STORMWATER MANAGEMENT AREAS ON CERTAIN
PROPERTY LOCATED IN ST. LUCIE COUNTY, FLORIDA.
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the
testimony and evidence, including but not limited to the staff report, has made the following
determinations:
1. MBV Engineering, on behalf of Cabo Rio Holdings, LLC, submitted an application fora Mining
Permit Exemption for the Cabo Rio RV Park project to allow for the off-site removal of excavated
material in excess of 100 cubic yards, originating from the development of an onsite 3.33-acre
stormwater management lake as part of the approved site development permit.
2. The parent parcel consists of+/- 25.12 acres, located along the south side of Indrio Road and
on the east side of Kings Highway in St. Lucie County. The property is legally described in
Part"B'" of this Resolution and depicted on the attached map as Exhibit "A".
3. Staff has performed a detailed analysis of the project and determined it to be consistent with
the St. Lucie County Land Development Code and Comprehensive Plan. The analysis is
found in the Public Works Department Memorandum titled Cabo Rio RV Park Mining Permit
Exemption Application Request, dated July 5, 2023.
4. On August 1, 2023, the Board held a public hearing on the petition, after publishing a notice at
least 10 days prior to the hearing, posting a sign on the subject property, and notifying by mail
all owners of property within 500 feet of the subject property.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie
County, Florida:
A Pursuant to Section 11.05.11A.2.h. of the St. Lucie County Land Development Code, the
mining permit exemption for the project known as Azalea, is hereby approved/denied,
subject to the following conditions:
1. Th removal of excavated material under this exemption shall be performed and
completed by no later than six months from the Site Development Permit issuance
date.
2. The hauling operation is limited to Monday through Friday within the hours of
8:00am and 4:00pm, excluding all holidays. If there are documented adverse effects
from the hauling operation during the school session, the County Engineer may
further restrict the hours of operation as deemed appropriate.
3. A maintenance agreement bond or line of credit will be secured within 30 days of
the mining permit exemption approval and maintained until receiving County written
Cabo Rio Mining Permit Exemption
File No.: MNSP-2301-000056
approval of hauling completion. The County will inspect the haul route, including but
not limited to Indrio Road and Kings Highway, during and following the hauling
operation. Cabo Rio Holdings, LLC will be responsible for any damage associated
with the hauling.
4. This mining permit exemption may be revoked for:
(1) Violation of any condition imposed upon such approval; and
(2) Upon complaint and proof of adverse effects on adjacent properties. The
permit may be revoked only after the Board of County Commissioners holds
a public hearing in accordance with Section 11.00.04 unless the permittee
consents to a revocation of the permit. If the permittee provides written
consent to the revocation, the Director shall revoke the permit and notify the
Board of County Commissioners of the revocation.
B. The property for which this exemption is granted is described as follows:
Legal Description
Parcel I.D. # 1313-321-0002-000-4
The land referred to herein below is situated in the County of St. Lucie, State of Florida,
and is described as follows:
13 34 39 FROM NE COR OF SW 1/4 RUN WLY 70 FT,TH SLY 20 FT TO SLY RAN INDRIO
RD,TH WLY ALG RAN LI 1257.74 FT TO POB,TH SLY 1310 FT,TH WLY 1256.40 FT TO PT ON
ELY RAN LI OF KINGS HWY,TH NLY ON RAN LI 499.55 FT,TH ELY 628.75 FT,TH NLY 571
FT,TH ELY 178.45 FT,TH NLY 237.75 FT TO SLY R/W LI OF INDRIO RD,TH ELY ALG R/W LI
821.30 FT,TH SLY 695 FT,TH ELY 330 FT,TH NLY 695 FT TO SLY RAN LI OF INDRIO RD,TH
ELY ON R/W LI 556.3 FT TO POB (25.05 AC).
C. The owner of Cabo Rio RV Park, and associated site development activities, is advised
as part of this exemption approval that the owner or any successor in interest shall obtain
all applicable development permits and construction authorizations from the appropriate
State and Federal and local regulatory agencies including, but not limited to, the United
States Army Corps of Engineers, the Florida Department of Environmental Protection,
and South Florida Water Management District, and the St. Lucie County Environmental
Resources prior to the commencement of any development activities on the property
described in Part"B". Issuance of this approval by the County does not in any way create
any rights on the part of the owner to obtain a permit from a state or federal agency and
does not create any liability on the part of the County for issuance of this permit if the
owner fails to obtain requisite approvals or fulfill the obligations imposed by a state or
federal agency or undertake actions that may result in a violation of state or federal law.
D. The conditions set forth in Part "A" are an integral non-severable part of the Mining
Permit exemption granted by this Order. If any condition set forth in Part "A" is
determined to be invalid or unenforceable for any reason and the owner declines to
comply voluntarily with that condition, the Mining Permit exemption approval granted by
this Order shall become null and void.
E A copy of this Order shall be placed on file with the Engineering Division of the St. Lucie
County Public Works Department and mailed to the owner and agent of record as
identified on the Mining Permit application.
F. This Resolution shall be recorded in the Public Records.
Cabo Rio Mining Permit Exemption
File No.: MNSP-2301-000056
G. After motion and second, the vote on this resolution was asfollows:
Cathy Townsend, Chair Yea
Linda Bartz, Vice-Chair Yea
Commissioner Chris Dzadovsky Yea
Commissioner Larry Leet Yea
Commissioner Jamie Fowler Yea
PASSED AND DULY ADOPTED this 1st day of August, 2023.
BOARD OF COUNTY COMMISSIONERS
ATTEST: ST. LUCIE COUNTY, FLORIDA
'a tor--- BY: 1- 1-itt-
Deputy Clerk hair
tc
C044,0.
o
Z APPROVED AS TO FORM AND
"SS4NYVO:>J
BY:
County or ey
Cabo Rio Mining Permit Exemption
File No.:MNSP-2301-000056
Exhibit A
(Site Location Map)
St. Lucie County GIS
•
��<; �� •-..,mar Pkwy,, v g
a ci G i wandea 'v' a Pima
L t Fp Q , a — — Golf Club
`4, �p Ea,31z Gf ..1.
2 Pako Puns CI,
WI roar!kW?
0.
D 113; 5
Y e
ITr
a .2 eT.
ti
na Rd 1n
J U. �`:,
S
Row Rd [al ITY1n i I '14 Indir NI
Cabo Rio
RV Park
2
C
G
a
O
R
I-
1:9.028
0 0.05 0.1 0.2 mr
I '• . 1 '• r
0 01 02 04km
SIC P'pn.,App.*,O ce Esn HERE Gum INCREMENT P
YAemlp USGS 4ETI IASA EPA.USDA
Wm Appebor b AnG6
S&C P merry AcparesOba Eln HERE Gwyn NCAEMEMI P Yawn.USGS M(Sb i SA EPA USDA,.
Cabo Rio Mining Permit Exemption
File No.: MNSP-2301-000056