HomeMy WebLinkAbout23-166 RESOLUTION No. 2023-166
File No.: MJSP-2303-000107
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST.
LUCIE COUNTY GRANTING MAJOR SITE PLAN APPROVAL FOR AN
ELEVEN (11) LOT SUBDIVISION, INCLUDING TEN (10) AGRICULTURAL
LOTS AND ONE STORMWATER AND ACCESS TRACT TO BE KNOWN AS
CARLTON ESTATES, WITHIN THE AG-5 (AGRICULTURAL — 5, 1DUI5AC)
ZONING DISTRICT FOR PROPERTY LOCATED IN ST. LUCIE COUNTY,
FLORIDA.
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the
testimony and evidence, including but not limited to findings in the staff report and traffic
analysis review, has made the following determinations:
1. McCarty & Associates Land Planning and Design LLC, on behalf of KOA Development
LLC, presented a Major Site Plan to develop an eleven (11) lot subdivision, including ten
(10) agricultural lots and one stormwater and access tract to be known as Carlton
Estates. The site is east of Carlton Road, approximately 2 miles north of Glades Cut Off
Road at 9480 Carlton Road, Port St. Lucie, FL, within the AG-5 (Agricultural — 5, 1 du/5
ac) Zoning District, as legally described in Paragraph "B" and depicted on the attached
map as Exhibit "A".
2. On May 24, 2023, the Board of Adjustment approved BOA Resolution No. 2023-006
granting a variance from the provisions of St. Lucie County Land Development Code
Section 7.05.02 (Streets) to allow a permanent dead-end street to exceed one thousand
(1,000)feet in length.
3. On October 3, 2023, the Board of County Commissioners approved Resolution 2023-
173 granting a Road Paving Waiver and a waiver of the fair share contribution based on
the minimal traffic impacts generated by the proposed development.
4. On October 3, 2023, this Board held a public meeting on this petition.
5. The Development Review Committee has reviewed the site plan petition for the project
and found it meets the technical requirements of the St. Lucie County Land
Development Code and has satisfied the standards of review set forth in Section
11.02.07, Standards for Site Plan Review, of the St. Lucie County Land Development
Code.
6. Planning Staff has performed a detailed analysis of the project and determined it to be
consistent with the St. Lucie County Land Development Code and Comprehensive Plan.
The analysis is found in the Planning and Development Services Department
memorandum titled Carlton Estates - Major Site Plan (MJSP-2303-000107) dated
September 15, 2023.
7. All reasonable steps have been taken to minimize any adverse effect on the immediate
vicinity through site design and landscaping screening.
Resolution No. 2023-166
MICHELLE R.MILLER,CLERK OF THE CIRCUIT COURT File No. MJSP-2303-000107
SAINT LUCIE COUNTY Page 1
FILE Y 525634310/18//202311.3]25 AM
OR BOOK 5059 PAGE 294-300 Doc Type.RESO
RECORDING: $61.00
8. The proposed Major Site Plan, with conditions, therein, will not have undue adverse
effect on adjacent property, the character of the neighborhood, traffic conditions,
parking, utility facilities, or other matters affecting the public safety, and general welfare.
9. The proposed project will be constructed, arranged, and operated so as not to interfere
with the development and use of neighboring property, in accordance with applicable
district regulations.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie
County, Florida:
A. Pursuant to Section Pursuant to Section 11.02.04 of the St. Lucie County Land
Development Code, the Major Site Plan is hereby approved as shown on the drawing
prepared by McCarty & Associates Land Planning and Design LLC, for the property
described in Part "B" below, subject to the following conditions:
1) Within 180 days of issuance of a Vegetation Removal Permit or Exemption, all
Category I listed invasive plant species shall be eradicated from the site.
2) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00., a
vegetation removal permit or exemption shall be issued by the Environmental
Resources Department per LDC 6.00.03.
3) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00., listed
species surveys shall be updated as necessary per individual species-specific
requirements. If any listed species impacts are found to be present as a result of
these surveys, appropriate mitigative measures per state and federal agency
requirements shall be provided prior to initiation of any clearing activities.
4) The developer shall include language on the final plat stating that the owners, heirs
and assigns of the lots indicated on the proposed plat known as Carlton Estates
Subdivision agree to participate and shall be a "yes' vote in any lawfully established
MSTU, MSBU or other special assessment district created for the purpose of
providing paving and/or drainage improvements to Carlton Road.
B. The property on which this Major Site Plan is being granted is described as follows:
Legal Description:
PARCEL 1:
THE SOUTH HALF OF THE NORTHWEST QUARTER OF THE NORTHWEST
QUARTER OF SECTION 3, TOWNSHIP 37 SOUTH, RANGE 38 EAST, ST. LUCIE
COUNTY FLORIDA, LESS AND EXCEPT THE WEST 100 FEET FOR PUBLIC ROADS
AND DRAINAGE.
CONTAINING 910,645 SQUARE FEET OR 20.9055 ACRES, MORE OR LESS.
TOGETHER WITH:
Resolution No. 2023-166
File Na MJSP-2303-000107
Page 2
PARCEL 2:
THE NORTHEAST QUARTER OF THE NORTHWEST QUARTER OF SECTION 3,
TOWNSHIP 37 SOUTH, RANGE 38 EAST, ST. LUCIE COUNTY, FLORIDA.
CONTAINING 1,969,372 SQUARE FEET OR 45.2105 ACRES, MORE OR LESS.
CONTAINING IN ALL 2,880,018 SQUARE FEET OR 66.116 ACRES, MORE OR LESS.
ADDRESS: 9480 Carlton Rd Port St. Lucie, FL 34987
PARCEL I.D. NO.: 4203-223-0001-000-7 &4203-211-0001-000-0
C. This Major Site Plan shall expire after twenty-four (24) months from the effective date
unless a plat is recorded in public records or an extension is granted in accordance with
the provisions of Section 11.02.06 of the St. Lucie County Land Development Code.
D. The developer is advised as part of this Major Site Plan approval that the property
owner(s), developer, etc. including any successors in interest, shall obtain all applicable
development permits and construction authorizations from the appropriate State and
Federal and local regulatory agencies including, but not limited to, the United States
Army Corps of Engineers, the Florida Department of Environmental Protection, Florida
Department of Transportation, South Florida Water Management District, and the St.
Lucie County Environmental Resources, Public Works, and Building Departments prior
to the commencement of any development activities on the property described in Part A.
Issuance of this permit by the County does not in any way create any rights on the part
of the developer to obtain a permit from a state or federal agency and does not create
any liability on the part of the County for issuance of this permit if the developer fails to
obtain requisite approvals or fulfill the obligations imposed by a state or federal agency
or undertake actions that may result in a violation of state or federal law.
E. The conditions set forth in Part "A" are an integral non-severable part of the Site Plan
approval granted by this Resolution. If any condition set forth in Part "A" is determined to
be invalid or unenforceable for any reason and the developer declines to comply
voluntarily with that condition, the Site Plan approval granted by this Resolution shall
become null and void.
F. A Certificate of Capacity, a copy of which is attached hereto as Exhibit "C" and made a
part hereof the Resolution, was granted by the Planning & Development Services
Department Director on October 5, 2023.
G. A recorded copy of this Resolution shall be attached to the site plan drawings
described in Part "B", which plan shall be placed on file with the St. Lucie County
Planning & Development Services Department.
H. This Order shall become effective upon the date indicated below. An appeal of the Board
of County Commissioners' action may be processed within thirty (30) days in
accordance with Section 11.11.02.F, of the St. Lucie County Land Development Code.
Resolution No. 2023-166
File No. MJSP-2303-000107
Page 3
I. This Resolution shall be recorded in the Public Records of St. Lucie County.
After motion and second. the vote on this resolution was as follows:
Cathy Townsend, Chair AYE
Linda Bartz, Vice-Chair AYE
Commissioner Christopher Dzadovsky AYE
Commissioner Larry Leet AYE
Commissioner Jamie Fowler AYE
PASSED AND DULY ADOPTED this 3rd day of October. 2023.
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLOIRDA
BY Lt.)..,\,,L. 94.4
AIR
ATTEST: APPROVED AS TO FORM
AND CORRECTNESS:
d I()r /
DE UTY CLER COUNTY ATT plEY
oJxx-01 coM��
s
. ..-i ...,, m
s -z z?
r4 . ikz. , ,,,.. co
%miry F100°'
Resolution No. 2023-166
File No. MJSP-2303-000107
Page 4
I
Exhibit "A"
Location Map
4
N
s
06e
Subject
Parcel
Resolution No. 2023-166
File No. MJSP-2303-000107
Page 5
Exhibit "B"
Site Plan
• _7______ __ ____ ________________
411`
ts.
• 1, , I 1.71
ill q
1:I I I
Il - Ili
I I II
I I
I il 1 i i I !ill !III
I II il I IN i iI! 7
';' (111511 I I I 0 II 4 ! „ I
t II ' ii • c' : I I I 16 1 i 1111 iii 15
I r, it. I : Xi
1 IWO; III
li 1 ill !.:•
1 4;111 If
iN •
I ill
ll1l 11 I I I
i 1
i I
I
alli 2i '
. i
, ,.,1__ 4 - !,
,_LI -_ . 1.,,,, __, ,
. 1 ( 1 ") ,' ,,,i, •" i .") I ; i ): i } 111111121111. fil.
::.....
I ( ___-•: : .__:---' ------- I --' g.... :-.•
;
1 i .
i rt s 15 I s : it 1111i;,'
. I ii! X- R• ,5 It•
0 ,
t I ill
i
I I I i
I i
t I
1 P
..1,
I ' .1 i
I - '. a;a I a.
I • •••••••• w 0 'l
••
i • .• O .... il;a;a'
0 f I I
1/2 •.I
;Ei 1 IkS ii.1 i .• ii
R- 4 A. X-
lc i 1 •
1 `•,----', •„.......,:L.L........L 17\
__ ' - ----- --T-------.._.---- -...ii--.21--- 1\,&
r .1 liF
. ! piLli
. oiR
‘i I t ii
MI7
Carlton Estates
St Lucie County F lotiea
Major Site Plan ..-
-, •
Resolution No. 2023-166
File No. MJSP-2303-000107
Page 6
Exhibit "C"
Certificate of Capacity
St Lucie County
Certificate of Capacity
Date lur 'u_S Certificate No.
This document certifies that concurrency will be met and that adequate public facility
capacity exists to maintain the standards for levels of service as adopted in the St
Lucie County Comprehensive Plan for:
1.Type of development Major Site Plan
Number of units ui Number of square feet
2.Property legal description& Tax ID no.
•1203-223-0001-000/7&4203-211-0001-000/0
9480 Carlton Road,Port St.Lucie,FL 34987
Carlton Estates
3.Approval: Building Resolution No. 2.1123-I 66 Letter
4. Subject to the following conditions for concurrency:
)ii ned in Res.No.2023-166
Owner's name
he);\ Development LLC
Address
9304 Scarborough CT
Port St.Lucie FL 34986
6.Certificate Expiration Date 10/3/2025
This Certificate of Capacity is transferable only to subsequent owners of the same
parcel,and is subject to the same terms, conditions and expiration date listed herein.
The expiration date can be extended only under the same terms and conditions as the
underlying development orderissued with this certificate, or for subsequent
development r(s)issued for the same property,use and size as described herein.
Signed 7 Date: 10/5/2023
Planning and Development Services Director
St Lucie County,Florida
Thursday.October 5.2023 Pace I of I
Resolution No. 2023-166
File No. MJSP-2303-000107
Page 7