RESOLUTION NO. 2025-021
File No. WTLW-2402-000039
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS GRANTING
A CATEGORY I WETLAND WAIVER PER COMPREHENSIVE PLAN POLICY
6.1.14.2 FOR A PARCEL OF LAND LOCATED ON SOUTH OCEAN DRIVE,
APPROXIMATELY 3/4 OF ONE MILE SOUTH OF MIDDLE COVE COUNTY
BEACH ACCESS, IN ST. LUCIE COUNTY, FLORIDA
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the
testimony and evidence, including but not limited to the staff report, has made the following
determinations:
1. Ryan Brown requested a waiver from the Comprehensive Plan Policy 6.1.14.2 to allow
direct impact for a total of 0.152 acres (6,650 square foot) to Category I mangrove
wetland and 0.003 acres (154 square feet) as depicted on the attached Exhibit B for the
development of single-family residence and associated improvements on the property
depicted on the attached map Exhibit A, and described in Part B below.
2. Permits from FDEP 56-0431895-002-El, issued 1/18/2024 and ACOE SAJ-2023-01958
(NW-JMB), issued 1/22/2024, were obtained which allows for a filled and culverted
driveway access through the wetlands in the amount of 0.104 acres to allow access to
the upland area for construction of a single-family residence. The wetland area to be
filled is comprised of a mixed forested mangrove community dominated by red
mangroves. Due to the wetland being contiguous along the frontage of the eastern
parcel, unavoidable impacts were required for the access drive. The applicant further
minimized direct impacts to the wetland by restricting the driveway to no greater than 30
ft. in width and the utilization of this driveway as a shared driveway with the adjacent
property to the south. Additionally, all proposed development for the single-family
residence was restricted to the buildable uplands and an eastern portion of the upland
buffer. Impacts to the wetland and its associated buffer were offset through the purchase
of 0.2 credits from the County's Bear Point Mitigation Bank, and any available
greenspace onsite was utilized as relocated wetland buffer. The proposed single-family
residence will be constructed on the east portion of the parcel east of Highway Al A.
3. After consideration of staff comments and the standards of review for granting waiver
adopted from Section 10.01.02 of the St. Lucie County Land Development Code, the
Board of County Commissioners has made the following determination.
The requested waiver does meet the standards of review as set forth in Section 10.01.02
of the St. Lucie County Land Development Code and is consistent with the goals,
objectives, and policies of the St. Lucie County Comprehensive Plan, because:
Resolution No. 2025-021
January 21,2025 Page 1
1. The granting of the requested waiver will allow the development of a single-family
residence that shall comply with all applicable building setbacks located within the
HIRD (Hutchinson Island Residential Development) zoning district.
2. The granting of the requested waiver is not anticipated to adversely affect
neighboring properties, as the remaining portion of the wetland and associated
upland buffer will be placed under conservation easement and is consistent with
the surrounding existing neighborhood.
3. A waiver from the 50 ft. associated wetland upland buffer is necessary for
reasonable use of the property and therefore does meet the avoidance and
minimization criteria for impacts as it precludes reasonable use of the subject
property.
4. The requested waiver for direct Category I wetland impacts is not in conflict with
the general spirit and intent of the Land Development Code and the goals,
objectives, and policies of the St. Lucie County Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie
County, Florida:
A. Petition of Ryan Brown for a Category I Wetland Waiver in accordance with
Comprehensive Plan Policy 6.1.14.3 pursuant to Section 10.01.02 Standards of Review
of the Land Development Code, THE NORTH 187.234 FEET (188.67 FEET
MEASURED) OF THE NORTH 440 FEET OF GOVERNMENT LOT 4, SECTION 29,
TOWNSHIP 35 SOUTH, RANGE 41 EAST, LESS THE NORTH 98.67 FEET THEREOF
AND LESS RIGHT-OF-WAY FOR HIGHWAY U.S.A-1-A, located on South Ocean Drive,
approximately IA of one mile north of Middle Cove Beach access is hereby approved as
depicted in Exhibit B, for the property described below, subject to the following
conditions:
1) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, an executed
Conservation Easement over all unimpacted onsite wetlands and their associated
buffers, and the shoreline buffer along the Indian River Lagoon and the coastal dune
preservation zone within the parcel boundaries will be placed under conservation
easement along with the approved Preserve Area Monitoring and Management Plan
(PAMMP), Dune Restoration Plan, and Sea Turtle Protection Plan with an attached
affidavit and cashier's check (payable to the Clerk of the Court for recording fees)to the
County Attorney. The applicant shall also provide a georeferenced GIS shapefile or CAD
file of the conservation easement boundaries to St. Lucie County.
2) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, provide all
appropriate outside agency permits including but not limited to Florida Department of
Environmental Protection (FDEP), Army Corps of Engineers (ACOE), etc.
Resolution No. 2025-021
January 21, 2025 Page 2
3) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, provide
documentation of wetland mitigation purchase to the Bear Point Mitigation Bank.
4) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, provide the
coastal construction control line (CCCL) permit from Florida Department of
Environmental Protection (FDEP) per LDC 6.05.00.
5) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, listed-species
surveys shall be supplied to ERD.
6) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, for the single-
family residential dock west of Highway A1A, if applicable, provide an approved native
vegetative plan for the Indian River Lagoon Shoreline Buffer in accordance with the
minimum planting requirements in LDC 6.02.02.E.
7) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00, to allow for
the elevated/raised dune crossover, provide a permit from the appropriate agencies
prior to access being established. All development shall comply with the requirements
and criteria outlined and LDC 6.02.01.H in order to protect the functions and values of
the estuarine and beach-dune shoreline areas
8) Prior to commencement of development, including, but not limited to clearing, filling,
excavation, grading, or planting of vegetation, as defined in LDC 2.00.00., the lift station
shall include the following precautions to prevent contamination of the wetland in the
event of a system failure (Comprehensive Plan Policy 6.1.14.2.c), shall be provided:
a. The top of wetwell and electrical components will be sited sufficiently above the
flood elevation of concern.
b. A permanent emergency generator to ensure functionality of the station in the
event of a power outage shall be provided.
c. An appropriate alarm (high level, pump failures, etc.) and a means of notification
(e.g. autodialer) to notify of problems at the lift station so utility personnel can
respond in a timely manner shall be installed.
d. Routine maintenance to preventing a failure at a lift station shall be performed.
9) Prior to the issuance of a Certificate of Occupancy, all seaward and shore-perpendicular
facing windows and doors shall be fitted with tinted glass or film with a visible light
transmittance value of forty-five (45) percent or less. A registered Florida architect or
engineer shall conduct a nighttime survey with all of the beachfront lighting turned on
and provide a report of the inspection to the Environmental Resources Department as
outlined in the approved Sea Turtle Protection Plan. If any violations of the sea turtle
lighting code are identified, a Certificate of Occupancy shall not be issued until all
violations have been corrected.
Resolution No. 2025-021
January 21, 2025 Page 3
10)Prior to issuance of a Certificate of Occupancy all Category I listed invasive plant
species shall be eradicated from the site.
B. The property on which this waiver is being approved is described as follows:
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF ST.
LUCIE, STATE OF FLORIDA, AND DESCRIBED AS FOLLOWS:
THE NORTH 187.234 FEET (188.67 FEET MEASURED) OF THE NORTH 440 FEET
OF GOVERNMENT LOT 4, SECTION 29, TOWNSHIP 35 SOUTH, RANGE 41 EAST,
LESS THE NORTH 98.67 FEET THEREOF AND LESS RIGHT-OF-WAY FOR
HIGHWAY U.S. A-1-A, SAID LANDS SITUATE, LYING AND BEING IN ST. LUCIE
COUNTY, FLORIDA.
BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT 3 INCH BY 3 INCH CONCRETE MONUMENT MARKING THE POINT
OF INTERSECTION OF THE SOUTH LINE OF THE NORTH 187 .234 FEET OF SAID
GOVERNMENT LOT 4, (SAID CONCRETE MONUMENT BEING 188.67 FEET AS
MEASURED SOUTH OF AND PERPENDICULAR TO A 3 INCH BY 3 INCH
CONCRETE MONUMENT MARKING A POINT ON THE NORTH LINE OF SAID
GOVERNMENT LOT 4), WITH THE EAST RIGHT OF WAY LINE OF STATE ROAD A-
1-A(OCEAN DRIVE)A 100 FOOT RIGHT OF WAY, SAID RIGHT OF WAY LINE BEING
THE SAME SHOWN ON FLORIDA DEPARTMENT OF TRANSPORTATION RIGHT OF
WAY MAP SECTION 9405-107; THENCE N89°47'42"E, ALONG SAID SOUTH LINE A
DISTANCE OF 638 FEET MORE OR LESS TO THE MEAN HIGH WATER LINE OF
THE ATLANTIC OCEAN; THENCE RUN NORTHERLY ALONG SAID WATER LINE TO
A POINT IN A LINE 98.67 FEET SOUTH OF AND PARALLEL TO SAID NORTH LINE
OF GOVERNMENT LOT 4; THENCE S89°47'42"W ALONG SAID PARALLEL LINE A
DISTANCE OF 653 FEET, MORE OR LESS TO A POINT IN THE EAST RIGHT OF WAY
LINE OF SAID STATE ROAD A-1-A, SAID POINT ALSO BEING N29°28'59"W A
DISTANCE OF 103.18 FEET FROM THE POINT OF BEGINNING; THENCE
CONTINUE S89°47'42"W A DISTANCE OF 114.64 FEET TO A POINT IN THE WEST
RIGHT OF WAY FINE OF SAID STATE ROAD A-1-A; THENCE CONTINUE
S89°47'42"W A DISTANCE OF 537 FEET, MORE OR LESS TO THE EAST MEAN HIGH
WATER LINE OF THE INDIAN RIVER; THENCE RUN SOUTHERLY ALONG SAID
WATER LINE TO A POINT IN SAID SOUTH LINE OF THE NORTH 187.234; THENCE
N89°47'42"E, ALONG SAID LINE A DISTANCE OF 577 FEET, MORE OR LESS TO
THE POINT OF INTERSECTION OF SAID SOUTH LINE WITH THE WEST RIGHT OF
WAY LINE OF SAID STATE ROAD A-1-A; THENCE CONTINUE N89°47'42"E A
DISTANCE OF 114.64 FEET TO A THE POINT OF BEGINNING.
LESS AND EXCEPT THAT PORTION OF THE ABOVE DESCRIBED LAND LYING
WITHIN THE RIGHT OF WAY OF SAID STATE ROAD A-1-A..
Resolution No. 2025-021
January 21, 2025 Page 4
C. The waiver approval granted under this Resolution is specifically conditioned to the
requirement that the petitioners, including any successors in interest, shall obtain all
necessary development permits and construction authorizations from the appropriate
State and Federal regulatory authorities, including but not limited to: the United States
Army Corps of Engineers, the Florida Department of Environmental Protection, and the
South Florida Water Management District, prior to commencement of development
activities on the property described in Part B.
D. A copy of this resolution shall be attached to the plan exhibit described in Part A, which
plan shall be placed on file with the St. Lucie County Environmental Resources Director.
E. The conditions set forth in Part A are an integral nonseverable part of the waiver approval
granted by this resolution. If any condition set forth in Part A is determined to be invalid
or unenforceable for any reason and the developer declines to comply voluntarily with
that condition, the waiver approval granted by this resolution shall become null and void.
F. This waiver shall expire twelve months from the date of adoption unless a building
permit is approved, or an extension is granted in accordance with Section 10.01.06 of
the St. Lucie County Land Development code.
G. The Order shall become effective upon the date indicated below. An appeal from the
Board of County Commissioners' action may be processed within thirty (30) days in
accordance with Section 11.11.02(F), of the St. Lucie County Land Development Code.
H. This resolution shall be recorded in the Public Records of St. Lucie County. The
recording of this resolution does not authorize the commencement of any on-site
development activities without obtaining such further development permits as may be
required.
Resolution No. 2025-021
January 21, 2025 Page 5
After motion and second, the vote on this resolution was as follows:
Jamie Fowler, Chair Yea
Larry Leet, Vice-Chair Yea
James Clasby, Commissioner Yea
Erin Lowry, Commissioner Yea
Cathy Townsend, Commissioner Yea
PASSED AND DULY ADOPTED this 21st day of January 2025.
BOARD OF COUNTY
COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY
Chair
ATTEST: APPROVED AS TO FORM
AND CORRECTNESS.
EPUTY CLER COUNTY ATTOR EY
GOM Aga.
J2 1 ' ;\
44.1
•,
Resolution No. 2025-021
January 21,2025 Page 6
Exhibit A - General Location Map
J >A7k 4.. `A :.� sr
.
. .!...1„ ,eiegl*.kt:il-t.),kfe -'r- .., :-:.• -:.,...-,-.:,.,-,!:,', ,/1....,, ,.
Subject property • Subject property
Indian ,tg +y z. k "
vAti
River ,, s v.:.
Lagoon _?'fig
Resolution No. 2025-021
January 21 2025 Page 7
•
Exhibit B - Site Plan
am cum — -
lt
4 3.
W .I i { :i y,Ei,
�z j 4 --- -
+„ /ma's'
}psi,.. __,1
MI!
F
Ti J t'i riim , /'-1
Mg
of
r j,
�Ta: I
,. i.p, i
If r: `.I /'"': 1
iiEi � •♦ t
• x 1g
IMF) • ••••�•� 1 ►f
!t�s gi: t'
•�• •' 1
s, q
••• •
; i
.�
•s• , r
I!! `
Resolution No. 2025-021
January 21, 2025 Page 8