HomeMy WebLinkAbout26-110RESOLUTION NO. 2026-110
A RESOLUTION ACCEPTING THE FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM (LAP) SUPPLEMENTAL AGREEMENT # 1 (No. 453491-1-
58-01) FOR THE ST. JAMES DRIVE PEDESTRIAN WALKWAY (NE ROYCE AVENUE TO
NE LAZY RIVER PARKWAY) PROJECT AND AUTHORIZING THE CHAIR TO EXECUTE
THE AGREEMENT AND FURTHER AUTHORIZING THE COUNTY ATTORNEY TO
EXECUTE THE AGREEMENT BY APPROVING IT AS TO FORM AND CORRECTNESS.
WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, has made the following
determinations:
1. The Department of Transportation has awarded the County Transportation Alternatives Program
(TAP) grant funds for FY 2025/26 for the St. James Drive Pedestrian Walkway (NE Royce Avenue to NE Lazy River
Parkway). Supplemental Agreement #1 decreases federal funds to the agreement.
2. The Board should authorize and approve execution of the LAP supplement agreement #1
(453491-1-58-01) with the Department of Transportation for the above -referenced project.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. Lucie County, Florida:
1. The Board hereby accepts and approves the Supplemental Agreement #1 with the Department of
Transportation (453491-1-58-01) for the St. James Drive Pedestrian Walkway project (NE Royce Avenue to NE Lazy
River Parkway).
2. The Board hereby authorizes and Chair to execute the above -referenced agreement and further
authorizes the County Attorney to execute the agreement by approving it as to form and correctness.
After motion and second, the vote on Resolution 2026-110 was as follows:
ATTEST:
Chair
Jamie Fowler
AYE
Vice -Chairman
Larry Leet
AYE
Commissioner
James Clasby
AYE
Commissioner
Erin Lowry
AYE
Commissioner
Cathy Townsend
AYE
PASSED AND DULY ADOPTED this 7th day of July 2026.
`Gc�F COUNTI.F00
V
BOARD OF COUNTY COMMISSIONERS
ST. LUCIE COUNTY, FLORIDA
BY:
CHAIR
APPROVED AS TO FORM AND CORRECTNESS:
COUNTY,kTfORNEY
Page 1 of 1
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM
SUPPLEMENTAL AGREEMENT
525.010-32
LOCALPROGRAMS
03/22
SUPPLEMENTAL NO.
CONTRACT NO.
G3013
FPN
453491-1-58-01
FEDERAL ID NO. (FAIN)
D425-093-B
FEDERAL AWARD DATE
03/12/2026
Page 1 of 3
RECIPIENT UNIQUE ENTITY ID SAM NO.
JPL2MN5LS2Q8
Recipient, Saint Lucie County desires to supplement
the original Agreement entered into and executed on March 17, 2026 as identified above. All
provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this
supplement.
The changes to the Agreement and supplements, if any, are described as follows:
PROJECT DESCRIPTION
Name St. James Drive from NE Lazy River Parkway to NE Royce Avenue Length 0.245 miles
Termini NE Lazy River Parkway to NE Royce Avenue
Description of Work: Construction of a new sidewalk ranging from six (6) feet to eight (8) feet in width, along with the
installation of Americans with Disabilities Act (ADA)-compliant curb ramps, embankment grading, and slope stabilization
along the east side of St. James Drive from Northeast (NE) Royce Avenue to Northeast (NE) Lazy River Parkway.
Sidewalk construction will begin at NE Royce Avenue, matching the existing six (6)-foot-wide sidewalk. Approximately
130 feet north of this point, the sidewalk will widen to eight (8) feet and continue northward before terminating at the tie-
in with the existing sidewalk just south of NE Lazy River Parkway.
Reason for Supplement and supporting engineering and/or cost analysis: The supplemental agreement reconciles the
LAP Agreement total project cost with the Department's concurrence, and the Local Agency construction bid award of
$273,719.00 (Two Hundred Seventy -Three Thousand Seven Hundred Nineteen and Zero Cents).
As a result, the Supplemental Agreement decreases the Federal Funds amount by $45,709.00 (Forty -Five Thousand
Seven Hundred Nine and Zero Cents) and increases the local funds by $10,198.00 (Ten Thousand One Hundred Ninety -
Eight and Zero Cents).
Refer to Exhibit "B" attached hereto and made a part hereof, which replaces Exhibit "B" that was attached to the original
Agreement.
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM
SUPPLEMENTAL AGREEMENT
ADJUSTED EXHIBIT "B" SCHEDULE OF FINANCIAL ASSISTANCE
RECIPIENT NAME & BILLING ADDRESS: Saint Lucie County
2300 Virgina Avenue
Fort Pierce, FL 34982
FINANCIAL PROJECT NUMBER:
453491-1-58-01
525-010-32
LOCALPROGRAMS
03/22
Page 2 of 3
PHASE OF WORK
B Fiscal Year
Y
FUNDING
(')
PREVIOUS TOTAL
PROJECT FUNDS
TI
ADDITIONAL
PROJECT FUNDS
(3)
CURRENT TOTAL
PROJECT FUNDS
(a)
TOTAL LOCAL
FUNDS
(5)
TOTAL STATE FUNDS
F
TOTAL FEDERAL
FUNDS
Design
FY: (Insert Program Name)
FY: (Insert Program Name)
FY: (Insert Program Name)
Total Design Cost
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
Right -of -Way
FY: (Insert Program Name)
FY: (Insert Program Name)
FY: (Insert Program Name)
Total Right -of -Way Cost
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
Construction
FY: 2026 ( Transportation Alternative Funds)
FY: (Insert Program Name)
FY: (Insert Program Name)
Total Construction Cost
$309,230.00
($35,511.00)
$273,719.00
$43,934.00
$229,785.00
$309,230.00
$35,511.00
$273,719.00
$43,934.00
$ 0.00
$229,785.00
Construction Engineering and Inspection (CEI)
FY: (Insert Program Name)
FY: (Insert Program Name)
FY: (Insert Program Name)
Total CEI Cost
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
(Insert Phase)
FY: (Insert Program Name)
FY: (Insert Program Name)
FY: (Insert Program Name)
Total Phase Costs
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
TOTAL COST OF THE PROJECT
$309,230.00
$35,511,00
$273,719.00
$43,934.00
$ 0.00
$229,785.00
COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES:
I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by Section 216.3475, F.S. Documentation is on file evidencing the
methodology used and the conclusions reached.
Mya Gray
District Grant Manager Name
Signature
Date
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM 525-010.32
SUPPLEMENTAL AGREEMENT LOCALPROGRAMS
Page 3 of 3
IN WITNESS WHEREOF, the parties have executed this Agreement on the date last ascribed herein.
RECIPIENT Saint Lucie County
Jamie Fowler
Chair
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
By:
Name: John P. Krane, P.E.
Title: Director of Transportation Development
Date:
Legal Review: