Loading...
HomeMy WebLinkAbout02-0291 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 4O 41 RESOLUTION NO. 02-029 File No.: BCC-02-001 A RESOLUTION GRANTING AN EXTENSION OF A CONDITIONAL USE PERMIT AND MAJOR SITE PLAN EXTENSION FOR A PROJECT KNOWN AS DUKE ENERGY FT. PIERCE GENERATING STATION WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the testimony and evidence, including but not limited to the staff report, has made the following determinations: CONDITIONAL USE PERMIT EXTENSION On February 6, 2001, this Board approved Resolution 01-007 which granted a Conditional Use Permit to Duke Energy Ft. Pierce, LLC, for the construction of a 640 megawatt, electric generating plant in the U (Utilities) Zoning District for the project known as Duke Energy Ft. Pierce Generating Station. The developer of the Duke Energy Ft. Pierce Generating Station has requested that they be granted a 24 month extension to their Conditional Use permit approved thorough Resolution 01-007, which if approved would carry this projects approval period through to February 6, 2004. On January 22, 2002, this Board held public hearings on the petition, after publishing notice at least 10 days prior to the hearing and notifying by mail all owners of property within 500 feet of the subject property. SITE PLAN EXTENSION On February 6, 2001, this Board approved Resolution 01-007 which granted a Site Plan Approval to Duke Energy Ft. Pierce1 LLC, for the construction of a 640 megawatt, electric generating plant at the southeast side of Glades Cut-Off Road, approximately one mile south of the intersection of Glades Cut-Off Road and Selvitz Road in the U (Utilities) Zoning District for the project known as Duke Energy Ft. Pierce Generating Station. January 15, 2002 Page 1 Resolution 02-029 Duke Conditional Use Extension CD CD C-j r._,d t-...q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 4O 41 42 43 44 The developer of Duke Energy Ft. Pierce Generating Station has requested an amendment to the site plan conditions approved in Resolution 01-007. On January 22, 2002, this Board held public hearings on the petition, after publishing notice at least 10 days prior to the hearing and notifying by mail all owners of property within 500 feet of the subject property. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of the St. Lucie County, Florida: Pursuant to Section 11.07.05(F) of the St. Lucie County Land Development Code the Conditional Use Permit granted to Duke Energy Ft. Pierce, LLC., for operation of a 640 megawatt electric generating plant in the U Zoning District, which project is to be known as Duke Energy Ft. Pierce Generating Station, is hereby extended for an additional 24 months, which would now expire on February 6, 2004. Pursuant to Section 11.07.05(F) of the St. Lucie County Land Development Code, no further extensions to this conditional use permit are available. Pursuant to Section 11.02.06(B) of the St. Lucie County Land Development Code, the Site Plan approval granted to Duke Energy Ft. Pierce, LLC., for the construction of a 640 megawatt electric generating plant in the U Zoning District, which project is to be known as Duke Energy Ft. Pierce Generating Station, is hereby extended for an additional 12 months, which would now expire on February 6, 2003. The property on which this Conditional Use Permit and Major Site Plan Extension is being granted is described as follows: Parcel A A portion of land lying within Section 31, Township 35 South, Range 40 East, St. Lucie County, Florida. Commence at the southwest corner of Section 31, Township 35 South, Range 40 East; thence run north 89°57'18" east, along the south line of the southwest ¼ of said Section 31 for a distance of 1005.74 feet; thence departing said line run north 00002'42" west, for a distance of 49.50 feet to the Point of Beginning, said point being a point on the north line of the North St. Lucie River Water Control District Canal NO. 102, said point also being a point on a curve concave southwesterly, having a radius of 3336.33 feet, a Central Angle of 14°41'59", a chord bearing of north 29°01'09" west and a chord length of 853.62 feet; thence along the arc of said curve, an arc length of 855.97 feet to a Point on the southeasterly right-of-way line of the Florida East Coast Railroad; thence run north 44044'24" east, along said southeasterly right-of-way line for a distance of 1495.22 feet; thence departing said line run south 45°15'05" east, for a distance of 334.48 feet to a point on a line lying 1035.50 feet south January 15, 2002 Page 2 Resolution 02-029 Duke Conditional Use Extension 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 4O 41 42 43 44 45 46 47 of and parallel to the north line of the south 1/2 of said Section 31; thence run south 89059'47" east, along said line for a distance of 1180.27 feet; thence run south 22°32'03'' west, for a distance of 1701.80 feet to a point on the aforementioned north line of the North St. Lucie River Water Control District Canal No. 102; thence run south 89°57'18" west, along said north line for a distance of 1404.02 feet to the Point of Beginning. Together with: Parcel B: A portion of land lying within Section 31, Township 36 South, Range 40 East, St. Lucie County, Florida. Commence at the southwest corner of said Section 31; thence north 89°57'18" east, along the south line of said Section for a distance of 2409.76 feet; thence departing said south line run north 00002'42" west, for a distance of 49.50 feet to the north right-of-way line of the North St. Lucie River Water Control District Canal No. 102 and the Point of Beginning; thence north 22°32'03'' east, for a distance of 1701.80 feet to a point 1035.50 feet south of the north line of the south 1~ of said Section 31; thence south 89°59'47" east, along said south line for a distance of 87.43 feet to a point on a curve concave southeasterly having: a radius of 744.49 feet, and a central angle of 23°25'14" and a chord bearing of north 36049'24'' east; thence along the arc of said curve an arc length of 304.32 feet thence south 41°27'59" east, for a distance of 417.49 feet; thence south 00°03'39" west, for a distance of 1500.00 feet to the north right-of-way line of aforesaid Canal 102; thence south 89°57'18" west, along said north right-of-way lien for a distance of 1195.68 feet to the Point of Beginning. Containing 99.5125 acres, more or less. (Location: Southeast side of Glades Cut-Off Road, approximately one mile south of the intersection of Glades Cut-Off Road and Selvitz Road.) The approvals and authorizations granted by this Resolution for the purpose of obtaining building permits on this property, shall expire as noted in Paragraph A and B above, unless the developer has obtained a building permit for this project. Pursuant to Section 11.02.08 of the St. Lucie County Land Development Code, this Board approved six conditions for the Duke Energy Ft. Pierce Generating Station within Resolution 01-007, which are hereby amended to read as follows. bu!Id!ngcv.""-. *~'--,..v ~.,~,";*,- Within sixty (60) days of site mobilization, all exotic vegetation found on the site shall be removed. The applicant shall connect to central water and sewer services upon the installation of central water and sewer lines from the project site to Midway Road at its intersection with Milner Road. The use of the private well fo__r potable water uses shall be discontinued upon such connections, but may be continued cxccpt for thc !rrigation use (until such time as an alternative water January 15, 2002 Page 3 Resolution 02-029 Duke Conditional Use Extension 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 resource for irriqation is available) and for plant process water. Prior to the issuance of any certificate of occupancy or other use authorization for this facility, the final plats for Lots 7 and 8 of the Midway Industrial Park, Unit III, ,~hal~ have been approved by St. Lucie County, and all required improvements necessary to service the Duke Energy site, consistent with that plat, shall have been completed, or security provided for, in a manner acceptable to St. Lucie County. 4. (no change from Resolution 01-007) As part of the construction of this project, *~"- ccnctruct that portion of South Jenkins Road from Environment Way, north to the project entrance shall be constructed. A!! wcrk "'- t This work is to be dcnc completed or bonded for prior to the issuance of a Certificate of Occupancy for this project, and may be done as part of the required improvements for the subdivision known as Midway Industrial Park, Unit III. 6. (no change from Resolution 01-007) The Conditional Use Extension/Major Site Plan granted under this resolution is specifically conditioned to the requirement that the petitioner, Duke Energy Ft. Pierce, LLC., including any successors in interest, shall obtain all necessary development permits and construction authorizations from the appropriate State and Federal regulatory authorities, including but not limited to; the United States Army Corps of Engineers, the Florida Department of Environmental Protection, and the South Florida Water Management District, prior to the issuance of any local building permits of authorizations to commence development activities on the property described in Part C. Go A copy of this resolution shall be placed on file with the St. Lucie County Community Development Director. After motion and second, the vote on this resolution was as follows: Chairman Doug Coward AYE Vice-Chairman Cliff Barnes AYE Commissioner John Bruhn AYE Commissioner Paula Lewis AYE Commissioner Frannie Hutchinson AYE January 15, 2002 Page 4 Resolution 02-029 Duke Conditional Use Extension 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 4O 41 42 43 PASSED AND DULY ADOPTED this 22nd day of January, 2002 BOARD OF COUNTY COMMISSIQ .~, RS ST. LUCIE COUNTY, FLORIDA,. ATTEST~~ DI::P'UfFY CLERK ,~/~ H:\Conditional Uses~::)uke Energy\12202\Res02-029 January 15, 2002 Page 5 Resolution 02-029 Duke Conditional Use Extension