Loading...
HomeMy WebLinkAboutENGINEERING t ,i PAUL WELCH INC. Mechanical Electrical Civil Engineering 1984 S.W. Biltmore St. Suite#.114 Port Saint Lucie,FL 34984 Phone(772)785 -9888 Email pwelchinc@aol.com February 22,2017 Re: Williams Re-Roof 2675 Twin Oaks Trail Fort Pierce,FL 34945 SCOPE OF WORK: Remove existing roofing and install new 5-V Crimp Metal Roof(Gulf Coast Supply& Manufacturing FL# 11651.13) at above referenced residence address over new underlayment and existing plywood sheathing. DESIGN CRITERIA: FBC 2014 ASCE?-10 PROJECT DATA: BUILDING HIEGHT= 10' A=3' MEAN ROOF HIEGHT=<15' ROOF ANGLE=3:12 SHAPE=PITCHED GABLE EM PROTANCE FACTOR= 1.00 WIND VELOCITY V ult= 160 MPH WIND VELOCITY V asd= 124 MPH EXPOSURE=C ENCLOSURE CLASS=ENCLOSED BUILDING INTERNAL PRESSURE COEFFICIENT=-0.18 APPLIED UPLIFT DESIGN PRESSURES ON SLOPED ROOF '(Psfl: ZONE 1 (Field)=-30.7 ZONE 2 (Perimeter/Ridge)_-51.9 ZONE 3 (Corners) _-76.2 `Paul Welch Inc. Paul Welch P.E.Reg.No.29945 February 22,2017 2675 Twin Oaks Trail Fort Pierce,FL i U4 I METAL ROOFING ATTACHMENT REQUIREMENTS: Metal roofing to be attached with#9- 15 x 1 Y2"long(minimum V4"penetration through plywood sheathing)Woodgrip screws with weather sealing washers spacing as follows: r. ALL FASTENERS IN THE FLAT OF THE PANEL ii ZONE I (Field): Fasteners adjacent to ribs one side(Type 1 per product approval) at 16" O.C. ZONE 2 (Perimeter/Ridge): Fasteners adjacent to ribs one side(Type 1 per product approval) at 16" O.C. ZONE 3 (Corners): Fasteners adjacent to ribs one side(Type 1 per product approval) at 16" O.C. Zones 1,2 &3 Design uplift Pressure: -94.25 psf Zones 1,2&3: 94.25 >76.2>51.9>30.7 Therefore O.K. I �I NOTE: CONTINUOUS APPROVED LAP SEALANT MUST BE USED AT ALL PANEL SIDELAPS FOR SLOPES LESS THAN 3:12. UNDERLAYMENT: Underlayment shall be Tri-Built Roofing Products FL# 16048.1 "Tri-Built S/A HT TU". While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place,peel-off the release film diagonally while holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water.Vertical seams should be 6inches and staggered not less than 2-ft from vertical seams in the course below.All-over-granule end- laps shall be sealed using either heat-welding or hot air welding,techniques. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place,working from'the center of the valley or ridge in each direction.For valleys, apply the sheet starting at the lowest point and work upward. i Paul Welch Inc. Paul Welch P.E. Reg.No. 29945 February 22,2017 2675 Twin Oaks Trail Fort Pierce,FL 2 of 4 4 ti II I I' I r DECK INSTALLATION: Re-nail all plywood sheathing(15/32"thick minimum)with 8D ring-shank nails at 4"O.C. perimeter and 6" O.C. field for all zones. it All work to be in compliance with product approval (FL# 11651.13), (FL# 10648.1), manufacturer's specifications, and the Florida Building Code 2014. i I' 1I1 i I I i d I I yl 7 f I' I I I� I I {Paul Welch Inc. Paul Welch P.E. Reg.No. 29945 February 22,2017 2675 Twin Oaks Trail Fort Pierce, FL f, 3 of 4