HomeMy WebLinkAboutRevisions uE i VE
OFFICE USE ONLY: MAR 2 4 201
DATE FILED: •�. �� PERMTT# 02' `7 PERFlITTING
St. Lucie County, FL
REVISION FEE: 3-lS.00 RECEIPT#
PLANNING&DEVELOPMENT SERVICES
BUILDING&CODE REGULATION D"ION
2300 VIRGINIA AVENUE
FORT PIERCE,FL 34982-5652
(772)462-1553 FAX(772)462-1578
APPLICATION FOR BUILDING PERMIT REVISIONS
PROJECT INFORMATION
LOCATIO1.
ADDRESS:
��i'o FEg l Lu(►'1 I Ci+ p f, Of• t,ucl e
2. DETAILED DESCRIPTION OF PROJECT eerA 1 ' SGC 1�717a ��
REVISIONS:
U erg -�i7 7T J
3. CONTRACTOR INFORMATION:
STATE of FL REG./CERT.#: '3 ST.LUCIE COUNTY CERT.#:
BUSINESS NAME: 00 rOC
QUALIFIERS NAME: K?-lL i7
ADDRESS: CD - Ltd
CITY: STATE: R, ZIP:
PHONE(DAYT ): '171- '11- n9 yt ffl FAX: �r72- 7'�-�'t�C
4. OVMR/BUILDER INFORMATION::
NAME: >Pm na mp t i= IAV G 5 1V
ADDRESS: re-K i ioy\IUB (!,-r
CITY: 3-• STATE: f=I ZIP:
PHONE: '?'lz- 4'1� I .g 3 FAX:
5. ARCHITECT/ENGINEER INFORMATION:
NAME:
ADDRESS:
CITY: STATE: ZIP:
PHONE(DAY113M): FAX:
Revised 07/22/2014
7/812d16 Florida Building Code Online
B�^fie. A�l qa R,e 2h �.�� 'e'ij sal Sp;. N$'� � a�•�h �� ..�'i?`:�"-'.� T
y 2 --
9"
iHi �����;,;±,—,u��„� BCIS Hame i Log In i User RaglstraUon ; Hot Topics � Submit Surcharge Stats&Facts i PubiigUans i FBC Staff j SCIS Site Map Links Search
$US nessf}n
Prof�ssibal E ��
Product uct App rova l -
IfSE0.:Public User i
€;,,--,cj -dation
. IE Product Approval Menu>Product or Application Search>Application List>Application Detall BAR 2Q17
1011 1 FL# FL15529-R1
Application Type Revision PERMITTING
St. Lucie County,, FL
Code Version 2014
Application Status Approved
Comments
Archived
Product Manufacturer IKO Industries,Ltd
Address/Phone/Email 40 Hansen Road South
Brampton, NON-US L6W 3114
(708)496-2800 Ext 200
rmetzOO1@tampabay..rr.com
Authorized Signature Robert Metz
rmetzDD1@tampabay.rr.com
Technical Representative Bob Metz
Address/Phone/Email REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg, FL 33703
(727) 776-5261
rmet!001@tampabay.rr.com
Quality Assurance Representative Don Shaw
Address/Phone/Email IKO Industries LTD
120 Hay Rd.
Wilmington, DE 19808
(717) 579-6706
don.shaw@lko,com
Category Roofing
Subcategory Underlayments
Compliance Method Test Report
Testing Lab PRI Construction Materials Technologies, LLC
Quality Assurance Entity Keystone Certifications,Inc.
Quality Assurance Contract Expiration Date 06/26/2025
Validated By Zachary R. Priest, P.E.
Validation Checklist-Hardcopy Received
Certificate of Independence Fl-15524 R1 COI'FL12838 R2 COI PRI CMT Cert of Independencejl].odf
FL15529 R1 COI FM- Certificate of Independence 3-25-2011.pd
Referenced Standard and Year(of Standard) S>t,@ndard Year
D1970 2009
Equivalence of Product Standards
Certified By
https://www.floridabLAIding.orgipr/pr app dd.aspx7param=wGEVXQwtDgvKmQdIOUtQt[XdgHl&-AWg7ZYjps%2luk8a6ZyMdl6cig°/`3d%3d 1/2
7/8/2016 Florida Building Code Online
Product Approval Method Method 1 Option B
Date Submitted 06/29/2015
Date.Validated 07/14/2015
Date Pending FBC Approval 07/23/2015
Date Approved 10/16/2015
Summary of Products
FL# Model,Number or Name Description
15529.1 StarmShield Standard Ice and #7910033
Water Protector
Limits of Use Installation Instructions
Approved for use In HVHZ:No FL15529 R1 II SShieldIW0806 ARplicatlon Instructions
Approved for use outside HVHZ:Yes 201?odf
Impact Resistant: N/A Verified By: PRI Construction Materials Technologies, LLC
Design Pressure:N/A Test Reports
Other. FL15529 R1 TR IKO-081-02-01 Reoort ASTM D 1970
StormShleld Standard Ice and Water Protector 04-2012
PRl.pdf
FI 1 SS29 R1 TIS IKO-143-02-01 FBC 2014 Letter--E-BC
FI-15529.pdf
!CinCi: r�RXi
Contact Us:;2601 Blair Stone Road.Ibllahassee FL 32399 Phanem 850-487-18 4
The State of Florida Is an AA/EEO employer.Copyright 2007-2013 State of Florida. ::Privacy S tement::Accessibility statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please contact 850.487.1395.-Pursuant to Section
455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they have
one.The emalis provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a
Personal address,please provide the Department with an email address which can be made available to the public.To determine If you are a licensee under Chapter
455,F.S.,please click here.
Product Approval Accepts:
Satin
httpsj/www.floridabuilding.orgtpr/pr app dd.aspx?param=wGEVXQwtDgvKmQcUOUtQtlXdgHl6aAWg7ZYjps%2fluk8a6ZyMdl6clgg/o3d*/gad 212
If
CONSTRUCTION MATERIALS
TECHNOLOGIES
Brad Grzybowski
Managing Director
July 9,2015
Dear Sir/Madam,
PRI-CMT tested several products for IKO Industries and subsequently issued LaboratoryTest Reports.These
reports have been utilized to support FL15529.This letter serves to establish compliance of legacy test reports
to FBC 2014.
FL15529—StormShield Standard Ice and Water Protector
Product Specification
a Applicable product specification:ASTM D1970
a FBC 2014 referenced standard year:ASTM D1970-09
a Test Report: PRI Project/Report Number IKO-081-02-01 states compliance to ASTM D1970-08.
a Action: Establish equivalency between ASTM D1970-08 and ASTM D1970-09.
a Conclusion:Compliance to FBC 2014 established,
Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen,FL P.E.do not
have nor plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
Signed: �'4 C Signed: i /L.
Brad Grrybo .ki Duc T. en
Managing Director Florida RWMe-re rofessionai Engine r
P.E.Number.65034
Date: July 9,2015 Date: July 9,2015
IKO-143-02-01
PRI Construction Materials Technologies,I.I.C.6412 Badger Drive Tampa,FL 33610 Tel:813.621-5777 Fax:813.621-5840 a-mag:materialstesting@priantcom WebSite:htlp1kWW.pricmLcam
APPLYING IKO'S STORMSHIELD
ICE & WATER PROTECTOR
Caution
• Read all instructions before proceeding with application.
• Membrane must always be covered by shingles or other roofing materials. It must not be left exposed
to the weather.
• This product is a vapour retardant. Space under roof deck must be properly ventilated to avoid
moisture condensation.
• In cool temperatures membrane should be tacked in place with mechanical fastenings.
• Installation isnot recommended when air and substrate surface temperatures are less than 5°C (400F).
APPLICATION DIRECTIONS
Surface Preparation
• The roof deck must be clean, smooth, dry and free of sharp protrusions.
• Metal and masonry surfaces must be primed.
Installation
1. Cut the membrane into 3 m to 4.5 m (10 ft. to 15 ft.)lengths.
2. Unroll and align with the lower edge of roof. Tack top edge with four equally-spaced temporary
fasteners.
3. Lift the lower half and remove the lower release film, exposing the adhesive surface.
4. Carefully reposition the membrane down onto the deck and press firmly in place. Avoid wrinkles.
Remove temporary fasteners.
5. Fold top half down and remove release film.
6. Carefully reposition the membrane up onto the deck and press firmly in place. Avoid wrinkles.
• If two courses are required,the top course should overlap the selvage tape on the lower course by
75 mm(3").
• End laps must be at least 15 cm (6")and rolled to ansure adhesion and should be located at least 61
cm (24")from those in the previous course.
• Apply each course carefully.
• Best suited for low sloped roof areas. Cover entire area with StormShield Standard Ice and Water
Protector, lapped as outlined above, and then shingle as per normal shingle exposures.
.Valleys and Ridges
• Cut the membrane into 1.2 m to 1.8 m (4 ft.to 6 ft.) lengths. In the valley,start at the low point and
work upwards, overlapping each sheet at least 15 cm (6"). Peel off the release film and centre the
sheet over the'valley or ridge. Drape and press in place working from the centre outward toward the
edges.
• Membranes must not be left exposed in an open valley.
Ice Dam Protection
• Membrane must be applied to reach above the highest expected level of ice dams, and at least 61 cm
(24")up the roof from the vertical projection of the interior surface of the outside wall.
Drip Edge
• Drip edges must be located under the membrane at the eaves,and over the membrane at rake edges.
Note
• Do not remove selvage tape.
Storage
• Store rolls in their carton until application. Store inside or under cover not over 40°C (104°F).-
SShield[W 08-08
•!, r, rc ,`':'r��J�'�r:i..i fI. � •+.r i�•. ..i l�.' rt.�' �• f.�.^r,,'
SShieldlW 08-06