HomeMy WebLinkAboutProduct Approval Florida Building Code Online Pagel of 3
a r
101
SCIS lk me Log In User Registration Hot Topic Submit Surcharge Stats 9 Facts i Publicabom ' FOC Stall SCIS Site Map Unks ' Search
v�
Product Approval
USER:Public User
h B V lU
Product Approval Menu>Product or Apolkatbn Search>Application Ust>Applif9tion Detail j, �}
FL# FL7006-R9 FEB 2 4 2017
Application Type Revision PER'tNITTi SIG
Code Version 2014
Application StatusApproved St. Lucie County, FL
*Approved by DBPR.Approvals by DBPR shall be reviewed and ratified
by the POC and/or the Commission if necessary.
Commentsr1
Archived ! �.: P/
Product Manufacturer IKO Industries,
Address/Phone/mail 40 Hansen Road South
Brampton,NON-US L6W 31-14
(708)496-2800 Ext 200
rmetz0o1@tampabay.rr.com APR 12 2017
Authorized Signature Robert Metz PERMITTING
rmetz001@tampabay.rr.com St. Lucie County, FL
Technical Representative Bob Metz
Address/Phone/Email REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg,FL 33703
(727)776-5261
rrnetz001 0tampabay.rr.com
Quality Assurance Representative Don Shaw
Address/Phone/Email IKO Industries LTD
120 Hay Rd.
Wilmington,DE 19808
(717)579-6706
don.shaw*iko.com
Category Roofing
Subcategory Asphalt Shingles
Compliance Method Certification Mark or Listing
Certification Agency FM Approvals-CER
Validated By Locke Bowden
W Validation Checklist-Hardcopy Received
Referenced Standard and Year(of Standard) Standard Year
ASTM D3161 modified to 110 mph 2009
ASTM D3462 2009
ASTM D7158 Class H 2008
ASTM E108 2007
Equivalence of Product Standards
Certified By
https://www.floridabuilding.org/pr/pr app dtl.aspx?param=wGEVXQWtDgse7mYBd2b3... 2/21/2017
lK0
Installation Instructions for
Asphaft Shingles
Page 5 of 5
IKO Leading Edge Plus Application Instructions
(ASTNt D3161, Class F—IKO Leading Edge Plus)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS"WILL GOVERN.
1. Apply any underlayment,eave protection,valley flashings, or drip edges to roof deck as required.
2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for
separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat atperforation to
separate.
3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately
20"(500 mm). Install this shingle on the lower left comer of the roof deck, granule side up,with the
factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves
by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4"(75
mm to 100 mm,1from the eave edge and 1"(25 mm)in from each end.
4. Take the leftover 20"(60f mm)piece shingle.Rotate the piece and align it vertically up the rake edge
with the factory installed bealant adjacent to the outer edge of the roof.The shingle should overhang
the rake edge by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with fasteners
located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end.
5. Repeat Steps 3—4 for the right lower comer of the roof deck.
NAILING: Use galvanized(zinc coated) roofing nails, 11 or 12 gauge,with at least
3/8"(9 mm)diameter heads,long enough to penetrate through plywood or 3/4"(20
mm)into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from
the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end.
6. Apply full-length I KO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install
the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles
should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to
the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle.
7. Apply roof shingles as per the instructions printed on each product's package.Make certain the first
course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way,
the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and
help keep them from lifting in high winds.
PRI COMWCdon A4alet*TwMobgW,LLC.6412 Badger Odwe Tampa,FL 33610 Tel:813.621-5777 Fax:813.821-5840 a-mail:malefialstsfitg&bdcom WebSft hWAvww.prbKcom
IKO
Installation Instructions for
Asphalt Shingles
Page 4 of 5
IKO Hip and Ridge 12 Application Instructions
(ASTM D3161, Class F—IKO Hip and Ridge 12)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are
designed for a 51/8"(130 mm)exposure.(For a neater appearance,the top of each side of each piece has
been factory trimmed on a 1"(25 mm)taper(see drawing).Bend each piece over the hip or ridge,and nail 5
5/8" (143 mm) above the butt edge 1"(25 mm) in from each edge, exposing each piece 51/8"(130 mm).
Apply hip pieces starting at the lower end of the hip,working up toward the ridge.On hip roofs, apply ridge
pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end
opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional
effect,(which is recommended,but not required),apply hip and ridge shingles double thickness by stacking 2
pieces on top of one another,the lower piece extending about 314"(19 mm)further than the top piece(see
diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be
covered with cement. r to application in cold weather,storing the shingles in a heated area will allow for
easier bending.
NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEY ARE DESIGNED FOR USE AS HIP AND RIDGE
SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS.WE ASSUME NO
RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO
PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER
VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW
ALL APPLICABLE BUILDING CODES.MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR
TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS.
r
i19 n•m 'o"'""
TAPER CUT
S Mr � \
6 39'
4102mm)
PRI Construction Wedals Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813.621-5840 a-mail:ma4e WsWs iq tcom Website:hdp•Jlwww.0mtcom
IKO
Installation Instructions for
Asphalt Shingles
Page 3 of 5
IKO Laminated Shingles Application Instructions
(ASTllit D3164, Class F-Cambridge, Cambridge HD, and CRC Blltmore AR)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or otherApproved underiayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING:Use galvanized(zincoated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8"
below the top edge,approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with,
but not cutting into shingle surface.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8'.
NAILING-STEEP SLOPES APPLICATION
Use six veils as shown_
4
7 31W _
NAIL LINE
6 315'1' :
r � V
1
NAILS CBIENT
PROPER APPLICATION REQUIRES THAT THE NAGS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF THE SMNGLE
PRI ConshucWn Maher TecMologies,LLC.6412 Badger Me Tampa,FL 33610 Tel:813.821-5777 Fax:813821-5840 e-mail maW6-A lesf @priw*= WebShe:hlgxfAwwr.pricmlcom
IKO
Installation Instructions for
Asphaft Shingles
Page 2 of 5
IKO Shingle Application Instructions — 3-Tab Shingles
(ASTM D3161, Class F—IKO Marathon 26 AR and CRC Supergtass M25AR)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT.THESE INSTRUCTIONS WILL GOVERN
ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof sloe is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by t9"or other Approved underlayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
undedayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements. -
NAILING:Use galvanized(zinc bated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt
edge,approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is
flush with, but not cutting into shingle surface.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8°.
STEEP SLOPES
_ 1-1a, 1-III' 1-yI .—
I-
i SEALING 9W 0 0 �—
NAILS NAILS
DO NOT NAIL INTO OR ABOVE THE SEALING STRIP
PRI CaaWcbm L4a*dals Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 a rnait m#WWstesing@privatcan WebSile:h1pJNA w.pdcmlcom
Florida Building Code Online Page 2 of 3
Product Approval Method Method 1 Option A
Date Submitted 06/28/2015
Date Validated 06/30/2015
Date Pending FBC Approval
Date Approved 07/06/2015
Summery of Products
FI.* Model,Number or Name Description
7006.1 Cambridge,Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle
Biltmore AR manufactured at IKO's Kankakee,IL; Hawkesbury,Ont.;
Wilmington,DE;Sylacauga,AL and Toronto,Ont.plants
Limits of use Cion Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter ASTM d3161 letter 4-15-
Approved
15Approved for use outside HVHZ:Yes 2015 .odf
Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM 43462 letter-5 F
Design Pressure:N/A 15.odf
Other: FL7006 R9 Q CAC FM Letter-ASTM E 108 letter- 5 3
15 .odf
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 It 1KO-133-02-01 Letter-Installation
Instructions for FBC FL7006.odf
Verified By: Duc T Nguyen 65034
Created by Independent Third Party: No
= Evaluation Reports
Created by Independent Third Party:
7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"fiberglass asphalt shingle used to cover
shingles the hip and/or ridge of an asphalt shingle roof system
manufactured in Toronto,Ont.and Brampton,Ontario
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter ASTM d3161 letter 4-15-
Approved
15Approved for use outside HVHZ:Yes 2015 .odf
Impact Resistant:N/A EL7006 R9 C CAC FM Letter ASTM d3462 letter 5 6
Design Pressure:N/A 15.0df
Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
.15 Ddf
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 II yip and Ridoe Can Shinaig Installation
Instructions,adf
FL7Q06 R9 Il 1KO-1 3-02-01 Lather-Installation
Instructions for FBC FL7006.odf
Verified By:Duc T Nguyen PE 65034
Created by Independent Third Party:No
Evaluation Reports
Created by Independent Third Party:
7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at
Starter Strip the bottom of a roof system manufactured in Brampton and
Hawkesbury,Ontario plants
Limits of Use Certlfrcatwn Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-AST dM( 3161 letter- 4-15-
Approved for use outside HVHZ:Yes 2015 .odf
Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTMd34462 lettgr-5 6
Design Pressure:N/A 15.0df
outer. FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
15 .odf
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 Il IKO-133-02-01 Letter-Installation
Instructions for FBC FL7006.0
FL7006 R9 Il Rooffipo Products Leading egg Plus
ABpilf t:a'on-E (i).odf
Verified By: Duc T Nguyen PE 65034
Created by Independent Third Party:No
Evaluation Reports
Created by Independent Third Party:
7006.4 Marathon 25 AR,CRC Superglass 3 tab fiberglass asphalt shingle manufactured at IKO's
M25AR Brampton,Ontario,Hawkesbury Ont.,Toronto,Ont.;
Sylacauga,AL and Kanakakee,IL plants
https://www.floridabuilding.org/pr/pr app dtl.aspx?param=wGEVXOwtDgse7mYBd2b3... 2/21/2017
Florida Building Code Online Page 3 of 3
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM_Letter-ASTM d3161 letter- 4-15-
Approved for use outside HYHZ:Yes 2015 .Ddf
Impact Resistant:N/A FL7006 R9 C CKC FM Letter ASTM d3462 letter 5 6
Design Pressure:N/A 15.odf
Other: FL7006 R9 C CAC FM Letter-ASTMS 108 letter- 5 3
IS .ndf
Quality Assurance Contract Expiration Date
12/20/2020
Installation Instructions
FL7006 R9 II IKQ-133-02-01 Letter-Installation
Int cams for FAX FL7006.ndf
Verified By: Duc T Nguyen 65034
Created by Independent Third Party:No
Evaluation Reports
Created by Independent Third Party:
Contact ;:2601 Blair Stone Road-Tawhassea FI 32399 Phone:350-481-181a
The State of Florida Is an AAIMO employer.Copyright 2007-2013 State of Florida.::privacy Statement:: ::Rehind Statement
Under Florida law,erne addresses are pudic records.If you do not want your e-mail address released in response to a pub k-records request,do not send
electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any 9uesWns,please contact 850.487.1395.-pursuant to
Section 4SS.27S(l),Florida Statutes,effective October 1,2012,licensees licansed under Chapter 455.F.S.must provide the Department with an arta#address N
that'have one.The emalls provided may be used for official communication with the licensee.However email addresses are public record.R you do not wish to
supply a personal address,please provide the Department with an mil address which can be made available to the public.To determine if you are a licensee under
Chapter 455,F.S.,please dick bM.
Product Approval Acceptsu
CrechttCard
Safe
II
https://www,floridabuilding-org/pr/pr app_dtfaspx?param=wGEVXQwtDgse7mYBd2b3... 2/21/2017
CONSTRUCTION MATERIALS
TECHNOLOGIES
March 30,2015
IKO Industries, Ltd
120 Hay Rd.
Wilmington, DE 19809
Re: FBC FL7006
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliarlip the 2014 Florida Building Code.
This review was completed bas on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle Application Instructions–3-Tab Shingles
(EN-3Tab Appins_8AGXEFS-2012-11 reformatted 2013-02-rev07/13-Florida)
2) IKO Laminated Shingles Application Instructions
(EN-Laminated Appins_8TTEFS-2012-04 reformatted 2013-02-rev07/13-Florida)
3) IKO Hip and Ridge 12 Application Instructions
(EN-HipandRidge12_3HRTd-2013-08–reformatted 2013-08)
4) IKO Leading Edge Plus Shingle Application Instructions
(EN-3LEP-Tri-2012-06_reformatted 2013-03)
5) ASTM D3161 Test Report(FM Approvals Project No. 3040947)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict,these instructions shall govem.
Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen,FL P.E.do not
have nor plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
4,Signed: � IL� Signed: — -�--
Brad Grzyboyfsk(l Duc T n
Managing Dfirector FloridaR8g1 roTesstonal Engine r
P.E.Number.65034
Date: April 30,2015 Date: April 30,2015
Attachments: A) IKO Shingle Application Instructions-3-Tab
B) IKO Laminated Shingles Application Instructions
C) IKO Hip and Ridge 12 Application Instructions
D) IKO Leading Edge Plus Application Instructions
IKO-133-02-01
PRI Caistwom Mffi rials Technologies,LLC.6412 Badger Orhe Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5640 e-nk*mdwd*tedM@prbac rn WebSNe:h1tp1 www.priantcom