Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutInspection Docs St Lucie County Inspections.
. 300 Vir91 Avenue '
Ft-pierce, FL 34982
Q FRI (772) 4 62-2I72
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT tt 17b 'Ll JOB ADDRESS__:��Z2 f>U"��If���t�
BUILDER
—
R & F Pest Contrcj-4 Inc
PT;ST CONTROL CONTRACTOR 1856 s
Port St Lucie, FL 34984 -
PEST CONTROL LICENSE
We, the ctntiersigned, hereby certify that we have pretreated the above-described constrtiction for
st,ibterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: I n " � Chemicals
Percentage ofsoltttion: .. Total gallons tis£d:
V i w� .•^
Date of treatment: 7 _ Time of Treatment: e,`
Q rooting;
Q 1st Tt'efiUnent FBCI04.2.6 Certifieale©f Proteellpe TrealtnentforpreNentioil of termites,
Q
Re ret1E
A tt�eather resistant jobsiie postlttg board shall be proidded to receile,' r
�. duplicate Treatmelrl Cerlrficales its each retlutred protecth)e treatment Is
Slab I� completed,providing a cop}for the person the permit is issued to and
attolher copy for the building permit files, the Treatment Cet7 tale sltrrll
ISL Treatmetlt provide the product Lased, identity of the applicator, time aril date of rite
Re-traaE treninaeut,site locwion, area ireateel, chemical used,percent couceataniioat
C1 D r ivc-,w a rum camber of gallons used, to establish a Verifiable record of proteetitte
trv.a,/tuent.,If the soil chemical barrier method for ierntile preuentloa is ttsetl,
1St TTeACt�ient final exteriortrealmentshall be,s~ompleted priortofsaal building approval,
Re-treat St Lucie Cotinty requires for the final inspection for CO,a Perinanent
Q Pools i Sticker to be placed on tate electrical panel box cover,listing all tile,
Q 1st Trentniet7t ns.
treatinents and,elates of appl9ctitio .
Re-treat
Q of 16
tst Trentment
Re-treat _
Q Perimetez -for Final Inspection
Sit; attire of exterminator,
NOT!?`:
There lutist be a conipleted forth far each required treatitletit or re-ireatntent and this forriz rtarst be tall
the job site to be picked lip by the inspector at tinge of each inspection or the scheduled irispectlon will
fail and a re-ittspe.etioit fee chargee!.