Loading...
HomeMy WebLinkAboutInspection Docs --. _ Planning Development Services Building &Code Regulation Division 2300 Virginia Ave • • Fort Pierce, FL 341982 - - - 772-462-2 .72 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: -203 -b3h JOE ADDRESS: �3 ll N W -� :SI', I �. �i` , BUILDER/CONTRACTOR: _ marts ka,�-­ R-'1.14111A4 PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CON OL INC. PEST CONTROL LICENSE #:JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. / / i Square feet if area treated: L `JChemicals used: BASELINE Percentage of solution: •06% Total gallons used:-7 l J Date of Treatment: / Time of Treatment: FootingSlab 1st Treatment 1st Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter for I al Inspection 1st Treatment Re-Treat A� 4-17 Signature of Exterminator Date /Vote: There must be a completed form for each required treatment or re-treatment and th/s form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re-Inspection fee charged, j FOC104.2.6 Certificate of Protective Treatment far preventlon of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area treated,chemical used,percent concentration and number ofgallons used, to establish a ved fable record of protective treatment. If the soli chemical barrier method for termite prevention is used, final 'exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for C®, a Permanent Sticr to Ibe placed on the electrical panel boas cover, listing all the treatments and dates of applica#i®ns. Revised 7/24/2014 I i