HomeMy WebLinkAboutProduct Approval Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQw...
t �!-r•j;' r,, vi* `.�f LSF � ��I�
-r
s,
1 .
BCLS Home i Log In User Registration s Hot Topics I Submit Surcharge Stats&FacLs ', Publications FBC Staff BC15 Site Map Links Search s
Fbl ida
f=; °'<:d,
Product Approval
USER:Public User 'Opr
... . ..l��rfil�� •. .
Product Aoproval Menu>Product or Application Search>Application List>Appflotbn Detal
FL# FL7006-119
1
Application Type Revision .
Code Version 2014
Application Status Approved
.... *Approved by DBPR:'APproval§by DBPR shall be reviewed and ratified
by the POC and/or the Commissl n if necessary.
Comments
Archived
i
Product ManufacturerIKO Industries,Ltd
.Q,
Address/Phone/Email. 40 Hansen Road South.
Brampton,NON-US L6W 3H4 "
(708)496-2800 Ext200
rmetzOO1@tampabay.rr.com
Authorized Signature Robert Metz
rmetzOO1@tampabay.rr.com
Technical Representative Bob Metz
Address/Phone/Email: REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg, FL 33703
'(727)776-5261
rmetz001@tampabay.rr.com
Quality Assurance Representative Don Shaw
Address/Phone/Email IKO Industries LTD
120 Hay Rd.
Wilmington,DE 19808
(717)579-6706
don.shaw@iko.com
Category Roofing
Subcategory Asphalt Shingles
Compliance Method. Certification Mark or.Listing
Certification Agency FM Approvals-CER
Validated By Locke Bowden
Validation Checklist-Hardcopy Received
Referenced Standard and Year(of Standard) Standard Year
ASTM D3161 modified to.110 mph 2009
ASTM D3462 2009
ASTM D7158 Class H 2008
ASTM E108 2007 .
1 of 3 3/14/2017 5:57 PM
Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEUXQw...
Equivalence of Product Standards
Certified By
Product Approval Method Method 1 Option A
Date Submitted 06/28/2015
Date Validated 06/30/2015
Date Pending FBC Approval
Date Approved 07/06/2015
Summary of Products
FL# ber or Name Description
7006.1 Cambridge, ambridge HD.and CRC Laminated architecturi fiberglass asphalt shingle
iltniore manufactured at IKd'sl Kankakee, IL; Hawkesbury,Ont.;
Wilmington,DE; Sylacauga,AL and Toronto;Ont.plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter
Approved for use outside HVHZ:.Yes 4-15-2015•.pdf
Impact Resistant::N/A FL7006 R9 C CAC FIM Letter-ASTM d3462 letter-5 6
Design Pressure:'N/A 15.1)df
.Other: FL7006 R9 C CAC FM Letter--ASTM E 108.letter- 5 3..
15 .pdf
Quality Assurance Contract Expiration.Date
12/31/2020
Installation Instructions
FL7006 R9 1I IKO-133-02-01 Letter-Installation
Instructions for FBC FL7006.pdf
Verified By: DucT'Ng'uyen 65034
Created by Ind epend'entThird Party: No
Evaluation Repos'(
Created by Indepertndent Third Party:
i
7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"'fiberglass asphalt shingle used to cover
shingles the hip and/or ridge of an asphalt shingle roof system
manufactured in Torohto, Ont.and Brampton;Ontario
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC 'I M Letter-ASTM d3161 letter-
Approved for use outside HVHZ:Yes 4-15-2015 .pdf
Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6
Design Pressure: N/A 15.pdf
Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 53
15 .pdf
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions -
FL7006 R9 1I Hio and Ridge Cap Shingle Installation
Instructions.pdf
FL7006 R9 II• IKO-133-02-01 Letter-Installation
Instructions for FBC FL7006,pdf
Verified By: Duc T Nguyen PE 65034 .
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
7,006.3 Leading Edge Plus Asphalt Shingle One piece fibergla;ss'asphalt shingle used as a starter strip at
Starter Strip the bottom of a roof system manufactured in Brampton and
Hawkesbury;Onta,riol plants
Limits of Use Certification,Agency Certificate
Approved for use in HVHZ:Yes 'FL7006 R9 C CAC'IFM Letter-ASTM d3161 letter-
Approved for use outside HVHZ:Yes 4-15-2015 .pdf
Impact Resistant: N/A FL7006 R9 C CAC'FM Letter-ASTM d3462 letter-5 6
Design Pressure: N/A 15.odf
Other: FL7006 R9 C CAC I FM Letter-ASTM E 108 letter- 5 3
15 .pdf
2 of 3 3/14/2017 5:57 PM
I KO
Installation Instructions for
Asphalt Shingles
Page 3 of 5
IKO Laminated Shingles Application Instructions
(ASTM D3161, Class F—.Cambridge,:Cambridge HD,,and CRC Biltmore AR)
NOTE: THESE INSTRUCTIONS SHALL. BE USED IN CONJUCTION Wlj H IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS wILL:GOVERN...
ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or other Approved underlayments in accordance jwith the qualified application .....
instructions. For areas where the roof slope is 4'.' per foot or greater,.cover the.deck with.one ply of
underla ment laid parallel to the eaves,'with 2"horizontal la s and 4"end laps. Apply metal drip edges on to
y p P P � PP Y . P 9 P
of any underlay along rake edges and directly to the deck along eaves:in accordance with building code
requirements. ,
NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into board&- Use 4 nails per shingle placed in the nail line 7-3/8"
below the top edge, approx. 1"and 13" in from each end.. Drive nails straight so that nail head is flush with,
but not cutting into shingle surface.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more, use 6 nails pershingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thicknesslof a quarter)spots of asphalt
plastic cement placed.under the shingle 2" above the,bottom edge and equally Ispaced along the.shingle. .....
.Apply plastic cement in moderation since excessive amounts may'cause blistering. CAUTION:Shingles
should seal to the underlying course when the factory.applied asphalt sealant'•is!sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8".
NAILING—STEEP SLOPES APPLICATION
Use six nails as shown.
7 3/8"
NAIL LINE
6 3/Wt rl"r— . '
NAILS CEMENT
PROPER APPLICATION:REQUIRES THAT THE NAILS:PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF THE SHINGLE
PRI Construction Materials Technologies,L
LC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail;materlaist6sfing@pdcmt.com Website:http:lMiww.pricmLcom
IKO
Installation Instructions for
Asphalt Shingles
Page 5 of 5
IKO Leading Edge Plus Application Instructions
(ASTM D3161, Class F—IKO Leading Edge Plus)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS.AND THE APPLICABLE CODE.'.IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.:
1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required.
2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwisefor
separation into two(2)shingles.Take one IKO.Leading Edge Plus strip,and fold flat at perforation to
separate.
3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 Mm x 168 mm,)and remove approximately
20"(500 mm). Install this shingle.on the lower left corner of the roof de'ck�, granule side up,with the.
factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves
by a nominal 1/4"(6 mm)minimum..Fasten the shingle to the roof deck w i�h nails located 3"to 4"{75
mm to 100:mm)from the eave-edge and 1"(25 mm) in from each end.
- 4. Take the leftover 20"(500 mm)piece shingle. Rotate the piece and align it vertically up the rake edge
with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang
11
the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with fasteners
located 3"to 4"(75 mm to 100 mm),from the rake edge and-1" (25m )1in from each end.
5. Repeat Steps 3—.4.for the rightlower corner of the roof deck..
NAILING:-Use galvanized (zinc.coated) roofing nails, 11:or 12 gauge,with at least
3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20
mm) into boards. Use 4 nails.per shingle placed 3"to 4" (75 mm to 100 mm)from .,
the eave edge and approximately 1 and 13"(25 mm and 330 mm)in from each end.:
1
6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install
the shingles granule side.up with the factory applied sealant adjacent to the eaves. The.shingles
should overhang the rake edge and eaves by a nominal 1/4"(6.mm)minimum. Fasten the shingles to
the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle.
7. .Apply roof shingles as per the instructions printed on each product's package. Make certain the first
course of field shingle lies flush with the edges of the fastened-IKO Leading Edge Plus. In this way,
the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and
help keep them from lifting in high winds.
PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail;materialslesting@pricmtcom WebSite:http:/MWw.pdcmt.com
CONSTRUCTION MATE
RIALS
TE:CHNOLOG:IES .
March 30, 2015.
IKO:Industries, Ltd
120 Hay Rd.
Wilmington, DE 19809
Re: FBC FL7006
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2014 Florida Building-Code. .
Ir
This review was completed based on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle Application Instructions".3-Tab Shingles
(EN-3Tab Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13=Florida).
2) .IKO Laminated Shingles Application Instructions
(EN-Laminated Appins_8TTEFS-2012-04 .reformatted 2013=02-rev07/13-Florida)
3) IKO Hip and Ridge 12.Application Instructions
(EN-HipandRidge 12_3HRTri-2013-08_reformatted 2013-08)
4) IKO Leading Edge Plus Shingle Application lnstructio'hs
(EN-3LEP -Tri-2012-06_reformatted:2013-03)
5) ASTM D3161 Test Report(FM Approvals Project No. 3040947)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict; these instructions shall govern .
Statement of Independence:PRI Construction Materials Technologies and/or Duc T. Nguyen, FL P.E.do riot
have nor plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
Signed: / Signed:
Brad Grtybo skiDuc
Managing Director Florida Re ered Professional Engineer
LE.Number:65034
Date: April 30,2015 Date: April 30, 2015
Attachments: A) IKO Shingle Application Instructions-3=Tab
B)'IKO Laminated Shingles Application Instructions
C) IKO Hip and Ridge 12,Application Instructions
D.) IKO Leading Edge Plus Application Instructions
IKO-133-02-01
PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 a-mail:materialstIes6ng@pricmt.com WebSite:hftp:/Iwww.pricmtcom