Loading...
HomeMy WebLinkAboutProduct Approval Florida Building Code Online Page 1 of 3 ;;.; ,. ., �/�IiItirjS�t lr ::9i : r:: M1.►�ecaal�:&Ydd BCIS Home Lag In User Registration Hot Topics Submit Surcharge Stats&Facts Publications f FBC Staff BCIS Site Map Links Search dbu­ a APT) Product Approval lUSERPublicUserr� Product Approval Menu>Product or Application Search>Application Lis l>Application Detail t}e FL# FL7006-R9 L e ` •� ` Application Type Revision Code Version 2014 Application Status Approved *Approved by DBPR.Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission'if necessary. Comments Archived 1 1 Product Manufacturer IKO Industries,Ltd Address/Phone/Email 40 Hansen Road South Brampton,NON-US L6W 31­14 (708)496-2800 Ext 200 rmetzOOI@tampabay.rr.com Authorized Signature Robert Metz rmetzOOI@tampabay.rr.com Technical Representative Bob Metz Address/Phone/Email REMCO of Pinellas 456 Avila Circle NE Saint Petersburg,FL 33703 (727)776-5261 rmetzOO1@tampabay.rr.com Quality Assurance Representative Don Shaw Address/Phone/Email IKO Industries LTD 120 Hay Rd. Wilmington,DE 19808 (717)579-6706 don.shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals-CER Validated By Locke Bowden R6 Validation Checklist-Hardcopy Received Referenced Standard and Year(of Standard) Standard Year ASTM D3161 modified to 110 mph 2009 ASTM D3462 2009 ASTM D7158 Class H 2008 ASTM E108 2007 Equivalence of Product Standards Certified By httDS:Htloridabuildin2.orL/nr/nr anD dtl.asnx?Daram=wGEVXOwtDase7lnYRd2b3K6mX... 9/23/2017 Florida Building Code Online Page 2 of 3 Product Approval Method Method 1 Option A Date Submitted 06/28/2015 Date Validated 06/30/2015 Date Pending FBC Approval Date Approved 07/06/2015 Summary of Products FL# Model,Number or Name Description 7006.1 Cambridge,Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle Biltmore AR manufactured at IKO's!,Kankakee,IL; Hawkesbury,Ont.; Wilmington,DE;Sylacauga,AL and Toronto,Ont.plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .odf Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure:N/A 15.ndf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .odf , Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 119 II IKO-133''-02-01 Letter-Installation Instructions for FBC FL7006.pdf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports 1 , Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"fiberglass asphalt shingle used to cover shingles the hip and/or ridge of an asphalt shingle roof system manufactured in Toronto,Ont.and Brampton,Ontario Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .Ddf Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure:N/A 15.0f Other: FL7006 R9 C CAC FM'Letter-ASTM E 108 letter- 5 3 15 ,Ddf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II HID and Ridge Cap Shingle Installation Instructions.1)d FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury,Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .pdf Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure: N/A 15.pd Other: FL7006 R9 C CAC FM'Letter-ASTM E 108 letter- 5 3 15 .pd Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.1)df FL7006 R9 II Roofing-Products-Leadino-Edge-Plus- Application-EN(1).pdf ' Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.4 Marathon 25 AR,CRC Superglass 3 tab fiberglass asphalt shingle manufactured at IKO's M25AR Brampton,Ontario,Hawkesbury Ont.,Toronto,Ont.; Sylacauga,AL and Kanakakee,IL plants hftne•//flnrirlahiyilrlina nra/nr/ra- nnn rltl ncnv?narnn-i=xarC�.FV)CnixitT)ncr 7mVRrl7h' WAn-tY R/)'2/7017 Florida Building Code Online Page 3 of 3 Limits of Use Certification Agency!Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter'- 4-15- Approved for use outside HVHZ:Yes 2015 .Ddf Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter -5 6 Design Pressure:N/A IS.Ddf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 1S .ndf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: Back Ngxt Contact Us::2601 Blair Stone Road.Tallahassee Fl.32399 Phone:850-487-1824 The State of Florida is an AA/EEO employer.Copyright 2007-2013 State of Florida.::Privacy Statement::'Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click berg_. Product Approval Accepts: M OA ® eChecl M Credit Card Safe httnc•//flnririahnilriina nraMr/nr nT1n rltl neny7nnrnm=wC'TF.V VC)xArtT)neP7mVRr17h'lV(im)( R/1)1/1) 17 CONSTRUCTION MATERIALS TECHNOLOGIES March 30,2015 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2014 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab Appins_8AGXEFS-2012-11 reformatted 2013-02-rev07/13-Fl6rida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-Hipand Ridge 12_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report(FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence:PRI Construction Materials Technologies and/or Duc,T. Nguyen,FL P.E.do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. i Signed: �/� Signed: Brad Grzybo ski Duc T. u en Managing D rector Florida Refit ere Professional Engineer P.E.Number:65034 Date: April 30, 2015 Date: April 30,2015 Attachments: A) IKO Shingle Application Instructions -3-Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-133-02-01 PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:matedalstes6ng@pricml.com WebSite:httpl/vmw.pricmi.com IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F—IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads, long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge, approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES t-trr' t-trz' SEALING STRIP 8-118' 1f2• 7f NAILS NAILS DO NOT NAIL INTO OR ABOVETHE SEALING STRIP PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813.621-5777 Fax:813621-5840 e-mail:matedalstesling@pricml.com WebSite:http:/A%W.pricmt.com IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by,full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least.3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"perfoot(600)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". NAILING-STEEP SLOPES APPLICATION Use six nails as shown. 7 318" ♦ NAIL LINE M F] -1 l ,, NAILS CEMENT PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:malerialstesting@pricml.com WebSi1e:http:/Avww.pricmt.com IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F— IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONDUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 5 1/8"(130 mm)exposure. (For a neater appearance,the top of each side of each piece has been factory trimmed on a 1"(25 mm)taper(see drawing). Bend each piece over the hip or ridge, and nail 5 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional effect, (which is recommended,but not required),apply hip and ridge shingles double thickness by stacking 2 pieces on top of one another, the lower piece extending about 3/4"(19 mm)further than the top piece(see diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USEAS HIP AND RIDGE SHINGLES ONLY,AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POORAPPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW ALL APPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. 1 f ' JK- (25 mm( 09—) TAPEn CUT \ 6 aW n 62 mm) PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813621-5777 Fax:813-621-5840 e-mail:materialslesring@pricml.com WebSile:htlp:/MAvw.pricmt.com IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F— IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required. 2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip,is perforated lengthwise for separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up, with the factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4" (75 mm to 100 mm)from the eave edge and 1"(25 mm)in from each end. 4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it Vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with fasteners located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end. 5. Repeat Steps 3_4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge,with at least 3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20 mm) into boards. Use 4 nails per shingle placed 3"to 4" (75 mm to 100 mm)from the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and help keep them from lifting in high winds. PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:malerialstesting@pricmt.com WebSite:htlpJMnvw.pdcmtcom Florida Building Code Online Page 1 of 2 �if SCIS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications I FBC Staff j SCIS Site Map Links Search Florida 1I/� (OProduct Product Approval lr}�'.' I I�,I 16A"USER:Public User Product Approval Menu>Product or Application Search>Application List>Application Detail Vit# FL# FL16048-R4 J Application Type Revision Code Version 2014 Application Status Approved 1 111 J Comments Archived ❑ 1 Product Manufacturer Tri-Built Materials Group,LLC Address/Phone/Email PO Box 70 Rutherford,NJ 07070 (800)516-1485 david.ruiz@tribuiltmg.com Authorized Signature David Ruiz david.ruiz@tribuiltmg.com Technical Representative David Ruiz Address/Phone/Email 250 Route 17 North East Rutherford,NJ 07073 (201)842-2449 david.ruiz@tribuiltmaterialsgroup.com Quality Assurance Representative Address/Phone/Email Category Roofing Subcategory Underlayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed Robert Nleminen the Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 10/16/2017 Validated By John W.Knezevich,PE P Validation Checklist-Hardcopy Received Certificate of Independence FL16048 R4 COI 2016 01 COI Nieminen odf Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2009 ASTM G155 2005 FRSA/TRI April 2012(04-12) 2012 TAS 103 1995 Equivalence of Product Standards Certified By Sections from the Code http://www.floridabuilding.org/pr/pi_app_dti.aspx?param=wGEVXQwtDgtFPmdYiNDWr... 1/26/2017 Flbrida Building Code Online Page 2 of 2 Product Approval Method Method 1 Option D Date Submitted 10/06/2016 Date Validated 10/17/2016 Date Pending FBC Approval 10/19/2016 Date Approved 12/13/2016 Summary of Products FL# Model,Number or Name Description 16048.1 TRI-BUILT Roof Underiayments Self-adhering,modified bitumen roof underlayments Limits of Use Installation Instructions Approved for use in HVHZ:No FL16048 R4 11 2016 10 FINAL ER TRI- Approved for use outside HVHZ:Yes BUILT UNDERLAYMENTS FL16048-R4.Ddf Impact Resistant:N/A Verified By: Robert Nieminen PE-59166 Design Pressure:+N/A/-67.5 Created by Independent Third Party:Yes Other: 1.)The design pressure noted herein pertains to use Evaluation Reports of foam-on the systems overtop the self-adhering FL16048 R4 AE 2016 10 FINAL ER TRI- underlayment for one particular application.See ER Section BUILT UNDERLAYMENTS FL16b48-R4.Ddf 5.6.4 for details.2.)Refer to ER Section 5 for other Limits of Created by Independent Third Party:Yes Use. Back Next Contact Us::2601 Blair Stone Road,Tallahassee R 32399 Phone:850-407-1824 The State of Florida is an AA/EEO employer.Copyright 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please contact 850.487,1395.'Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here. Product Approval Accepts: Credit Card Safe http://www.floridabuilding.org/pr/pr app dtl.aspx?param=wGEVXQwtDgtFPmdYiNDWr... 1/26/2017 EXTERIOR RESEARCH&DESIGN,LLC. Q0 Certificate of Authorization 119503 TRN STREET, UNIT#13 INITY ERD 353 CHRISTIAOXFORD, CT 06478 PHONE: (203) 262-9245 FAX:(203) 262-9243 EVALUATION REPORT Allied Building Products Corp. Evaluation Report A42960_10.12-R4 dba TRI-BUILT Roofing Products FI-16048-114 9050 Louisiana Street Date of Issuance:10/25/2012 Merrillville, IN 46410 Revision 4: 10J06/2016 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Eva luation.Report is valid until such time as the named product(s)changes,the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance.of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed;then it shall'be done in its entirety. INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through S. Prepared by: 4 5 — :0'. c.-^�ti.•qtr^, Robert J.M.Nieminen P.E. �r,CS"'•" The facsimile seal appearing was authorized byRobertNleminen, i„r�IONav•tr:r ,,,trr,sss P.E.on 10/06/2016.This does not serve as an electronically signed Florida Registration No.59166,Florida DCA ANE1983 document—Signed,sealed hardcoples have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: 1. TrinitylERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinity I ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. TRINITYIERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub-Category: Underlayment Compliance Statement: TRI-BUILT Roof Underlayments,as produced by TRI-BUILT,have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009 1507.4.5.1,1507.5.3,1507.7.3 1504.6 Accelerated Weathering ASTM G155 2005 1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012 1523.6.5.2.1 Physical Properties TAS 103 1995 3. REFERENCES: Entity Enminatlon Reference Date ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013 ERD(TST6049) Physical Properties S40540.11.13 11/19/201-3 ERD(TST6049) Physical Properties 540540.03.14 03/26/2014 ERD(TST6049) Physical Properties S44870.04.14-2 04/02/2014 ERD(TST6049) Physical Properties S44870.04.14-3 04/02/2014 ERD(TST6049) Physical Properties S44870.04.14-1 04/10/2014 ERD(TST6049) Physical Properties S44870.04.14-4 04/10/2014 ERD(TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014 ERD(TST6049) Physical Properties S43530.05.14 05/28/2014 ERD(TST6049) Physical Properties 540540.10.14 10/31/2014 ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015 ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015 UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015 UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017 4. PRODUCT DESCRIPTION: 4.1 Self-Adhering,Underlayments: 4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof underlayment,with a 36-inch sheet width. 4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified bitumen roof underlayment 4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering, glass-mat reinforced, film-surfaced, SBS modified bitumen roof underlayment. 5. LIMITATIONS: 5.1 This is a building code evaluation. Neither TrinityJERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and Design,I.I.C. Evaluation Report A42960.30.12-R4 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION F1.16048-114 Revision 4:10/06/2016 Page 2 of 5 rTRINITYIERD 5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval based on this evaluation combined with supporting data for the prepared roof covering- 5.5 Allowable roof covers applied atop the underlayments are as follows: ,.TABLE 1.'ROOF CO,VEfi OPTIONS, Underlayment Asphalt Nall-On Tile Foam-On Tile Metal Wood Shakes Slate Shingles &Shingles Tri-Built Sand-R SA Shingle Yes No No No Yes Yes Underlayment Tri-Built S/A HTTU Yes Yes Yes Underlayment See 5.5.1 Yes, Yes Yes Tri-Built Smooth HT S/A Yes No No Yes, Yes Yes Underlayment 5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion / long term aging data from an accredited testing laboratory is provided. ➢ Tri-Built S/A HT TU Underlayment with 3M` 2-Component Roof Tile Adhesive AH-160 (FL6332) or Dow TileBond'"Roof Tile Adhesive(FL717) 5.6 Allowable substrates are noted below: 5.6.1 Direct-Bond to Deck: Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: ➢ Plywood;ASTM D41 primed plywood; OSB;ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed Southern Yellow Pine;ASTM D41 primed structural concrete., While not required over plywood, OSB or Southern Yellow Pine substrates, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-adhering underlayment. 5.6.2 Bond-to-Insulation: Trl-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Trl-Built Smooth HT S/A Underlayment applied to: ➢ Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems (Tri-Built S/A HT TU Underlayment only), Insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D or TAS 114,Appendix J., 5.6.3 Bond to Mechanically Attached Base Laver: Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: Y ASTM D226,Type I or II felt. For installations under mechanically attached prepared roof coverings,, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems (Tri-Built S/A HT TU Underlayment only), base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04- 12). Exterior Research and Design,I.I.C. Evaluation Report A4296D.10.12-R4 Certificate ofAuthorizot/on#9503 FBG NON-HVHZ EVALUATION FL16048-R4 Revision 4:10/06/2016 Page 3 of 5 TRINITY ERD 5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems,where the underlayment forms part of the load-path. The following wind uplift limitations apply to d irect-deck underlayment systems that are not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 Maximum Design Pressure=-45.0 psf. Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ. Primer: (Optional)ASTM D41 Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. 5.6.4.2 Maximum Design Pressure=-67.5 psf. Deck: Structural concrete to meet project requirements to satisfaction of AHJ. Primer: Soprema Elastocol 600c Underlayment: Tri-Built S/A HTTU Underlayment,self-adhered. 5.6.4.3 Maximum Design Pressure=-60.0 psf. Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of AHJ. BaseSheet: So rema So ra-G or Modified So ra-G mechanically attached with nails (FBC 151 .5. 1 ) and tin caps(FBC 1517.5.2)spaced 6-inch o.c.at the 4-inch laps and 6-inch o.c. in three, equally spaced rows in the center of the sheet. Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. 5.7 Exposure Limitations: 5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left exposed for longer than 30-days after installation 5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. 6. INSTALLATION: 6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any'loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly Y to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlavment or Tri-Built Smooth HT S/A Underlayment: 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile applications: While priming is optional,TRI-BUILT recommends priming the.deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane tight. Firmly roll,broom or hand-press the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams in the course below,sealed in accordance with TRI-BUILT requirements. Exterior Research and Design,I.I.C. Evaluation Report A4296D.10.12-R4 Certificate oJAuthorizatlon#9503 FBC NON-HVHZ EVALUATION FL16048-114 Revision 4:10/06/2016 Page 4 of 5 TRINITY I ERD When installing at slopes above 8:12,TRI-BUILT recommends back-nailing in the overlap area at-the top of the sheet at 12-Inch o.c. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in each direction. For valleys,apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications(Tri-Built 5/A HT TU Underlayment only): Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. For foam-on tile applications, reference is made to Section 5.6.4 herein for wind resistance limitations that fall outside the scope of FRSA/TRI April 2012(04-12). Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted Qq agency for information on product locations covered for F.A.C.Rule 9N-3 QA requirements. 9. QUALITY ASSURANCE ENTITY: UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com -END OF EVALUATION REPORT- i Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R4 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL16048-R4 Revision 4:10/06/2016 Page 5 of 5